Size: 1850
Comment:
|
Size: 1839
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
= Transmission Monitor (TMS) at EXT (For O3) = | = Transmission Monitor (TMS) at EYT (For O3) = |
Line 8: | Line 8: |
* [http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/AOS/TMSX_O3|Wikipage of TMSX for O3]] | * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/AOS/TMSX_O3|TMSX for O3]] * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/subgroup/AOS/TMSY1|TMSY phase 1]] * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/subgroup/AOS/TMSX1|TMSX phase 1]] * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/subgroup/AOS/TMS-VIS0|TMS-VIS preparation at Mitaka]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8962|TMS in-air part (GPT part) optical layout (Nagano)]] |
Line 15: | Line 19: |
* [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8962|TMS in-air part (GPT part) optical layout (Nagano)]] | |
Line 17: | Line 20: |
* [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/subgroup/AOS/TMSY1|TMSY phase 1]] * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/subgroup/AOS/TMSX1|TMSX phase 1]] * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/subgroup/AOS/TMS-VIS0|TMS-VIS preparation at Mitaka]] |
Transmission Monitor (TMS) at EYT (For O3)
- (To be) with a vibration isolation stage (VIS).
- TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope)
|
|
|
Links to knowledge
- 「図3_EXT,EYTの位置.pptx」
Interferometer Layout for Both IR and Green Beams, With and Without ITMs (Michimura)
Alignment Plan for TRY Optical Table in bKAGRA Phase 1 (Michimura)
- "両角_光学系レイアウト_v4.pdf" (Morozumi)
Task list
Note: some of the tasks can be done in parallel.
- Place/install the TMS-VIS (TMS's vibration isolation stage).
- Place/install the BRT on the TMS-VIS
Signal Assign
Pin Name |
Resistance |
Equipment |
Assign |
Comment1 |
Comment2 |
Connection |