Differences between revisions 2 and 3
Revision 2 as of 2020-06-01 17:18:04
Size: 669
Editor: YukiInoue
Comment:
Revision 3 as of 2020-06-01 17:23:00
Size: 717
Editor: YukiInoue
Comment:
Deletions are marked like this. Additions are marked like this.
Line 10: Line 10:
 * Action item for C20
 * Action item fot C21

CAL meeting 2020 June. 1

  • Yuki: Analysis of Duotone injection
  • Sawada: Crosscheck of sign with calibration line
  • Yuki: C20 server in NCU
  • Sawada: Current status of C20 pipeline
  • Chen Dan: Picture analysis for beam position monitor
  • All: Discussion of JPS meeting


Memo

  • Action item for C20
  • Action item fot C21
  • JPS discussion
    • Overview(and O3GK summary): Kanda, Tomaru, or Yuki
    • Calibration instruments(PCAL) : Chen Dan
    • WSK in Toyama : Koki Ito or Ko-Han
    • Calibration instruments(GCAL): [Feng-Kai: Academia Sinica research assistant]
    • Reconstruction : Y.Takahiro
    • Injection test: S.Takahiro
    • Error estimation :Yuki

KAGRA/Subgroups/CAL/CAL_Meeting/20200601 (last edited 2020-06-01 18:43:16 by YukiInoue)