Size: 717
Comment:
|
← Revision 4 as of 2020-06-01 18:43:16 ⇥
Size: 736
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 11: | Line 11: |
* Analysis of Duotone for stable data (Yuki) * Analysis of Pcal lines (Sawada) * Data transfer (Sawada: Ongoing) * C00-C11-C20 (Sawada) * Time dependent factor (h(t),h_err,h_ctrl) * Error estimation |
|
Line 12: | Line 18: |
* Beam position (Chen-Dan) * H_PCAL * WSK effect |
|
Line 13: | Line 22: |
* Overview(and O3GK summary): Kanda, Tomaru, or Yuki * Calibration instruments(PCAL) : Chen Dan * WSK in Toyama : Koki Ito or Ko-Han * Calibration instruments(GCAL): [Feng-Kai: Academia Sinica research assistant] * Reconstruction : Y.Takahiro * Injection test: S.Takahiro * Error estimation :Yuki |
* Overview(O3GK summary): Yuki * Reconstruction: Sawada |
CAL meeting 2020 June. 1
- Yuki: Analysis of Duotone injection
- Sawada: Crosscheck of sign with calibration line
- Yuki: C20 server in NCU
- Sawada: Current status of C20 pipeline
- Chen Dan: Picture analysis for beam position monitor
- All: Discussion of JPS meeting
Memo
- Action item for C20
- Analysis of Duotone for stable data (Yuki)
- Analysis of Pcal lines (Sawada)
- Data transfer (Sawada: Ongoing)
- C00-C11-C20 (Sawada)
- Time dependent factor (h(t),h_err,h_ctrl)
- Error estimation
- Action item fot C21
- Beam position (Chen-Dan)
- H_PCAL
- WSK effect
- JPS discussion
- Overview(O3GK summary): Yuki
- Reconstruction: Sawada