Differences between revisions 3 and 4
Revision 3 as of 2019-02-04 11:15:39
Size: 1851
Comment:
Revision 4 as of 2019-02-04 11:18:05
Size: 1839
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/AOS/TMSX_O3|Wikipage of TMSX for O3]]  * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/AOS/TMSX_O3|TMSX for O3]]
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/subgroup/AOS/TMSY1|TMSY phase 1]]
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/subgroup/AOS/TMSX1|TMSX phase 1]]
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/subgroup/AOS/TMS-VIS0|TMS-VIS preparation at Mitaka]]
Line 17: Line 20:
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/subgroup/AOS/TMSY1|TMSY phase 1]]
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/subgroup/AOS/TMSX1|TMSX phase 1]]
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/subgroup/AOS/TMS-VIS0|TMS-VIS preparation at Mitaka]]

Transmission Monitor (TMS) at EYT (For O3)

  • (To be) with a vibration isolation stage (VIS).
  • TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope)

<< <  2019 / 2 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28      

<< <  2019 / 3 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31

<< <  2019 / 4 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          

Task list

Note: some of the tasks can be done in parallel.

  • Place/install the TMS-VIS (TMS's vibration isolation stage).
  • Place/install the BRT on the TMS-VIS

Signal Assign

Pin Name

Resistance

Equipment

Assign

Comment1

Comment2

Connection