Differences between revisions 1 and 5 (spanning 4 versions)
Revision 1 as of 2018-06-05 20:01:55
Size: 202
Editor: YukiInoue
Comment:
Revision 5 as of 2018-06-11 21:59:34
Size: 825
Editor: YukiInoue
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
== KEK ==
-Takayuki Tomaru
-Chihiro Kozakai
= Shift =
Line 5: Line 3:
== ICRR ==
-Takaaki Yokozawa
-Takahiro Yamamoto
== Task list ==
 * connectiong of EYA PC to CDS (2days)
 * connectiong of EXA PC to CDS (2days)
 * connectiong of IYA PC to CDS (2days)
 * connectiong of IXA PC to CDS (2days)
 * IXA camera install(1 week)
 * Preparing the CAL-Git server (2days)
 * EXA AA/AI install (1day)
 * EYA de-whitening install (1day)
 * EXA Cabling (3days)
 * EXA Tx alignment(3days)
 * EXA Periscope alignment(3days)
 * EXA Rx alignment(1days)
 * Replacing the 2inch lenses on EYA (2days)
 * NAB EXA (1 week)
 * NAB EYA (1 week)
 * NAB IYA (1 week)
 * WSK calibration(Every month)
Line 9: Line 22:
== OCU ==
-Nobuyuki Kanda
-
-
=== KEK ===
Line 14: Line 24:
== ASIoP ==
-Sadakazu Haino
-Yuki Inoue
-Darkhan Tuyenbayev
=== OCU ===

=== ICRR ===
 * NAB IXA (1 week)->Takaaki: On going (2018/6/11-15)
=== Taiwan ===

==== Academia Sinica ====

==== NCU ====
 * Alignment of Y-end Pcal with vaccuming (2days) -> Yuki (2018/6/14-15)

Shift

Task list

  • connectiong of EYA PC to CDS (2days)
  • connectiong of EXA PC to CDS (2days)
  • connectiong of IYA PC to CDS (2days)
  • connectiong of IXA PC to CDS (2days)
  • IXA camera install(1 week)
  • Preparing the CAL-Git server (2days)
  • EXA AA/AI install (1day)
  • EYA de-whitening install (1day)
  • EXA Cabling (3days)
  • EXA Tx alignment(3days)
  • EXA Periscope alignment(3days)
  • EXA Rx alignment(1days)
  • Replacing the 2inch lenses on EYA (2days)
  • NAB EXA (1 week)
  • NAB EYA (1 week)
  • NAB IYA (1 week)
  • WSK calibration(Every month)

KEK

OCU

ICRR

  • NAB IXA (1 week)->Takaaki: On going (2018/6/11-15)

Taiwan

Academia Sinica

NCU

  • Alignment of Y-end Pcal with vaccuming (2days) -> Yuki (2018/6/14-15)

KAGRA/Subgroups/CAL/Shift (last edited 2019-05-01 15:06:59 by husan-yu.chu)