== KEK == == Task list ==
 * connectiong of EYA PC to CDS (2days)
 * connectiong of EXA PC to CDS (2days)
 * connectiong of IYA PC to CDS (2days)
 * connectiong of IXA PC to CDS (2days)
 * IXA camera install(1 week)
 * Preparing the CAL-Git server (2days)
 * EXA AA/AI install (1day)
 * EYA de-whitening install (1day)
 * EXA Cabling (3days)
 * EXA Tx alignment(3days)
 * EXA Periscope alignment(3days)
 * EXA Rx alignment(1days)
 * Replacing the 2inch lenses on EYA (2days)
 * NAB EXA (1 week)
 * NAB EYA (1 week)
 * NAB IYA (1 week)
 * WSK calibration(Every month)
Line 5: Line 22:
== OCU == === KEK ===
Line 7: Line 24:
== ICRR == === OCU ===
Line 9: Line 26:
== Taiwan == === ICRR ===
 * NAB IXA (1 week)->Yokozawa: On going
=== Taiwan ===
Line 11: Line 30:
=== Academia Sinica === ==== Academia Sinica ====
Line 13: Line 32:
=== NCU === ==== NCU ====

Shift

Task list

  • connectiong of EYA PC to CDS (2days)
  • connectiong of EXA PC to CDS (2days)
  • connectiong of IYA PC to CDS (2days)
  • connectiong of IXA PC to CDS (2days)
  • IXA camera install(1 week)
  • Preparing the CAL-Git server (2days)
  • EXA AA/AI install (1day)
  • EYA de-whitening install (1day)
  • EXA Cabling (3days)
  • EXA Tx alignment(3days)
  • EXA Periscope alignment(3days)
  • EXA Rx alignment(1days)
  • Replacing the 2inch lenses on EYA (2days)
  • NAB EXA (1 week)
  • NAB EYA (1 week)
  • NAB IYA (1 week)
  • WSK calibration(Every month)

KEK

OCU

ICRR

  • NAB IXA (1 week)->Yokozawa: On going