Differences between revisions 1 and 12 (spanning 11 versions)
Revision 1 as of 2018-06-05 20:01:55
Size: 202
Editor: YukiInoue
Comment:
Revision 12 as of 2018-06-12 13:05:41
Size: 1547
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
== KEK ==
-Takayuki Tomaru
-Chihiro Kozakai
= Shift =
Line 5: Line 3:
== ICRR ==
-Takaaki Yokozawa
-Takahiro Yamamoto
Line 9: Line 4:
== OCU ==
-Nobuyuki Kanda
-
-
== Task list ==
Line 14: Line 6:
== ASIoP ==
-Sadakazu Haino
-Yuki Inoue
-Darkhan Tuyenbayev
=== Kamioka shift ==
 * connectiong of EYA PC to CDS (2days)
 * connectiong of EXA PC to CDS (2days)
 * connectiong of IYA PC to CDS (2days)(IYA camera is not related cal work? T.Yo)
 * connectiong of IXA PC to CDS (2days)(IXA camera is not related cal work? T.Yo)
 * IXA camera install(1 week)(IXA camera is not related cal work? T.Yo)
 * Preparing the CAL-Git server (2days)
 * EX Pcal shipping(1week)
 * EXA AA/AI install (1day)
 * EYA de-whitening install (1day)
 * EXA Cabling (3days)
 * EXA Tx alignment(3days)
 * EXA Periscope alignment(3days)
 * EXA Rx alignment(1days)
 * Replacing the 2inch lenses on EYA (2days)(??? T.Yo)
 * NAB EXA (1 week)(may change to 2-3day. T.Yo)
 * NAB EYA (1 week)(may change to 2-3day. T.Yo)
 * NAB IYA (1 week)(IYA issue is not related cal work? T.Yo)
 * WSK calibration(Every month)
 * Camera tuning EYA (2days)
 * Camera tuning EXA (2days)
 * Camera tuning IYA (2days)(IYA camera is not related cal work? T.Yo)
 * Camera tuning IXA (2days)(IXA camera is not related cal work? T.Yo)

=== KEK ===
Member:(Tomaru), Kozakai,Bin-Hua

=== OCU ===
Member: (Kanda),Sawada,Tsuchida

=== ICRR ===
Mamber: Yamamoto,Yokozawa
 * --( NAB IXA (1 week)->Takaaki (+Akutsu-san): On going (2018/6/11-15) )-- (IXA work is not related to CAL tasks)
=== Taiwan ===

==== Academia Sinica ====
Member: (Haino), Cory, Darkhan

==== NCU ====
Member: Inoue, Bill
 * Alignment of Y-end Pcal with vaccuming (2days) -> Yuki, (+Kimura-san):Not yet (2018/6/14-15)

Shift

Task list

=== Kamioka shift ==

  • connectiong of EYA PC to CDS (2days)
  • connectiong of EXA PC to CDS (2days)
  • connectiong of IYA PC to CDS (2days)(IYA camera is not related cal work? T.Yo)
  • connectiong of IXA PC to CDS (2days)(IXA camera is not related cal work? T.Yo)
  • IXA camera install(1 week)(IXA camera is not related cal work? T.Yo)
  • Preparing the CAL-Git server (2days)
  • EX Pcal shipping(1week)
  • EXA AA/AI install (1day)
  • EYA de-whitening install (1day)
  • EXA Cabling (3days)
  • EXA Tx alignment(3days)
  • EXA Periscope alignment(3days)
  • EXA Rx alignment(1days)
  • Replacing the 2inch lenses on EYA (2days)(??? T.Yo)
  • NAB EXA (1 week)(may change to 2-3day. T.Yo)
  • NAB EYA (1 week)(may change to 2-3day. T.Yo)
  • NAB IYA (1 week)(IYA issue is not related cal work? T.Yo)
  • WSK calibration(Every month)
  • Camera tuning EYA (2days)
  • Camera tuning EXA (2days)
  • Camera tuning IYA (2days)(IYA camera is not related cal work? T.Yo)
  • Camera tuning IXA (2days)(IXA camera is not related cal work? T.Yo)

KEK

Member:(Tomaru), Kozakai,Bin-Hua

OCU

Member: (Kanda),Sawada,Tsuchida

ICRR

Mamber: Yamamoto,Yokozawa

  • NAB IXA (1 week)->Takaaki (+Akutsu-san): On going (2018/6/11-15) (IXA work is not related to CAL tasks)

Taiwan

Academia Sinica

Member: (Haino), Cory, Darkhan

NCU

Member: Inoue, Bill

  • Alignment of Y-end Pcal with vaccuming (2days) -> Yuki, (+Kimura-san):Not yet (2018/6/14-15)

KAGRA/Subgroups/CAL/Shift (last edited 2019-05-01 15:06:59 by husan-yu.chu)