Line 9: Line 9:
  * DARM control with better ASC [[https://dac.icrr.u-tokyo.ac.jp/KAGRA/DAWG/Detchar/klog/klog24837|latest]]   * DARM control with better ASC [[https://dac.icrr.u-tokyo.ac.jp/KAGRA/DAWG/Detchar/klog/klog24878|latest]]

KAGRA commissioning strategy

  • Observation 24th May - 21st June
    • CAL/DET week 17-24 May
  • Status of 2023/04/19
  • High prior work
    • Alignment sensing and control
    • DARM control with better ASC latest

    • Injection test and tapping PSL room
    • Interferometer simulation
  • Middle term
    • Laser power increasing
    • suspension control
    • Data analysis of silent run

Silent run

  • Latest
  • Interesting topic
    • Sudden dropping of IRX/IRY transmittance light
      • Arm angular degree of freedom evaluation
    • Oplev glitches
      • Daytime / silent run
    • 117 Hz noise
      • Time variance
    • Sensitivity breath