Line 12: Line 12:
 * Wait until one day so that the temperature of them will become equilibrium with the environment in the Xend.
  * Then, somehow connect the cut signal wires of a LVDT.
 * Repairing some damaged parts
  * Connect the cut signal wires of a LVDT.
  * Glue the wire part of an actuator coil about to be loosen.
  * Replace the damages actuator coils.

20180920

Today's activities

Workers: Akutsu, Uraguchi, Yano at Mitaka

  • Handed over the TMS-VIS, the BRT, and some other parts including geophones to a transportation comapny.

Next plan

  • Repairing some damaged parts
    • Connect the cut signal wires of a LVDT.
    • Glue the wire part of an actuator coil about to be loosen.
    • Replace the damages actuator coils.
    • Check the integirty of the coils (LVDTs and actuators) by testers
  • Clean the sides of the optics to be installed into the vacuum chamber. (Ethanol+Acetone wiping with vectra alpha, then First Contact.) See here.

Wanted!

  • Tester!! lend from DGS or PEM??
  • First contact to clean the side diameter of the optics.