Differences between revisions 2 and 3
Revision 2 as of 2019-10-23 18:27:01
Size: 2065
Editor: YukiInoue
Comment:
Revision 3 as of 2019-10-23 18:27:50
Size: 2045
Editor: YukiInoue
Comment:
Deletions are marked like this. Additions are marked like this.
Line 32: Line 32:
  * Optical efficiency -> Pang   * Optical efficiency ->
Line 49: Line 49:
  * H_pcal(SLM tools) -> Pang, S.Takahiro, Darkhan   * H_pcal(SLM tools) -> S.Takahiro, Darkhan
Line 53: Line 53:
  * Long time monitor -> Pang, Wu-Chang   * Long time monitor ->Wu-Chang
Line 56: Line 56:
  * H_pcal(SLM tools) -> Pang   * H_pcal(SLM tools) ->

2019/10/23

18:30 JST (Japan) 17:30 CST (Taiwan) 10:30 CET (Geneva)

  • Yuki and Task managers: Schedule slide

  • Yuki: Discussion of CAL shift


Memo

  • Online
  • Low Latency
  • Offline
  • FSM
  • DARM
  • Injection
  • Pcal
  • Gcal


ToDo list

  • Instruments:
    • Camera analysis (a and b vector) -> Yuki

    • Optical efficiency ->

    • WSK measurement -> Ito, Yuki

    • Overplot x_pcal -> Yuki

    • Verification test(Common rejection etc.) -> Yuki

  • DARM model
    • Filter analysis (Amp, Phase, Coh, and Residual) -> Darkhan, Cory and Pang

    • Ver.1 Subway map -> Yuki, Y.Takahiro, S.Takahiro, Darkhan

  • Online (Site)
    • Management of filters -> Y.Takahiro

    • Management of Measured results ->Wataru, Y.Takahiro

    • FSM -> Wataru

  • Error estimation
    • DARM sigma test in High latency -> Yuki, S.Takahiro

    • DARM sigma test in Low latency -> Yuki, S.Takahiro

  • Low latency
    • Line demodulation -> S.Takahiro, Darkhan, Y.Takahiro

    • time dependency correction -> S.Takahiro, Darkhan,

    • H_pcal(SLM tools) -> S.Takahiro, Darkhan

    • DARM Sigma (Error estimation) -> Yuki

  • High latency
    • High latency pipeline -> Yuki, Wu-Chang

    • Long time monitor ->Wu-Chang

    • Event frame -> Wu-Chang

    • DARM sigma -> Yuki, T.Sawada

    • H_pcal(SLM tools) ->

    • Database -> Wu-Chang, T.Yamamoto, T.Sawada, Y.Inoue

  • Injection
    • Swept sine and sine gauss -> T.Sawada

    • time delay measurement -> T.Sawada

    • CBC injection ? -> T.Sawada

  • GCal
    • Total time measurement (T=?): Pang, Yuki
    • Vibration peak(Hz, …): Pang, Yuki
    • Vacuum and Temp. test(mbar, C): Pang,Yuki
    • Stability of poles(Δx): Pang, Yuki
    • Mass distribution test(Δm): Pang, Yuki
    • Synchronization test (Δθ,Δω): Pang, Yuki
  • Duty
    • Line test (Every day; when we lock the IFO with FPMI condition)
    • WSK measurement(Every week)

KAGRA/Subgroups/CAL/CAL_Meeting/20191023 (last edited 2019-10-23 18:32:42 by YukiInoue)