Today's activities

  • This morning we unpacked the aluminum foil covering the TMS-VIS
  • This afternoon we checked the TMS-VIS whether it would be injured or not, and seemed safe. After attaching six geophones, so we installed it into the EYT chmaber.

Next Plan

  • Fix the ballast/dummy masses
  • Balancing of TMS-VIS
  • Alignment of GR and IR
  • Observe again the green ghost beam when the cavity locked.