2019/10/9
18:30 JST (Japan) 17:30 CST (Taiwan) 10:30 CET (Geneva)
Yuki and Task manager: Schedule slide
- Ogaki: Measurement plan for Master thesis
- Pang : Rotation test
Memo
- Online
- Low Latency
- Offline
- FSM
- DARM
- Injection
- Pcal
- First detection of Pcal line!
Improved the Camera script (http://klog.icrr.u-tokyo.ac.jp/osl/?r=10864)
- WSK was arrived.(Ito-kun will report in next week.)
We will try the WSK calibration(WST<->WSK, WST<->XY-end Pcal) on Oct.22 week.
- Gcal
- Discussed the design of vibration isolation structure