Size: 669
Comment:
|
Size: 717
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 10: | Line 10: |
* Action item for C20 * Action item fot C21 |
CAL meeting 2020 June. 1
- Yuki: Analysis of Duotone injection
- Sawada: Crosscheck of sign with calibration line
- Yuki: C20 server in NCU
- Sawada: Current status of C20 pipeline
- Chen Dan: Picture analysis for beam position monitor
- All: Discussion of JPS meeting
Memo
- Action item for C20
- Action item fot C21
- JPS discussion
- Overview(and O3GK summary): Kanda, Tomaru, or Yuki
- Calibration instruments(PCAL) : Chen Dan
- WSK in Toyama : Koki Ito or Ko-Han
- Calibration instruments(GCAL): [Feng-Kai: Academia Sinica research assistant]
- Reconstruction : Y.Takahiro
- Injection test: S.Takahiro
- Error estimation :Yuki