== Task list == * connectiong of EYA PC to CDS (2days) * connectiong of EXA PC to CDS (2days) * connectiong of IYA PC to CDS (2days) * connectiong of IXA PC to CDS (2days) * IXA camera install(1 week) * Preparing the CAL-Git server (2days) * EXA AA/AI install (1day) * EYA de-whitening install (1day) * EXA Cabling (3days) * EXA Tx alignment(3days) * EXA Periscope alignment(3days) * EXA Rx alignment(1days) * Replacing the 2inch lenses on EYA (2days) * NAB EXA (1 week) * NAB EYA (1 week) * NAB IYA (1 week) * WSK calibration(Every month) |
Line 9: | Line 22: |
== OCU == -Nobuyuki Kanda - - |
=== KEK === |
Line 14: | Line 24: |
== ASIoP == -Sadakazu Haino -Yuki Inoue -Darkhan Tuyenbayev |
=== OCU === === ICRR === * NAB IXA (1 week)->Yokozawa: On going === Taiwan === ==== Academia Sinica ==== ==== NCU ==== |
Shift
Task list
- connectiong of EYA PC to CDS (2days)
- connectiong of EXA PC to CDS (2days)
- connectiong of IYA PC to CDS (2days)
- connectiong of IXA PC to CDS (2days)
- IXA camera install(1 week)
- Preparing the CAL-Git server (2days)
- EXA AA/AI install (1day)
- EYA de-whitening install (1day)
- EXA Cabling (3days)
- EXA Tx alignment(3days)
- EXA Periscope alignment(3days)
- EXA Rx alignment(1days)
- Replacing the 2inch lenses on EYA (2days)
- NAB EXA (1 week)
- NAB EYA (1 week)
- NAB IYA (1 week)
- WSK calibration(Every month)
KEK
OCU
ICRR
NAB IXA (1 week)->Yokozawa: On going
Taiwan
Academia Sinica