2019/10/9
18:30 JST (Japan) 17:30 CST (Taiwan) 10:30 CET (Geneva)
Yuki and Task manager: Schedule slide
- Ogaki: Measurement plan for Master thesis
- Pang : Rotation test
Memo
- Online
- Low Latency
- Offline
- FSM
- DARM
- Injection
- Pcal
Improved the Camera script (http://klog.icrr.u-tokyo.ac.jp/osl/?r=10864)
- WSK was arrived.
- We will try the WSK calibration on Oct.22 weeks.
- Gcal