== Procedurefor requesting circuit production == | == Procedure for requesting circuit production == |
Line 4: | Line 4: |
1. Request to AEL: each subgroup to AEL with schematic diagram and PCB diagram (if possible) | 1. Submit a request form to [[http://gwdoc.icrr.u-tokyo.ac.jp/JGWDoc/Welcome.html|JGWDoc]]: by each subgroup to AEL with following 3 items, and contact to AEL chief |
Line 10: | Line 10: |
* Ordering electronic parts: by AEL * Making boards: by AEL |
* Discussions for design and schedule among subgroup and AEL members * Design of chassis and front/rear panels: by each subsystem or AEL * Final design with some detailed information ex. conectors, gender * Schedule * Selection and Order for electronic parts: by AEL * Manufacturing boards: by AEL |
Line 13: | Line 17: |
* Design chassis: by each subsystem or AEL * Making chassis: by AEL * Assembling into chassis: by AEL |
* Manufacturing chassis: by AEL * Assembling boards, connectors cables and etc. into chassis: by AEL |
Line 19: | Line 22: |
* Typically it takes 2 months to fix design and 3 more months for production. Please submit request form at least five months before the date you want to receive. | * Typically it takes 2 months to fix design and 3 more months for production. Please submit a request form at least five months before the date you want to receive productions. * When you submit a request form, please obtain a document number from JGWDoc with selection of the “Document Type” as “T” like T140XXXX using “Reserve Number” at top menu in each page of JGWDoc and fill necessary information. * If you make the same (or similar with small modifications) circuits you made before, please upload this request as a new version of the same document number. * Then please upload the request form to JGWDoc with schematic/PCB drawings(if possible) and tell AEL chief that you have uploaded a request form with the document number you obtained. Within a week, AEL group will contact you to discuss the detailed design and schedule for the production plan. * If you have any questions please contact AEL chief. |
Procedure for requesting circuit production
Submit a request form to JGWDoc: by each subgroup to AEL with following 3 items, and contact to AEL chief
- Design of schematic diagram: by each subsystem
- AEL may introduce existing schematic diagrams (EX.LIGO DCC)
- Design of PCB digram: by each subsystem or AEL
- AEL may introduce existing PCB diagrams (EX.LIGO DCC)
- Discussions for design and schedule among subgroup and AEL members
- Design of chassis and front/rear panels: by each subsystem or AEL
- Final design with some detailed information ex. conectors, gender
- Schedule
- Selection and Order for electronic parts: by AEL
- Manufacturing boards: by AEL
- Soldering electronic parts: by AEL
- Manufacturing chassis: by AEL
- Assembling boards, connectors cables and etc. into chassis: by AEL
- Inspection: by each subsystem (or AEL)
- Typically it takes 2 months to fix design and 3 more months for production. Please submit a request form at least five months before the date you want to receive productions.
- When you submit a request form, please obtain a document number from JGWDoc with selection of the “Document Type” as “T” like T140XXXX using “Reserve Number” at top menu in each page of JGWDoc and fill necessary information.
- If you make the same (or similar with small modifications) circuits you made before, please upload this request as a new version of the same document number.
- Then please upload the request form to JGWDoc with schematic/PCB drawings(if possible) and tell AEL chief that you have uploaded a request form with the document number you obtained. Within a week, AEL group will contact you to discuss the detailed design and schedule for the production plan.
- If you have any questions please contact AEL chief.