Differences between revisions 1 and 2
Revision 1 as of 2019-09-04 17:59:20
Size: 721
Editor: YukiInoue
Comment:
Revision 2 as of 2019-09-04 18:26:28
Size: 904
Editor: YukiInoue
Comment:
Deletions are marked like this. Additions are marked like this.
Line 14: Line 14:
  *   * Software part is almost done.
  * Kappa monitoring: Not urgent.
Line 17: Line 18:
  *   * Provide h(t). Inverse AAAI. not include time dependency part.
Line 20: Line 21:
  *   * calgst-hl
Line 23: Line 24:
  *   * Started the measurement.
  * Slide: JPS meeting.

2019/09/04

18:00 JST (Japan) 17:00 CST (Taiwan) 10:00 CET (Geneva)

  • Yuki and Task manager: Schedule
  • Yuki: Line study klog

  • Pang: Result of Pcal stabirity
  • Wu-Cheng: Current status of the offline server


Memo LVC meeting: On going

  • Online
    • Software part is almost done.
    • Kappa monitoring: Not urgent.
  • Low Latency
    • Provide h(t). Inverse AAAI. not include time dependency part.
  • Offline
    • calgst-hl
  • FSM
    • Started the measurement.
    • Slide: JPS meeting.
  • DARM
  • Pcal
    • Disconnect WF at X-end (9/6 afternoon, Yamamoto-san, Ogaki-kun, Thanks!)
    • Line injection will start next week 15.8Hz (9/9-)
    • After that, we will inject the software and actuator lines at 15.9Hz, 15.7Hz
    • We will fix the Y-end system on middle Sep.
  • Gcal

KAGRA/Subgroups/CAL/CAL_Meeting/20190904 (last edited 2019-09-04 18:26:28 by YukiInoue)