 * Handed over the TMS-VIS, the BRT, and some parts including geophones to a transportation comapny.  * Handed over the TMS-VIS, the BRT, and some other parts including geophones to a transportation comapny.

20180918

  • [[]]

Today's activities

Workers: Akutsu, Uraguchi, Yano at Mitaka

  • Handed over the TMS-VIS, the BRT, and some other parts including geophones to a transportation comapny.

Next plan

  • Accpet those above.
  • Bring them to the Xend.
  • Wait until one day so that the temperature of them will become equilibrium with the environment in the Xend.
  • Clean the sides of the optics to be installed into the vacuum chamber. (Ethanol+Acetone wiping with vectra alpha, then First Contact.)

Wanted!

  • First contact to clean the side diameter of the optics.