CAL meeting 2020 June. 1
- Yuki: Analysis of Duotone injection
- Sawada: Crosscheck of sign with calibration line
- Yuki: C20 server in NCU
- Sawada: Current status of C20 pipeline
- Chen Dan: Picture analysis for beam position monitor
- All: Discussion of JPS meeting
Memo
- Action item for C20
- Analysis of Duotone for stable data (Yuki)
- Analysis of Pcal lines (Sawada)
- Data transfer (Sawada: Ongoing)
- C00-C11-C20 (Sawada)
- Time dependent factor (h(t),h_err,h_ctrl)
- Error estimation
- Action item fot C21
- Beam position (Chen-Dan)
- H_PCAL
- WSK effect
- JPS discussion
- Overview(O3GK summary): Yuki
- Reconstruction: Sawada