2019/10/23
18:30 JST (Japan) 17:30 CST (Taiwan) 10:30 CET (Geneva)
Yuki and Task managers: Schedule slide
- Yuki: Discussion of CAL shift
Memo
- Online
- Low Latency
- Offline
- FSM
- DARM
- Injection
- Pcal
- Gcal
ToDo list
- Instruments:
Camera analysis (a and b vector) -> Yuki
Optical efficiency ->
WSK measurement -> Ito, Yuki
Overplot x_pcal -> Yuki
Verification test(Common rejection etc.) -> Yuki
- DARM model
Filter analysis (Amp, Phase, Coh, and Residual) -> Darkhan, Cory and Pang
Ver.1 Subway map -> Yuki, Y.Takahiro, S.Takahiro, Darkhan
- Online (Site)
Management of filters -> Y.Takahiro
Management of Measured results ->Wataru, Y.Takahiro
FSM -> Wataru
- Error estimation
DARM sigma test in High latency -> Yuki, S.Takahiro
DARM sigma test in Low latency -> Yuki, S.Takahiro
- Low latency
Line demodulation -> S.Takahiro, Darkhan, Y.Takahiro
time dependency correction -> S.Takahiro, Darkhan,
H_pcal(SLM tools) -> S.Takahiro, Darkhan
DARM Sigma (Error estimation) -> Yuki
- High latency
High latency pipeline -> Yuki, Wu-Chang
Long time monitor ->Wu-Chang
Event frame -> Wu-Chang
DARM sigma -> Yuki, T.Sawada
H_pcal(SLM tools) ->
Database -> Wu-Chang, T.Yamamoto, T.Sawada, Y.Inoue
- Injection
Swept sine and sine gauss -> T.Sawada
time delay measurement -> T.Sawada
CBC injection ? -> T.Sawada
- GCal
- Total time measurement (T=?): Pang, Yuki
- Vibration peak(Hz, …): Pang, Yuki
- Vacuum and Temp. test(mbar, C): Pang,Yuki
- Stability of poles(Δx): Pang, Yuki
- Mass distribution test(Δm): Pang, Yuki
- Synchronization test (Δθ,Δω): Pang, Yuki
- Duty
- Line test (Every day; when we lock the IFO with FPMI condition)
- WSK measurement(Every week)
- 10/25
- 10/29
- 11/5
- 11/12
- 11/19
- 11/26
- 12/3
- 12/10
- 12/17