Differences between revisions 4 and 18 (spanning 14 versions)
Revision 4 as of 2018-06-11 21:57:40
Size: 737
Editor: YukiInoue
Comment:
Revision 18 as of 2019-05-01 15:06:59
Size: 1544
Editor: husan-yu.chu
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
 * https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8405
Line 4: Line 6:

=== Kamioka shift ===
Line 6: Line 10:
 * connectiong of IYA PC to CDS (2days)
 * connectiong of IXA PC to CDS (2days)
 * IXA camera install(1 week)
 * connectiong of IYA PC to CDS (2days)(IYA camera is not related cal work? T.Yo)
 * connectiong of IXA PC to CDS (2days)(IXA camera is not related cal work? T.Yo)
 * IXA camera install(1 week)(IXA camera is not related cal work? T.Yo)
Line 10: Line 14:
 * EX Pcal shipping(1week)
Line 16: Line 21:
 * Replacing the 2inch lenses on EYA (2days)
 * NAB EXA (1 week)
 * NAB EYA (1 week)
 * NAB IYA (1 week)
 * Replacing the 2inch lenses on EYA (2days)(??? T.Yo)
 * NAB EXA (1 week)(may change to 2-3day. T.Yo)
 * NAB EYA (1 week)(may change to 2-3day. T.Yo)
 * NAB IYA (1 week)(IYA issue is not related cal work? T.Yo)
Line 21: Line 26:
 * Camera tuning EYA (2days)
 * Camera tuning EXA (2days)
 * Camera tuning IYA (2days)(IYA camera is not related cal work? T.Yo)
 * Camera tuning IXA (2days)(IXA camera is not related cal work? T.Yo)
 
Line 23: Line 32:
Member:(Tomaru), Kozakai,Bin-Hua
Line 25: Line 35:
Member: (Kanda),Sawada,Tsuchida
Line 27: Line 38:
 * NAB IXA (1 week)->Yokozawa: On going Member: Yamamoto,Yokozawa
 * --( NAB IXA (1 week)->Takaaki (+Akutsu-san): On going (2018/6/11-15) )-- (IXA work is not related to CAL tasks)
Line 31: Line 43:
Member: (Haino), Cory, Darkhan
Line 33: Line 46:
Member: Inoue, Bill, Pang
 

Shift

Task list

Kamioka shift

  • connectiong of EYA PC to CDS (2days)
  • connectiong of EXA PC to CDS (2days)
  • connectiong of IYA PC to CDS (2days)(IYA camera is not related cal work? T.Yo)
  • connectiong of IXA PC to CDS (2days)(IXA camera is not related cal work? T.Yo)
  • IXA camera install(1 week)(IXA camera is not related cal work? T.Yo)
  • Preparing the CAL-Git server (2days)
  • EX Pcal shipping(1week)
  • EXA AA/AI install (1day)
  • EYA de-whitening install (1day)
  • EXA Cabling (3days)
  • EXA Tx alignment(3days)
  • EXA Periscope alignment(3days)
  • EXA Rx alignment(1days)
  • Replacing the 2inch lenses on EYA (2days)(??? T.Yo)
  • NAB EXA (1 week)(may change to 2-3day. T.Yo)
  • NAB EYA (1 week)(may change to 2-3day. T.Yo)
  • NAB IYA (1 week)(IYA issue is not related cal work? T.Yo)
  • WSK calibration(Every month)
  • Camera tuning EYA (2days)
  • Camera tuning EXA (2days)
  • Camera tuning IYA (2days)(IYA camera is not related cal work? T.Yo)
  • Camera tuning IXA (2days)(IXA camera is not related cal work? T.Yo)

KEK

Member:(Tomaru), Kozakai,Bin-Hua

OCU

Member: (Kanda),Sawada,Tsuchida

ICRR

Member: Yamamoto,Yokozawa

  • NAB IXA (1 week)->Takaaki (+Akutsu-san): On going (2018/6/11-15) (IXA work is not related to CAL tasks)

Taiwan

Academia Sinica

Member: (Haino), Cory, Darkhan

NCU

Member: Inoue, Bill, Pang