= 20180920 = * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6210]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6217]] |
= 20180921 = * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6250]] |
Line 6: | Line 5: |
Workers: Akutsu, Uraguchi, Yano at Mitaka * Handed over the TMS-VIS, the BRT, and some other parts including geophones to a transportation comapny. |
|
Line 10: | Line 9: |
* Wait until one day so that the temperature of them will become equilibrium with the environment in the Xend. * Then, somehow connect the cut signal wires of a LVDT. * Check the integirty of the coils (LVDTs and actuators) by testers * Clean the sides of the optics to be installed into the vacuum chamber. (Ethanol+Acetone wiping with vectra alpha, then First Contact.) See [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9015|here]]. |
20180921
Today's activities
Next plan
Wanted!
- Tester!! lend from DGS or PEM??
- First contact to clean the side diameter of the optics.