Differences between revisions 7 and 8
Revision 7 as of 2018-06-11 22:04:07
Size: 976
Editor: YukiInoue
Comment:
Revision 8 as of 2018-06-11 22:10:01
Size: 1115
Editor: YukiInoue
Comment:
Deletions are marked like this. Additions are marked like this.
Line 28: Line 28:
Member:(Tomaru), Kozakai
Line 30: Line 31:
Member: (Kanda),Sawada,Tsuchida
Line 32: Line 34:
Mamber: Yamamoto,Yokozawa
Line 36: Line 39:
Member: (Haino), Cory, Darkhan
Line 38: Line 42:
Member: Inoue, Bill

Shift

Task list

  • connectiong of EYA PC to CDS (2days)
  • connectiong of EXA PC to CDS (2days)
  • connectiong of IYA PC to CDS (2days)
  • connectiong of IXA PC to CDS (2days)
  • IXA camera install(1 week)
  • Preparing the CAL-Git server (2days)
  • EXA AA/AI install (1day)
  • EYA de-whitening install (1day)
  • EXA Cabling (3days)
  • EXA Tx alignment(3days)
  • EXA Periscope alignment(3days)
  • EXA Rx alignment(1days)
  • Replacing the 2inch lenses on EYA (2days)
  • NAB EXA (1 week)
  • NAB EYA (1 week)
  • NAB IYA (1 week)
  • WSK calibration(Every month)
  • Camera tuning EYA (2days)
  • Camera tuning EXA (2days)
  • Camera tuning IYA (2days)
  • Camera tuning IXA (2days)

KEK

Member:(Tomaru), Kozakai

OCU

Member: (Kanda),Sawada,Tsuchida

ICRR

Mamber: Yamamoto,Yokozawa

  • NAB IXA (1 week)->Takaaki (+Akutsu-san): On going (2018/6/11-15)

Taiwan

Academia Sinica

Member: (Haino), Cory, Darkhan

NCU

Member: Inoue, Bill

  • Alignment of Y-end Pcal with vaccuming (2days) -> Yuki, (+Kimura-san) (2018/6/14-15)