Differences between revisions 5 and 6
Revision 5 as of 2018-09-18 22:28:03
Size: 602
Comment:
Revision 6 as of 2018-09-18 22:32:59
Size: 771
Comment:
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:
  * Then, somehow connect the cut signal wires of a LVDT.
  * Check the integirty of the coils (LVDTs and actuators) by testers
Line 13: Line 15:
 
Line 15: Line 18:
 * Tester!! lend from DGS or PEM??

20180918

  • [[]]

Today's activities

Workers: Akutsu, Uraguchi, Yano at Mitaka

  • Handed over the TMS-VIS, the BRT, and some other parts including geophones to a transportation comapny.

Next plan

  • Accpet those above.
  • Bring them to the Xend.
  • Wait until one day so that the temperature of them will become equilibrium with the environment in the Xend.
    • Then, somehow connect the cut signal wires of a LVDT.
    • Check the integirty of the coils (LVDTs and actuators) by testers
  • Clean the sides of the optics to be installed into the vacuum chamber. (Ethanol+Acetone wiping with vectra alpha, then First Contact.)

Wanted!

  • Tester!! lend from DGS or PEM??
  • First contact to clean the side diameter of the optics.

KAGRA/Subgroups/AOS/TMSX_O3/2018-09-18 (last edited 2018-09-18 23:38:46 by TomotadaAkutsu)