* [[]] | * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6185]] |
Line 6: | Line 6: |
* Passed the TMS-VIS, the BRT, and some parts including geophones to the transportation comapny. | * Handed over the TMS-VIS, the BRT, and some other parts including geophones to a transportation comapny. |
Line 12: | Line 12: |
* Then, somehow connect the cut signal wires of a LVDT. * Check the integirty of the coils (LVDTs and actuators) by testers * Clean the sides of the optics to be installed into the vacuum chamber. (Ethanol+Acetone wiping with vectra alpha, then First Contact.) See [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9015|here]]. |
|
Line 14: | Line 18: |
* | * Tester!! lend from DGS or PEM?? * First contact to clean the side diameter of the optics. |
20180918
Today's activities
Workers: Akutsu, Uraguchi, Yano at Mitaka
- Handed over the TMS-VIS, the BRT, and some other parts including geophones to a transportation comapny.
Next plan
- Accpet those above.
- Bring them to the Xend.
- Wait until one day so that the temperature of them will become equilibrium with the environment in the Xend.
- Then, somehow connect the cut signal wires of a LVDT.
- Check the integirty of the coils (LVDTs and actuators) by testers
Clean the sides of the optics to be installed into the vacuum chamber. (Ethanol+Acetone wiping with vectra alpha, then First Contact.) See here.
Wanted!
- Tester!! lend from DGS or PEM??
- First contact to clean the side diameter of the optics.