Differences between revisions 2267 and 2268
Revision 2267 as of 2026-05-27 11:16:13
Size: 18008
Comment:
Revision 2268 as of 2026-05-27 13:36:38
Size: 18120
Comment:
Deletions are marked like this. Additions are marked like this.
Line 13: Line 13:
     * KAGRA f2f meeting:
     * LVK meeting: 2026/09/21-25 @Pune, Pre-registration started
     * KAGRA f2f meeting:
     * KIW-15:
     * KAGRA f2f meeting: 2026/08/26-28 @Osaka Metropolitan University
     * LVK meeting: 2026/09/21-25 @Pune, Pre-registration started
     * KAGRA f2f meeting: 2026/12/15-17 @ShanghaiTech, China
     * KIW-15: 2026/12/18-19 @ShanghaiTech, China

Meetings

  • Meeting time: 11:00-11:30 JST/KST on every Wednesday
  • Meeting room: Zoom3


20260527 (Wed.)

  • Agenda
    • Announcement
      • Scheduled conference
        • KAGRA f2f meeting: 2026/08/26-28 @Osaka Metropolitan University
        • LVK meeting: 2026/09/21-25 @Pune, Pre-registration started
        • KAGRA f2f meeting: 2026/12/15-17 @ShanghaiTech, China

        • KIW-15: 2026/12/18-19 @ShanghaiTech, China

      • KAGRA site report 04/27

      • Next meeting: 2026/06/10
        • Upgrade DetChar computers (YamaT)

        • DQR update (Yuzurihara)
        • lock loss study in the commissioning (YamaT, Yuzurihara) web

        • Update contents of summary page (Oshino)
        • Related to segment files (Uchikata, Narikawa)
        • pyCBC trigger list for O4a data (Narikawa and Uchikata)
        • provide the CAT1 veto-definer file for IPC glitch (Uchikata)
  • Minutes
    • h(t) reproduction during O4a run
      • CAL group is working on that. Dan-san and Sawada-san are planing to include the CAT1 information in the h(t) reproduction.
      • The CAT1 information will be refered via DQSEGDB. We need to update the segment information on DQSEGDB soon.


20260513 (Wed.)

  • Agenda
    • Announcement
      • Scheduled conference
        • KIW14: 2026/05/15-16 @Perugia, Italy web

        • GWADW: 2026/05/17-23 @Elba web

        • LVK meeting: 2026/09/21-25 @Pune, Pre-registration started
      • KAGRA site report 04/27

      • Next meeting: 2026/05/27
        • Upgrade DetChar computers (YamaT)

        • DQR update (Yuzurihara)
        • lock loss study in the commissioning (YamaT, Yuzurihara) web

        • Update contents of summary page (Oshino)
        • Related to segment files (Uchikata, Narikawa)
        • pyCBC trigger list for O4a data (Narikawa and Uchikata)
        • provide the CAT1 veto-definer file for IPC glitch (Uchikata)
  • Minutes


20260422 (Wed.)

  • Agenda
    • Announcement
      • Scheduled conference
        • KIW14: 2026/05/15-16 @Perugia, Italy web

        • GWADW: 2026/05/17-23 @Elba web

        • LVK meeting: 2026/09/21-25 @Pune, Pre-registration started
      • KAGRA site report 04/17

      • Next meeting: middle of April (the meeting time might be changed)
        • Upgrade DetChar computers (YamaT)

        • DQR update (Yuzurihara)
        • lock loss study in the commissioning (YamaT, Yuzurihara) web

        • Update contents of summary page (Oshino)
        • Related to segment files (Uchikata, Narikawa)
        • pyCBC trigger list for O4a data (Narikawa and Uchikata)
        • provide the CAT1 veto-definer file for IPC glitch (Uchikata)
  • Minutes


20260415 (Wed.)

  • Agenda
    • Announcement
      • Scheduled conference
        • KIW14: 2026/05/15-16 @Perugia, Italy web

        • GWADW: 2026/05/17-23 @Elba web

        • LVK meeting: 2026/09/21-25 @Pune, Pre-registration started
      • KAGRA site report 04/06

      • Next meeting: middle of April (the meeting time might be changed)
        • Upgrade DetChar computers (YamaT)

        • DQR update (Yuzurihara)
        • lock loss study in the commissioning (YamaT, Yuzurihara) web

        • Update contents of summary page (Oshino)
        • Related to segment files (Uchikata, Narikawa)
        • pyCBC trigger list for O4a data (Narikawa and Uchikata)
        • provide the CAT1 veto-definer file for IPC glitch (Uchikata)
  • Minutes
    • Commissioning
    • Input and review of the DetChar project into GRASP is underway. web

      • We need to input the contact person for each KAGRA activities.
      • Summary page -> Oshino-san? Pastavi, Gauch -> Yuzurihara

      • Computational resources
    • Collect opinions for the next KAGRA DetChar co-chair, including self-nominations or recommendations

    • Replacement of Pastaavi server was finished on 3/19

      • If you faced any errors or troubles, please contact Yuzurihara.
    • Update an environment for the online range-estimation code

    • 03/25 Failure of segment production on 3/21~2/22 UTC

      • The regular production of segment files at k1det1 has stopped between 3/21 UTC and 3/22 UTC. The time of stopping the segment production seems to be 2026-03-22 02:15:00 JST ~ 2026-03-22 02:30:00 JST. After that, the process to generate segment files restarted from 2026-03-22 14:45:00 JST.
      • git issue

      • KAGRA segment publishing was skipped for the March 21 date and manually run for March 22. Automatic publishing then got publishing caught up and is continuing on a daily basis.


20260325 (Wed.)

  • Agenda
    • Prsentation by Kyujin


20260318 (Wed.)


20260225 (Wed.)


20260204 (Wed.)

  • cancel


20260128 (Wed.)


20260114 (Wed.)


Past meeting

KAGRA/Subgroups/DET/Meeting (last edited 2026-05-27 13:36:38 by HirotakaYuzurihara)