Size: 825
Comment:
|
Size: 1115
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
Line 21: | Line 22: |
* Camera tuning EYA (2days) * Camera tuning EXA (2days) * Camera tuning IYA (2days) * Camera tuning IXA (2days) |
|
Line 23: | Line 28: |
Member:(Tomaru), Kozakai | |
Line 25: | Line 31: |
Member: (Kanda),Sawada,Tsuchida | |
Line 27: | Line 34: |
* NAB IXA (1 week)->Takaaki: On going (2018/6/11-15) | Mamber: Yamamoto,Yokozawa * NAB IXA (1 week)->Takaaki (+Akutsu-san): On going (2018/6/11-15) |
Line 31: | Line 39: |
Member: (Haino), Cory, Darkhan | |
Line 33: | Line 42: |
* Alignment of Y-end Pcal with vaccuming (2days) -> Yuki (2018/6/14-15) | Member: Inoue, Bill * Alignment of Y-end Pcal with vaccuming (2days) -> Yuki, (+Kimura-san) (2018/6/14-15) |
Shift
Task list
- connectiong of EYA PC to CDS (2days)
- connectiong of EXA PC to CDS (2days)
- connectiong of IYA PC to CDS (2days)
- connectiong of IXA PC to CDS (2days)
- IXA camera install(1 week)
- Preparing the CAL-Git server (2days)
- EXA AA/AI install (1day)
- EYA de-whitening install (1day)
- EXA Cabling (3days)
- EXA Tx alignment(3days)
- EXA Periscope alignment(3days)
- EXA Rx alignment(1days)
- Replacing the 2inch lenses on EYA (2days)
- NAB EXA (1 week)
- NAB EYA (1 week)
- NAB IYA (1 week)
- WSK calibration(Every month)
- Camera tuning EYA (2days)
- Camera tuning EXA (2days)
- Camera tuning IYA (2days)
- Camera tuning IXA (2days)
KEK
Member:(Tomaru), Kozakai
OCU
Member: (Kanda),Sawada,Tsuchida
ICRR
Mamber: Yamamoto,Yokozawa
NAB IXA (1 week)->Takaaki (+Akutsu-san): On going (2018/6/11-15)
Taiwan
Academia Sinica
Member: (Haino), Cory, Darkhan
NCU
Member: Inoue, Bill
Alignment of Y-end Pcal with vaccuming (2days) -> Yuki, (+Kimura-san) (2018/6/14-15)