20190606
Today's activities
- This morning we unpacked the aluminum foil covering the TMS-VIS
- This afternoon we checked the TMS-VIS whether it would be injured or not, and seemed safe. After attaching six geophones, so we installed it into the EYT chmaber.
Next Plan
- Fix the ballast/dummy masses
- Balancing of TMS-VIS
- Alignment of GR and IR
- Observe again the green ghost beam when the cavity locked.
Wanted!
- Oscilloscope with LEMO adapters.
- Washed long screws!!