Differences between revisions 2 and 3
Revision 2 as of 2018-09-21 13:42:46
Size: 905
Comment:
Revision 3 as of 2018-09-22 17:03:47
Size: 231
Editor: KojiNagano
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= 20180920 =
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6210]]
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6217]]
= 20180921 =
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6250]]
Line 6: Line 5:
Workers: Akutsu, Uraguchi, Yano at Mitaka
 * Handed over the TMS-VIS, the BRT, and some other parts including geophones to a transportation comapny.

Line 10: Line 9:
 * Wait until one day so that the temperature of them will become equilibrium with the environment in the Xend.
  * Then, somehow connect the cut signal wires of a LVDT.
  * Check the integirty of the coils (LVDTs and actuators) by testers
 * Clean the sides of the optics to be installed into the vacuum chamber. (Ethanol+Acetone wiping with vectra alpha, then First Contact.) See [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9015|here]].
 

20180921

Today's activities

Next plan

Wanted!

  • Tester!! lend from DGS or PEM??
  • First contact to clean the side diameter of the optics.

KAGRA/Subgroups/AOS/TMSX_O3/2018-09-20 (last edited 2018-09-24 21:54:58 by TomotadaAkutsu)