Size: 602
Comment:
|
Size: 771
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 12: | Line 12: |
* Then, somehow connect the cut signal wires of a LVDT. * Check the integirty of the coils (LVDTs and actuators) by testers |
|
Line 13: | Line 15: |
Line 15: | Line 18: |
* Tester!! lend from DGS or PEM?? |
20180918
- [[]]
Today's activities
Workers: Akutsu, Uraguchi, Yano at Mitaka
- Handed over the TMS-VIS, the BRT, and some other parts including geophones to a transportation comapny.
Next plan
- Accpet those above.
- Bring them to the Xend.
- Wait until one day so that the temperature of them will become equilibrium with the environment in the Xend.
- Then, somehow connect the cut signal wires of a LVDT.
- Check the integirty of the coils (LVDTs and actuators) by testers
- Clean the sides of the optics to be installed into the vacuum chamber. (Ethanol+Acetone wiping with vectra alpha, then First Contact.)
Wanted!
- Tester!! lend from DGS or PEM??
- First contact to clean the side diameter of the optics.