Differences between revisions 1 and 2
Revision 1 as of 2015-03-10 11:22:58
Size: 917
Comment:
Revision 2 as of 2015-03-10 11:48:34
Size: 2007
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
== Procedurefor requesting circuit production == == Procedure for requesting circuit production ==
Line 4: Line 4:
 1. Request to AEL: each subgroup to AEL with schematic diagram and PCB diagram (if possible)  1. Submit a request form to [[http://gwdoc.icrr.u-tokyo.ac.jp/JGWDoc/Welcome.html|JGWDoc]]: by each subgroup to AEL with following 3 items, and contact to AEL chief
Line 10: Line 10:
 * Ordering electronic parts: by AEL
 * Making boards: by AEL
 * Discussions for design and schedule among subgroup and AEL members
  * Design of chassis and front/rear panels: by each subsystem or AEL
  * Final design with some detailed information ex. conectors, gender
  * Schedule
 * Selection and Order for electronic parts: by AEL
 * Manufacturing boards: by AEL
Line 13: Line 17:
 * Design chassis: by each subsystem or AEL
* Making chassis: by AEL
 * Assembling into chassis: by AEL
 * Manufacturing chassis: by AEL
 * Assembling boards, connectors cables and etc. into chassis: by AEL
Line 19: Line 22:
 * Typically it takes 2 months to fix design and 3 more months for production. Please submit request form at least five months before the date you want to receive.  * Typically it takes 2 months to fix design and 3 more months for production. Please submit a request form at least five months before the date you want to receive productions.
 * When you submit a request form, please obtain a document number from JGWDoc with selection of the “Document Type” as “T” like T140XXXX using “Reserve Number” at top menu in each page of JGWDoc and fill necessary information.
 * If you make the same (or similar with small modifications) circuits you made before, please upload this request as a new version of the same document number.
 * Then please upload the request form to JGWDoc with schematic/PCB drawings(if possible) and tell AEL chief that you have uploaded a request form with the document number you obtained. Within a week, AEL group will contact you to discuss the detailed design and schedule for the production plan.
 * If you have any questions please contact AEL chief.

Procedure for requesting circuit production

  1. Submit a request form to JGWDoc: by each subgroup to AEL with following 3 items, and contact to AEL chief

    1. Request form: T1402527

    2. Design of schematic diagram: by each subsystem
      • AEL may introduce existing schematic diagrams (EX.LIGO DCC)
    3. Design of PCB digram: by each subsystem or AEL
      • AEL may introduce existing PCB diagrams (EX.LIGO DCC)
  2. Discussions for design and schedule among subgroup and AEL members
    • Design of chassis and front/rear panels: by each subsystem or AEL
    • Final design with some detailed information ex. conectors, gender
    • Schedule
  3. Selection and Order for electronic parts: by AEL
  4. Manufacturing boards: by AEL
  5. Soldering electronic parts: by AEL
  6. Manufacturing chassis: by AEL
  7. Assembling boards, connectors cables and etc. into chassis: by AEL
  8. Inspection: by each subsystem (or AEL)


  • Typically it takes 2 months to fix design and 3 more months for production. Please submit a request form at least five months before the date you want to receive productions.
  • When you submit a request form, please obtain a document number from JGWDoc with selection of the “Document Type” as “T” like T140XXXX using “Reserve Number” at top menu in each page of JGWDoc and fill necessary information.
  • If you make the same (or similar with small modifications) circuits you made before, please upload this request as a new version of the same document number.
  • Then please upload the request form to JGWDoc with schematic/PCB drawings(if possible) and tell AEL chief that you have uploaded a request form with the document number you obtained. Within a week, AEL group will contact you to discuss the detailed design and schedule for the production plan.
  • If you have any questions please contact AEL chief.

KAGRA/Subgroups/AEL/RequestOfProduction (last edited 2015-03-11 11:44:45 by OsamuMiyakawa)