== Task list ==

=== Kamioka shift ===
 * connectiong of EYA PC to CDS (2days)
 * connectiong of EXA PC to CDS (2days)
 * connectiong of IYA PC to CDS (2days)(IYA camera is not related cal work? T.Yo)
 * connectiong of IXA PC to CDS (2days)(IXA camera is not related cal work? T.Yo)
 * IXA camera install(1 week)(IXA camera is not related cal work? T.Yo)
 * Preparing the CAL-Git server (2days)
 * EX Pcal shipping(1week)
 * EXA AA/AI install (1day)
 * EYA de-whitening install (1day)
 * EXA Cabling (3days)
 * EXA Tx alignment(3days)
 * EXA Periscope alignment(3days)
 * EXA Rx alignment(1days)
 * Replacing the 2inch lenses on EYA (2days)(??? T.Yo)
 * NAB EXA (1 week)(may change to 2-3day. T.Yo)
 * NAB EYA (1 week)(may change to 2-3day. T.Yo)
 * NAB IYA (1 week)(IYA issue is not related cal work? T.Yo)
 * WSK calibration(Every month)
 * Camera tuning EYA (2days)
 * Camera tuning EXA (2days)
 * Camera tuning IYA (2days)(IYA camera is not related cal work? T.Yo)
 * Camera tuning IXA (2days)(IXA camera is not related cal work? T.Yo)
 
=== KEK ===
Member:(Tomaru), Kozakai,Bin-Hua

=== OCU ===
Member: (Kanda),Sawada,Tsuchida

=== ICRR ===
Member: Yamamoto,Yokozawa
 * --( NAB IXA (1 week)->Takaaki (+Akutsu-san): On going (2018/6/11-15) )-- (IXA work is not related to CAL tasks)
=== Taiwan ===

==== Academia Sinica ====
Member: (Haino), Cory, Darkhan

==== NCU ====
Member: Inoue, Bill, Pang
 

Shift

Task list

Kamioka shift

  • connectiong of EYA PC to CDS (2days)
  • connectiong of EXA PC to CDS (2days)
  • connectiong of IYA PC to CDS (2days)(IYA camera is not related cal work? T.Yo)
  • connectiong of IXA PC to CDS (2days)(IXA camera is not related cal work? T.Yo)
  • IXA camera install(1 week)(IXA camera is not related cal work? T.Yo)
  • Preparing the CAL-Git server (2days)
  • EX Pcal shipping(1week)
  • EXA AA/AI install (1day)
  • EYA de-whitening install (1day)
  • EXA Cabling (3days)
  • EXA Tx alignment(3days)
  • EXA Periscope alignment(3days)
  • EXA Rx alignment(1days)
  • Replacing the 2inch lenses on EYA (2days)(??? T.Yo)
  • NAB EXA (1 week)(may change to 2-3day. T.Yo)
  • NAB EYA (1 week)(may change to 2-3day. T.Yo)
  • NAB IYA (1 week)(IYA issue is not related cal work? T.Yo)
  • WSK calibration(Every month)
  • Camera tuning EYA (2days)
  • Camera tuning EXA (2days)
  • Camera tuning IYA (2days)(IYA camera is not related cal work? T.Yo)
  • Camera tuning IXA (2days)(IXA camera is not related cal work? T.Yo)

KEK

Member:(Tomaru), Kozakai,Bin-Hua

OCU

Member: (Kanda),Sawada,Tsuchida

ICRR

Member: Yamamoto,Yokozawa

  • NAB IXA (1 week)->Takaaki (+Akutsu-san): On going (2018/6/11-15) (IXA work is not related to CAL tasks)