⇤ ← Revision 1 as of 2018-09-21 13:36:47
Size: 854
Comment:
|
Size: 905
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6210]] |
20180920
Today's activities
Workers: Akutsu, Uraguchi, Yano at Mitaka
- Handed over the TMS-VIS, the BRT, and some other parts including geophones to a transportation comapny.
Next plan
- Wait until one day so that the temperature of them will become equilibrium with the environment in the Xend.
- Then, somehow connect the cut signal wires of a LVDT.
- Check the integirty of the coils (LVDTs and actuators) by testers
Clean the sides of the optics to be installed into the vacuum chamber. (Ethanol+Acetone wiping with vectra alpha, then First Contact.) See here.
Wanted!
- Tester!! lend from DGS or PEM??
- First contact to clean the side diameter of the optics.