Transmission Monitor (TMS) at EYT (For O3)
- (To be) with a vibration isolation stage (VIS).
- TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope)
KAGRA/Subgroups/AOS/TMSY_O3/2019-02-04 |
---|
20190204 |
KAGRA/Subgroups/AOS/TMSY_O3/2019-02-05 |
---|
20190205 |
|
|
KAGRA/Subgroups/AOS/TMSY_O3/2019-04-12 |
---|
|
KAGRA/Subgroups/AOS/TMSY_O3/2019-04-15 |
---|
|
KAGRA/Subgroups/AOS/TMSY_O3/2019-04-16 |
---|
|
KAGRA/Subgroups/AOS/TMSY_O3/2019-04-17 |
---|
|
KAGRA/Subgroups/AOS/TMSY_O3/2019-04-18 |
---|
|
|
KAGRA/Subgroups/AOS/TMSY_O3/2019-06-03 |
---|
20190603 |
KAGRA/Subgroups/AOS/TMSY_O3/2019-06-04 |
---|
20190604 |
KAGRA/Subgroups/AOS/TMSY_O3/2019-06-05 |
---|
20190605 |
KAGRA/Subgroups/AOS/TMSY_O3/2019-06-06 |
---|
20190606 |
KAGRA/Subgroups/AOS/TMSY_O3/2019-06-10 |
---|
|
|
KAGRA/Subgroups/AOS/TMSY_O3/2019-07-31 |
---|
20190731 |
|
|
Links to knowledge
Task list
Note: some of the tasks can be done in parallel.
- Place/install the TMS-VIS (TMS's vibration isolation stage).
- Place/install the BRT on the TMS-VIS