Differences between revisions 1 and 2
Revision 1 as of 2019-10-09 18:22:25
Size: 578
Editor: YukiInoue
Comment:
Revision 2 as of 2019-10-09 18:23:38
Size: 642
Editor: YukiInoue
Comment:
Deletions are marked like this. Additions are marked like this.
Line 26: Line 26:
  * WSK was arrived.
  * We will try the WSK calibration on Oct.22 weeks.
  * WSK was arrived.(Ito-kun will report in next week.)
  * We will try the WSK calibration(WST<->WSK, WST<->XY-end Pcal) on Oct.22 week.

2019/10/9

18:30 JST (Japan) 17:30 CST (Taiwan) 10:30 CET (Geneva)

  • Yuki and Task manager: Schedule slide

  • Ogaki: Measurement plan for Master thesis
  • Pang : Rotation test


Memo

  • Online
  • Low Latency
  • Offline
  • FSM
  • DARM
  • Injection
  • Pcal
  • Gcal

KAGRA/Subgroups/CAL/CAL_Meeting/20191009 (last edited 2019-10-09 18:25:07 by YukiInoue)