⇤ ← Revision 1 as of 2019-10-09 18:22:25
578
Comment:
|
642
|
Deletions are marked like this. | Additions are marked like this. |
Line 26: | Line 26: |
* WSK was arrived. * We will try the WSK calibration on Oct.22 weeks. |
* WSK was arrived.(Ito-kun will report in next week.) * We will try the WSK calibration(WST<->WSK, WST<->XY-end Pcal) on Oct.22 week. |
2019/10/9
18:30 JST (Japan) 17:30 CST (Taiwan) 10:30 CET (Geneva)
Yuki and Task manager: Schedule slide
- Ogaki: Measurement plan for Master thesis
- Pang : Rotation test
Memo
- Online
- Low Latency
- Offline
- FSM
- DARM
- Injection
- Pcal
Improved the Camera script (http://klog.icrr.u-tokyo.ac.jp/osl/?r=10864)
- WSK was arrived.(Ito-kun will report in next week.)
We will try the WSK calibration(WST<->WSK, WST<->XY-end Pcal) on Oct.22 week.
- Gcal