Line 2: | Line 2: |
Channels used for low-latency and offline calibration (July 12 - ...) ||<tablewidth="786px">'''Channel Name<<BR>>'''||'''Rate<<BR>>'''||'''Format<<BR>>'''||'''Description<<BR>>'''|| ||`K1:CAL-CS_PROC_MICH_RESIDUAL_DBL_DQ` ||16384 ||F64LE ||MICH error || ||`K1:CAL-CS_PROC_MICH_DELTA_CTRL_TM_DBL_DQ` ||4096 ||F64LE ||MICH TM stage control || ||`K1:CAL-CS_PROC_MICH_DELTA_CTRL_IM_DBL_DQ` ||4096 ||F64LE ||MICH IM stage control || ||`K1:CAL-CS_PROC_MICH_DISPLACEMENT_DQ` ||16384 ||F32LE ||MICH displacement (optional) || ||`K1:CAL-CS_PROC_IMC_RESIDUAL_DQ` ||16384 ||F32LE ||IMC error || ||`K1:CAL-CS_PROC_IMC_DELTA_CTRL_AOM_DQ` ||4096 ||F32LE ||IMC AOM frequency control || ||`K1:CAL-CS_PROC_IMC_DELTA_CTRL_TM_DQ` ||4096 ||F32LE ||IMC TM stage control || ||`K1:CAL-CS_PROC_IMC_FREQUENCY_DQ` ||16384 ||F32LE ||Laser frequency (optional) || ||`K1:GRD-LSC_LOCK_OK` ||16 ||F32LE ||LSC Guardian OK status || ||`K1:GRD-LSC_LOCK_STATE_N` ||16 ||F32LE ||LSC lock state || ||`K1:GRD-IO_OK` ||16 ||F32LE ||IMC Guardian OK status || ||`K1:GRD-IO_STATE_N` ||16 ||F32LE ||IMC state || Where F32LE and F64LE means: floating-point 32-bit and 64-bit numbers in Little-Endian format. Channels marked "optional" will not be used in the low-latency and offline computations, `K1:CAL-CS_PROC_MICH_DISPLACEMENT_DQ` and `K1:CAL-CS_PROC_IMC_FREQUENCY_DQ` in particular are the channels calibrated with the online system. ---------------- Low-latency h(t) reconstruction server (Aug - Oct/31: DT,SH,TY,NK,...) * We already have [[KAGRA/Subgroups/CAL/WG/offline/gstlal|three computing nodes]] to test the offline h(t) reconstruction via frame file but we need to install another for the low-latency h(t) reconstruction via shared memory inside the tunnel * (Aug/20-) Connection and software test between a prototype PC and a test bench * Prototype PC is just a standard desktop PC and will be prepared by SH * (Aug-Sep) Procurement of server (2U height, at least two 10G network card, standard CPU,memory and disk) * According to Darkhan’s test with LIGO data and discussion with LIGO people, standard spec should be OK. * DT is working to figure out the spec and model. * Academia Sinica will make the procurement * (Mid.Sep) Connection test between the server and the test bench * We also need the collaboration with DMG people for the data transfer * (Sep-Oct) Connection test between the server and the KAGRA online system * We also need the collaboration with DMG people for the data transfer |
|
Line 4: | Line 45: |
Line 6: | Line 48: |
* Find names and versions of all prerequisite libraries * Install prerequisites and gstlal-cal package on a machine at AS * Test gstlal-cal pipeline on an AS machine * Install prerequisites and gstlal-cal package on a machine at KAGRA [[KAGRA/Subgroups/CAL/WG/offline/gstlal|gstlal installation]] * Test the pipeline on a KAGRA machine [[KAGRA/Subgroups/CAL/WG/offline/tests|gstlal tests]] |
* Find names and versions of all prerequisite libraries * Install prerequisites and gstlal-cal package on a machine at AS * Test gstlal-cal pipeline on an AS machine * Install prerequisites and gstlal-cal package on a machine at KAGRA * Test the pipeline on a KAGRA machine Progress so far (June 21): * Ask LIGO CAL team for the detailed information of gstlal-calibration * '''(ongoing) gstlal-calibration maintainers in LIGO are helping to resolve some installation and testing issues.''' * Find names and versions of all prerequisite libraries, * '''(done, entry from June 7)''' SH made progress on this, see [[KAGRA/Subgroups/CAL/WG/offline/gstlal|gstlal installation]] * Install required packages and the gstlal-cal package on a machine at AS * '''DT has written scripts for installing lalsuite and gstlal software on a clean CentOS7 distro based on SH's instructions.''' Scripts were uploaded to KAGRA-AS group's Gitlab repositories: . [[https://gitlab.com/kagra-as/docker-lalsuite-cold|containerized "cold" version of lalsuite]] [[https://gitlab.com/kagra-as/docker-gstlal-cold|containerized "cold" version of gstlal-calibration]] * '''CI pipelines that build docker-lalsuite-cold and docker-gstlal-cold containers were set up to run on AS IoP machine.''' * Test gstlal-cal pipeline on an AS machine * '''As a prerequisite to this task, DT reproduced a portion of LIGO h(t) from raw data with gstlal-calibration-v1.1.8 (w/ a "docker-gstlal-cold" image).''' This test was done on a private server (2-cores on Intel Xeon 2.4GHz, 8GB RAM). * '''Downloaded a few hours of bKAGRA Phase-1 data on AS machine.''' * '''(doing) Will try to reproduce C00 with gstlal-calibration.''' Details in . [[https://gitlab.com/kagra-as/low-latency-cal/test-gstlal-on-cal-iop|gstlal-calibration testing on AS machine (cal-iop)]] * '''(to do) Verify the output of gstlal-calibration.''' * Install prerequisites and gstlal-cal package on a machine at KAGRA * '''(done, entry from June 7)''' SH made progress on this, see [[KAGRA/Subgroups/CAL/WG/offline/gstlal|gstlal installation]]. * Test the pipeline on a KAGRA machine [[KAGRA/Subgroups/CAL/WG/offline/tests|gstlal tests]] * '''to do''' * Documentation * '''(doing) Started documenting the work in KAGRA-AS group's Gitlab repositories:''' . [[https://gitlab.com/kagra-as/docker-lalsuite-cold|containerized "cold" version of lalsuite]] [[https://gitlab.com/kagra-as/docker-gstlal-cold|containerized "cold" version of gstlal-calibration]] [[https://gitlab.com/kagra-as/low-latency-cal/test-gstlal-on-cal-iop|gstlal-calibration testing on AS machine (cal-iop)]] |
Line 13: | Line 79: |
* Ask LIGO CAL team for the detailed information of gstlal-calibration * '''Communication with people working on LIGO gstlal has been initiated.''' * Find names and versions of all prerequisite libraries, * '''SK made progress on this, see [[KAGRA/Subgroups/CAL/WG/offline/gstlal|gstlal installation]]''' * Install prerequisites and gstlal-cal package on a machine at AS * '''As a prerequisite to this task, SK worked on installation process for CentOS, DT for Debian.''' * '''The goal is to have a better understanding of what is happening under the hood when the gstlal-calibration package is compiled.''' * Test gstlal-cal pipeline on an AS machine * '''As a prerequisite to this task, DT is currently trying to reproduce LIGO h(t) from raw data.''' * '''A sub-goal of this task is to come up with a gstlal code testing procedure.''' * '''DT addressed some questions to LIGO gstlal people.''' * Install prerequisites and gstlal-cal package on a machine at KAGRA * '''SK made progress on this, see [[KAGRA/Subgroups/CAL/WG/offline/gstlal|gstlal installation]]''' * Test the pipeline on a KAGRA machine [[KAGRA/Subgroups/CAL/WG/offline/tests|gstlal tests]] * '''to do''' |
* Ask LIGO CAL team for the detailed information of gstlal-calibration * '''Communication with people working on LIGO gstlal has been initiated.''' * Find names and versions of all prerequisite libraries, * '''SH made progress on this, see [[KAGRA/Subgroups/CAL/WG/offline/gstlal|gstlal installation]]''' * Install prerequisites and gstlal-cal package on a machine at AS * '''As a prerequisite to this task, SH worked on installation process for CentOS, DT for Debian.''' * '''The goal is to have a better understanding of what is happening under the hood when the gstlal-calibration package is compiled.''' * Test gstlal-cal pipeline on an AS machine * '''As a prerequisite to this task, DT is currently trying to reproduce LIGO h(t) from raw data.''' * '''A sub-goal of this task is to come up with a gstlal code testing procedure.''' * '''DT addressed some questions to LIGO gstlal people.''' * Install prerequisites and gstlal-cal package on a machine at KAGRA * '''SH made progress on this, see [[KAGRA/Subgroups/CAL/WG/offline/gstlal|gstlal installation]]''' * Test the pipeline on a KAGRA machine [[KAGRA/Subgroups/CAL/WG/offline/tests|gstlal tests]] * '''to do''' |
Line 30: | Line 97: |
* Put more effort on documentation. | * Put more effort on documentation. |
Low-latency and offline
Channels used for low-latency and offline calibration (July 12 - ...)
Channel Name |
Rate |
Format |
Description |
K1:CAL-CS_PROC_MICH_RESIDUAL_DBL_DQ |
16384 |
F64LE |
MICH error |
K1:CAL-CS_PROC_MICH_DELTA_CTRL_TM_DBL_DQ |
4096 |
F64LE |
MICH TM stage control |
K1:CAL-CS_PROC_MICH_DELTA_CTRL_IM_DBL_DQ |
4096 |
F64LE |
MICH IM stage control |
K1:CAL-CS_PROC_MICH_DISPLACEMENT_DQ |
16384 |
F32LE |
MICH displacement (optional) |
K1:CAL-CS_PROC_IMC_RESIDUAL_DQ |
16384 |
F32LE |
IMC error |
K1:CAL-CS_PROC_IMC_DELTA_CTRL_AOM_DQ |
4096 |
F32LE |
IMC AOM frequency control |
K1:CAL-CS_PROC_IMC_DELTA_CTRL_TM_DQ |
4096 |
F32LE |
IMC TM stage control |
K1:CAL-CS_PROC_IMC_FREQUENCY_DQ |
16384 |
F32LE |
Laser frequency (optional) |
K1:GRD-LSC_LOCK_OK |
16 |
F32LE |
LSC Guardian OK status |
K1:GRD-LSC_LOCK_STATE_N |
16 |
F32LE |
LSC lock state |
K1:GRD-IO_OK |
16 |
F32LE |
IMC Guardian OK status |
K1:GRD-IO_STATE_N |
16 |
F32LE |
IMC state |
Where F32LE and F64LE means: floating-point 32-bit and 64-bit numbers in Little-Endian format.
Channels marked "optional" will not be used in the low-latency and offline computations, K1:CAL-CS_PROC_MICH_DISPLACEMENT_DQ and K1:CAL-CS_PROC_IMC_FREQUENCY_DQ in particular are the channels calibrated with the online system.
Low-latency h(t) reconstruction server (Aug - Oct/31: DT,SH,TY,NK,...)
We already have three computing nodes to test the offline h(t) reconstruction via frame file but we need to install another for the low-latency h(t) reconstruction via shared memory inside the tunnel
- (Aug/20-) Connection and software test between a prototype PC and a test bench
- Prototype PC is just a standard desktop PC and will be prepared by SH
- (Aug-Sep) Procurement of server (2U height, at least two 10G network card, standard CPU,memory and disk)
- According to Darkhan’s test with LIGO data and discussion with LIGO people, standard spec should be OK.
- DT is working to figure out the spec and model.
- Academia Sinica will make the procurement
- (Mid.Sep) Connection test between the server and the test bench
- We also need the collaboration with DMG people for the data transfer
- (Sep-Oct) Connection test between the server and the KAGRA online system
- We also need the collaboration with DMG people for the data transfer
Current tasks (May 26 - July 15):
Ask to LIGO CAL team for the detailed information of gstlal-calibration (DT) [status: ongoing | expected finish: N/A]
Make gstlal-calibration running on a machine at KAGRA (DT, SH) [status: ongoing | expected finish: Jul 15]
- Find names and versions of all prerequisite libraries
- Install prerequisites and gstlal-cal package on a machine at AS
- Test gstlal-cal pipeline on an AS machine
- Install prerequisites and gstlal-cal package on a machine at KAGRA
- Test the pipeline on a KAGRA machine
Progress so far (June 21):
- Ask LIGO CAL team for the detailed information of gstlal-calibration
(ongoing) gstlal-calibration maintainers in LIGO are helping to resolve some installation and testing issues.
- Find names and versions of all prerequisite libraries,
(done, entry from June 7) SH made progress on this, see gstlal installation
- Install required packages and the gstlal-cal package on a machine at AS
DT has written scripts for installing lalsuite and gstlal software on a clean CentOS7 distro based on SH's instructions. Scripts were uploaded to KAGRA-AS group's Gitlab repositories:
CI pipelines that build docker-lalsuite-cold and docker-gstlal-cold containers were set up to run on AS IoP machine.
- Test gstlal-cal pipeline on an AS machine
As a prerequisite to this task, DT reproduced a portion of LIGO h(t) from raw data with gstlal-calibration-v1.1.8 (w/ a "docker-gstlal-cold" image). This test was done on a private server (2-cores on Intel Xeon 2.4GHz, 8GB RAM).
Downloaded a few hours of bKAGRA Phase-1 data on AS machine.
(doing) Will try to reproduce C00 with gstlal-calibration. Details in
(to do) Verify the output of gstlal-calibration.
- Install prerequisites and gstlal-cal package on a machine at KAGRA
(done, entry from June 7) SH made progress on this, see gstlal installation.
Test the pipeline on a KAGRA machine gstlal tests
to do
- Documentation
(doing) Started documenting the work in KAGRA-AS group's Gitlab repositories:
Progress so far (June 7):
- Ask LIGO CAL team for the detailed information of gstlal-calibration
Communication with people working on LIGO gstlal has been initiated.
- Find names and versions of all prerequisite libraries,
SH made progress on this, see gstlal installation
- Install prerequisites and gstlal-cal package on a machine at AS
As a prerequisite to this task, SH worked on installation process for CentOS, DT for Debian.
The goal is to have a better understanding of what is happening under the hood when the gstlal-calibration package is compiled.
- Test gstlal-cal pipeline on an AS machine
As a prerequisite to this task, DT is currently trying to reproduce LIGO h(t) from raw data.
A sub-goal of this task is to come up with a gstlal code testing procedure.
DT addressed some questions to LIGO gstlal people.
- Install prerequisites and gstlal-cal package on a machine at KAGRA
SH made progress on this, see gstlal installation
Test the pipeline on a KAGRA machine gstlal tests
to do
New tasks:
- Put more effort on documentation.