20180918
- [[]]
Today's activities
Workers: Akutsu, Uraguchi, Yano at Mitaka
- Handed over the TMS-VIS, the BRT, and some parts including geophones to a transportation comapny.
Next plan
- Accpet those above.
- Bring them to the Xend.
- Wait until one day so that the temperature of them will become equilibrium with the environment in the Xend.
- Clean the sides of the optics to be installed into the vacuum chamber. (Ethanol+Acetone wiping with vectra alpha, then First Contact.)
Wanted!
- First contact to clean the side diameter of the optics.