26216
Comment:
|
27440
|
Deletions are marked like this. | Additions are marked like this. |
Line 3: | Line 3: |
* Meeting room: Zoom3 (https://zoom.us/j/5045179604) | * Meeting room: Zoom--(3 (https://zoom.us/j/5045179604))-- |
Line 9: | Line 9: |
=== 20201111 (Thu.) === * Agenda * C20 offline h(t) * O4 data release schedule * f2f/KIW7 * Minutes * C20 offline h(t) * Comment from DAC meeting: * Burst group can be provide GW event trigger list (schedule is not decided yet.) * Detail DQ info. around GRB events is very useful. * Data transfer on DET server * Done. * Omicron trigger generation for C20 h(t) * Generation itself was finished * There is no error on Omicron process. * Data transfer on KISTI cluster * Sangwook will do. * After the data transfer, Kihyun can resume his analysis with C20. * O4 data release schedule * [[KAGRA/Subgroups/DET/DataRlease|O4 data release schedule]] === 20201103 (Thu.) === * Agenda * C20 offline h(t) * O4 data release schedule * Minutes * C20 offline h(t) * Data should be copied to Kamioka server. * Glitch trigger search by Omicron * After data copy, it will be resumed. * hveto needs GW trigger search * We can demonstrate with omicron trigger of h(t). * After GW search triggers are available it will be resumed. * Data transfer to KISTI * discuss with DAS people on the next KGWG meeting * O4 data release schedule * Dead line: December .. * Please fill the requested time to link below. * http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/DET/DataRlease === 20201022 (Thu.) === * Agenda * Segment of O3GK * Documentation about O3GK info. * SummaryPage for O4 installation * Minutes === 20201008 (Thu.) === * Agenda * Planned power outage * hveto bug * Minutes * Planned power outage * All jobs on k1det must be stopped until 10/13 morning. * hveto bug * Code reading is in progress by Chihiro. * There is no response from LIGO people. * Analysis of Apr 8th - 21st data is on going. * Segment update * Discussion with Robert is resumed. * Upload method is 'pull' from LIGO side. * They already know the path to the segment files and types of segment file. * Remains tasks are schedule and segment name on DQSEGDB. |
=== 20210802 (Mon.) === * Agenda: * hveto analysis * O4 commissioning and preparation * Hardware injection plan during O4 * KAGRA O4 readiness * Proposal of O3GK DetChar paper * Minutes: * hveto analysis * clustering test * O4 commissioning * * Hardware injection plan during O4 * KAGRA CAL group is now gathering the plan of HWI during observations. * In LIGO case, in order to do HWI during obs., they need special and reasonable reasons. * KAGRA CAL also plan to adopt same procedures of the HWI management as LIGO. * If you have any HWI plan related to DET activities pls. share in DET telecons once. * We would like to discuss that the requested plans should be conducted during ER or obs. * O4 readiness * #15 [Cont'd] State Vector Definition * Responsible: '''T. Yamamoto -> T. Yamamoto''' * #16 + #20 Segment production with short latency * Responsible: '''K. Kokeyama -> S. Oshino, T. Yamamoto''' * #17 [Cont'd ] Status web pages (summary pages, [[https://monitor.ligo.org/gwstatus|gw status]], [[https://ldas-jobs.ligo.caltech.edu/~gwistat/gwistat/gwistat_p.html|gw istat]]) * Responsible: '''S. Oshino -> S. Oshino''' * #18 [Cont'd] DQ event validation * Responsible: '''C. Kozakai -> T. Yamamoto''' * #19 [Cont'd] GraceDB * Responsible: '''H. Tagoshi -> H. Tegoshi(?)''' * #21 [New] Data Category (at least CAT1) production * Responsible: '''!!!!!''' * #22 [New] RRT contribution * Responsible: '''H. Yuzurihara''' === 20210726 (Mon.) === * Agenda: * hveto analysis * O4 commissioning * O4 readiness * Minutes: * hveto analysis * Analyses with various clustering parameter are in progress. Kihyun will report in next telecon. * O4 commissioning * no updates * SummaryPages * lvalert * DET cluster * O4 readiness * It is preferable that the same person does not become multiple responsible person * As WP2021, DET tasks which is taken into account an effort follows readiness issues. * #15 [Cont'd] State Vector Definition * Responsible: '''T. Yamamoto -> T. Yamamoto''' * #16 + #20 Segment production with short latency * Responsible: '''K. Kokeyama -> S. Oshino, T. Yamamoto''' * #17 [Cont'd ] Status web pages (summary pages, [[https://monitor.ligo.org/gwstatus|gw status]], [[https://ldas-jobs.ligo.caltech.edu/~gwistat/gwistat/gwistat_p.html|gw istat]]) * Responsible: '''S. Oshino -> S. Oshino''' * #18 [Cont'd] DQ event validation * Responsible: '''C. Kozakai -> !!!!!''' * #19 [Cont'd] GraceDB * Responsible: '''H. Tagoshi -> H. Tegoshi(?)''' * #21 [New] Data Category (at least CAT1) production * Responsible: '''!!!!!''' * #22 [New] RRT contribution * Responsible: '''H. Yuzurihara''' === 20210719 (Mon.) === * Agenda: * hveto analysis * O4 commissioning * O4 readiness * Minutes * O4 commissioning * IMC-XARM commissioning * FNC control saturation [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=17464|klog17464]] * MC Oplev glitches and 120Hz line still exist (K1:VIS-MC{I,E,O}_TM_WIT_{P,Y}) * Unstational noise excess on Green laser above 100Hz still exists (K1:ALS- * O4 readiness * #15 [Cont'd] State Vector Definition * Responsible: '''T. Yamamoto -> T. Yamamoto(?)''' * #16 + #20 Segment production with short latency * Responsible: '''K. Kokeyama -> S. Oshino, T. Yamamoto''' * #17 [Cont'd ] Status web pages (summary pages, [[https://monitor.ligo.org/gwstatus|gw status]], [[https://ldas-jobs.ligo.caltech.edu/~gwistat/gwistat/gwistat_p.html|gw istat]]) * Responsible: '''S. Oshino -> S. Oshino(?)''' * #18 [Cont'd] DQ event validation * Responsible: '''C. Kozakai -> ''' * #19 [Cont'd] GraceDB * Responsible: '''H. Tagoshi -> H. Tegoshi(?)''' * #21 [New] Data Category (at least CAT1) production * Responsible: * #22 [New] RRT contribution * Responsible: '''H. Yuzurihara(?)''' === 20210705 (Mon.) === * Agenda: * O3GK paper * white paper * O4 commissioning * Minutes: * O3GK paper * Hveto was rerun with various parameters. * But there is no improvement in the veto efficiency. * white paper * Final version was released. * There was no additional comments from LV * [[https://git.ligo.org/operations/operations-white-paper-2021|LIGO Git]] * O4 commissioning * no report ----- === 20210628 (Mon.) === * Agenda * O3GK paper * white paper * O4 commissioning & preparation * Minutes * O3GK paper * Uchikata-san and Narikawa-san got a consistent results with Kozakai-san's one. * hveto was performed with 0.1 duration. * There is no efficient channel/sensor for glitch veto. * Some parameters comes from LIGO's one. * So we need to find better parameters for KAGRA's data. * We also need prepare the more efficient sensors for O4 observing run * Kihyun is also performing the crosscheck. (1 or 2 weeks later he can report.) * white paper * [[https://git.ligo.org/operations/operations-white-paper-2021|Draft on LIGO Git]] * TY will be added a description about CAGMon until LVK DET call. * WP will be fixed at Ops call on 6/30 (?) * O4 commissioning & preparation * IMC commissioning * [Ongoing] Glitches on OpLev * Because of too many glitches, it's difficult to investigate one by one. * K1:VIS-MC{I,E,O}_TM_WIT_{P,Y} (MC Oplevs) * [Fixed] PLL noise coming from broken circuit [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=17188|klog17188]] * [Ongoing] PLL also has glitches (maybe) due to electrostatic discharge. [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=17239|klog17239]] * K1:ALS-{X,Y}_BEAT_ERR_OUT_DQ (error signal) * K1:ALS-{X,Y}_PLL_SLOW_DAQ_OUT_DQ (feedback signal) * [Ongoing] non-stational correlation between IMC/PLL and Microphone * K1:CAL-CS_PROC_IMC_FREQUENCY_DQ (calibrated frequency noise) * K1:IMC-SERVO_SLOW_DAQ_OUT_DQ (feedback signal of IMC) * K1:ALS-{X,Y}_PLL_SLOW_DAQ_OUT_DQ (feedback signal of PLL) * [Ongoing] station correlation between PMC and Microphone * Investigation about significance of coherence is ongoing. ----- === 20210621 (Mon.) === * Agenda * O3GK paper * O4 whitepaper * O4 commissioning & preparation * Minutes * O4 white paper * The 1st version of the draft was submitted on June 17th. * [[https://git.ligo.org/operations/operations-white-paper-2021|LIGO Git]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12985|JGW-T-2112985]] * Final deadline is June 30th. * We can still do the miner fix. * O4 commissioning & preparation * IMC Commissioning * Omicron trigger searches for MC Oplevs were resumed ([[https://klog.icrr.u-tokyo.ac.jp/osl/?r=17150|klog#17150]]). * K1:VIS-MC{I,E,O}_TM_WIT_{P,Y} (oplev signals) * K1:VIS-IMMT{1,2}_TM_WIT_{P,Y} (as a reference of circuit noise) * SummaryPages * Glitch trigger tabs are added. * Loudest glitches can be seen on Pastavi (only internal ICRR network) === 20210614 (Mon.) === * Agenda * O3GK paper * O4 whitepaper * O4 commissioning & preparation * Minutes * O3GK paper * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13009|plot]] * O4 white paper * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12985|draft]] * It's better to include PEM plans in commissions support section if exits. * O4 commissioning & preparation * IMC Commissioning * We have now four frequency noise signal (IMC, PMC, PLL-X, PLL-Y) * K1:CAL-CS_PROC_IMC_FREQUENCY_DQ (calibrated IMC as MHz) * K1:PSL-PMC_PZT_HV_MON_OUT_DQ (calibrated PMC as Volt at PZT amp.) * K1:ALS-X_PLL_SLOW_DAQ_OUT_DQ (calibrated Green-X as Volt at PZT) * K1:ALS-X_PLL_SLOW_DAQ_OUT_DQ (calibrated Green-Y as Volt at PZT) * PMC (always) and others (sometimes) have correlation with microphone signal * K1:PEM-MIC_PSL_TABLE_PSL1_Z_OUT_DQ (calibrated as Pascal) * OpLev signals have some glitches and are investigated now. * K1:VIS-MC{I,E,O}_TM_WIT_{P,Y} * Real SUS motion?, electrical glitches?, scattered light? etc. * SummaryPages * Updated PSL, PEM tabs. * PLL signals are available. ----- === 20210607 (Mon.) === * Agenda * O3GK paper * O4 whitepaper * O4 commissioning & preparation * Minutes * O3GK paper * Preparing some plots about histgram and glitch rate of both KAGRA and GEO * O4 whitepaper * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12985|draft]] * O4 commissioning & preparation * CAGMon development * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12986|slide]] * Found correlation between wind power and BNS ranges * OMMT1 doesn't (maybe) have Oplev. It's better to confirm what kind of sensors were coneected. * BNS range channel has ~2min latency. It may become better results by considering the latency in BNS range calculation. * IMC commissioning * Noise investigation ([[https://klog.icrr.u-tokyo.ac.jp/osl/?r=16928|klog]]) * Correlation between IMC and MIC sometimes increase in spite of no change in microphone spectra. * Coupling coefficients may be changed in time. * Cross check of hveto results. * Kihyun's (KISTI) and Chihiro's (Kamioka) results were confirmed as consistent each other. * For O4 observing run, Kashiwa environment is also important for increasing machine power. * Requirement of machine power should be estimated soon (but it's strongly depends on the situation of O4 joining) * We plan to use 100-200 aux. channels and it's very helpful to analyze them at the same time for each pipeline. * lvalert * no report * SummaryPage * no report * DetChar cluster * no report ----- === 20210531 (Mon.) === * Agenda * O3GK paper * O4 readiness * O4 commissioning & preparation * Minutes * O3GK paper * Comparison with Uchikata-san's and GEO people's results is ongoing. * Kihyun is performing validation check of his results => He will report in next or 2 weeks later telecon. * O4 readiness * #15 [Cont'd] State Vector Definition * Responsible: '''T. Yamamoto -> T. Yamamoto(?)''' * #16 + #20 Segment production with short latency * Responsible: '''K. Kokeyama -> ''' * #17 [Cont'd ] Status web pages (summary pages, [[https://monitor.ligo.org/gwstatus|gw status]], [[https://ldas-jobs.ligo.caltech.edu/~gwistat/gwistat/gwistat_p.html|gw istat]]) * Responsible: '''S. Oshino -> S. Oshino(?)''' * #18 [Cont'd] DQ event validation * Responsible: '''C. Kozakai -> ''' * #19 [Cont'd] GraceDB * Responsible: '''H. Tagoshi -> H. Tegoshi(?)''' * #21 [New] Data Category (at least CAT1) production * Responsible: * #22 [New] RRT contribution * Responsible: '''H. Yuzurihara(?)''' * white paper 2021 * No progress in draft. * Task list will be based on O4 readiness. * If there is another task plan, please let TY know (maybe CAGMon, ICA, pastavi development etc.). * O4 commissioning & preparation * LVAlert * no report * SummaryPages update * no report * DET cluster * no report * CAGMon development * no report ----- === 20210524 (Mon.) === * Agenda * O3GK paper * O4 commissioning & preparation * O4 readiness * Minutes * O3GK paper * Discussion with GEO people is ongoing * O4 commissioning & preparation * MC circuit noise hunting * Current spectrum is too clean 1/f noise. * Frequency noise should shows 1/f spectrum. * But we haven't checked it's a real frequency noise (circuit noise etc.). * Nakano-kun said current spectrum is consistent with past measurements. * sound correlation * Investigating sound correlation with three microphones. [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12937|slide]] * lvalert test * no report * DET cluster * no report * SummaryPages * added for some IMC signals and it work well. * White paper 2021 * [[https://git.ligo.org/operations/operations-white-paper-2021|2021]] * [[https://git.ligo.org/operations/operations-white-paper-2020|2020]] === 20210517 (Mon.) === * Agenda * KAGRA O4 readiness * LVK white paper 2021 * O3GK paper * IMC commissioning * Minutes * KAGRA O4 readiness * #15 [Cont'd] State Vector Definition * Responsible: '''T. Yamamoto -> ''' * #16 [Cont'd] DQSEGDB capability * Responsible: '''K. Kokeyama -> ''' * #17 [Cont'd ] Status web pages (summary pages, [[https://monitor.ligo.org/gwstatus|gw status]], [[https://ldas-jobs.ligo.caltech.edu/~gwistat/gwistat/gwistat_p.html|gw istat]]) * Responsible: '''S. Oshino -> ''' * #18 [Cont'd] DQ event validation * Responsible: '''C. Kozakai -> ''' * #19 [Cont'd] GraceDB * Responsible: '''H. Tagoshi -> ''' * #20 [New] Segment production (merged with #16?) * Responsible: * #21 [New] Data Category (at least CAT1) production * Responsible: * #22 [New] RRT contribution * LVK white paper * Responsible: * What TY thought * All activities which are submitted as 2021 DET effort should be described on this documents. * It will be based on white paper 2020 and KAGRA O4 readiness. * Should clarify who will do each item (though personal name itself is not described on this documents). * Should show the rough timeline for R&D tasks. * O3GK paper * We need to continue to discuss with GEO people about GEO data analysis. * IMC Commissioning * Current IMC control signals on DGS are contaminated by circuit noise. * Important thing is that contamination is occurred only on DGS signals or also on real analog signals * Important channels * K1:IMC-SERVO_{MIXER,FAST,SLOW}_DAQ_OUT_DQ * K1:IMC-SERVO_NPRO_TEMP_BIAS_OUT_DQ * => These channels will be added to SummaryPages * O4 preparation * CAGMon development * no report * lvalert test * no report * DET cluster * no report === 20210510 (Mon.) === * Agenda * KIW * O3GK paper * IMC Commissioning * O4 preparation * Minutes * KIW {{{ - Status of KAGRA DET (20 min) => T. Yamamoto - Status of LIGO Detchar (20 min) - Status of Virgo Detchar (20 min) - Contributed Talk 1 - one slot from KAGRA (15 min) => H. Yuzurihara - Contributed Talk 2 - CAGMon tools (15 min) - Contributed Talk 3 - KISTI's data transfer and computing (15 min) }}} * O3GK paper * hveto process for GEO600 was done. * IMC Commissioning * [PMC] Acoustic coherence (20-200Hz) * [IMC] Oscillation? (13-15MHz) * O4 preparation * SummaryPages * no report * lvalert * no report * DET cluster * no report === 20210426 (Mon.) === * Agenda * O3GK analysis * O4 preparation * IMC Commissioning * Minutes * O3GK analysis * Omicron analysis of GEO was finished. * Checking results is ongoing. * We need to convert segment information on DQSEGDB to xml format. * After checking omicron results, hveto analysis can be started. * CAG Mon development * CAG Mon was able to detect some correlation in O3GK data * Prioritize is not done yet. * prioritize can be decided by correlation coefficient value or total duration of correlation appearing * We need more time to develop CAGMon (before we move to review process.). * IMC Commissioning * Microphone self noise is evaluating now. * They will be installed in PSL room * Paper writing person(s) from DET * TY takes over from Kozakai-san. * summary of lvalert test for LVK DET telecon ----- === 20210419 (Mon.) === * Agenda * O3GK analysis * O4 preparation (LV alert, SummaryPages, CAGMon) * PMC/IMC noise hunting * Minutes * O3GK analysis * GEO data analysis is started. * Channel list is prepared by GEO people. * PMC/IMC noise hunting * Sound noise * Frequency noise has coherence with microphone signal. * Sound noise affected to DARM sensitivity during O3GK. * Noise source and injection injection route should be investigated. * Electrical noise(?) * Accelerometer channel has coherence with frequency noise when PEM sensor turned OFF. * Circuit noise level is small, but some electrical coherence may exist. === 20210408 (Thu.) === * Agenda * O3GK analysis * SummaryPage * LV alert [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12760|slide]] * NDS2 * IMC Commissioning * Minutes * O3GK analysis * hveto re-analysis for a part of data was done. * round winner is same * significant is slightly difference, (using same conf. triggers, version, etc) * Next step is to check consistency of veto segment * GEO data * Analysis itself will be performed by KAGRA people * Understanding results will be performed by GEO (+KAGRA) people ----- === 20210401 (Thu.) === * Agenda * Progress of hveto analysis * DetChar cluster * lvalert * SummaryPages * RRT for O4 * Minutes |
Line 72: | Line 446: |
* 22:00 (JST/KST) tonight, LVK operation workshop will be held. === 20201001 (Thu.) === * Agenda * Planned power outage (10/14) * Minutes * Planned power outage (10/14) * k1det will be stopped until 10/13 morning. * They will come back online after 10/15. === 20200924 (Thu.) === * Agenda * Segment update * hveto problem * Minutes * Segment update * All 9 segment info. were fixed. * They had already copied to Kashiwa and Kamioka. * They should be copied also KISTI. * TY will contact to Robert again. * After then, segments will be uploaded to DQSEGDB. * hveto problem * Problem is cased by hveto * Some trigger files are sent to LDAS. * Investigation on LDAS is ongoing. * Conf. file on Kamioka should be share to KISTI. === 20200911 (Thu.) === |
* New slot of DET meeting. * => Pending because TY cannot know free time slot yet. (7 doodle poll is running...). * hveto * Omicron test analysis is successful. * hveto doesn't run on m31 yet. * We need to KISTI environment. * lvalert * Waiting response from LV people. * We need realistic json format of GW alert. * Only for the purpose of launching pipelines, dummy format is also used. * SummaryPages * The 1st version of VIS tab is already available (Only Type-A and guardians). * Importing PSL tab from LIGO is already done. * But there is many difference of channel name convention. ----- === 20210325 (Thu.) === * Agenda * Progress of hveto analysis * GEO data analysis * SummaryPage construction * lvalert test * PMC/IMC commissioning * Meeting time in the next FY * Minutes * Progress of hveto analysis * Consistency check still remains and it is solved yet. * GEO data analysis * Basic takeover is finished. * Uchikata-san and Narikawa-san can start to use Omicron and hveto. * But some error occurs on hveto@m31. * We should fixed environmental problem. * SummaryPage construction * The 1st version is already constructed on test directory. * We can apply it for product environment because current SummaryPage is not valid. * lvalert test * lvalert itself works well. * Next step is receiving alert. * We need to ask LIGO people about alert format etc. * PMC/IMC commissioning * Due to a lot of troubles, we haven't achieved IMC locked yet. * We may start some kind of commissioning from Mid or Late of April. * Meeting time in the next FY * TY will circulate doodle poll. === 20210317 (Thu.) === * O3GK paper * hveto cross-check * Checking Omicron parameter remains. * Required re-run for whole two weeks. * veto segment production * Merging short segments is not required. * GEO data analysis * It can be done by someone form Tagoshi-san's group. * O4 preparation * Kamioka cluster * It's pending due to the recovery work of power outage. * Takeover about Omicron, hveto, GlitchPlot * Takeover itself is done. * TY is finding candidate person of each pipelines toward O4. * Omega-scan test * Installing on Kashiwa * lvalert test * It's works well on k1det1 * SummaryPage update * The 1st version of VIS page is constructed. * It's being checked by Miyo-kun. * IMC commissioning * It is not locked yet because of some troubles. === 20210225 (Thu.) === * Agenda * Progress of O3GK paper * O4 preparation * Minutes * Progress of O3GK paper * Chihiro re-analysis with proper science segment for omicron triggers. * A part of Kihyun's analysis is done. * Cross-check can be done. But not start yet. * DetChar cluster in Kamioka * http://klog.icrr.u-tokyo.ac.jp/osl/?r=16082 * OS installation for master node was done. * Omega-scan test * Installation for Kashiwa cluster was done. * Error is occurred on gwdatafind. * SummaryPages * LVAlert ----- === 20210218 (Thu.) === * Agenda * Progress of O3GK paper * O3 data replay * O4 preparation * Minutes * Progress of O3GK paper * hveto conf is same * segment is used as latest same science segments * definition of cutting end of segments is difference. * Channel list is used as on github's one. * Next step -> unifying cutting definition. * Kihyun will re-run omicron with new segment cutting definition * We need to merge veto segment from a lot of short ones to continuous one. * O3 data replay * Main purpose of O3 data replay is performing end-2-end test of low-latency pipelines (CAL, DET, DAS, etc). * LV will use real O3 data. * KAGRA provides simulated data (~80Mpc for BNS) because of too poor sensitivity of O3GK data. * We may need to inject GWs on software with consistency with LV's real events. * Frame work of software injection is already available. * SummaryPage * Updating VIS page. * It will be closed to LIGO's one. * LVAlert * k1det1 can be used for test. * Need personal account because we use personal DCC account for accessing GraceDB. * Ask LV people how to get common account on next LVK DET meeting. ----- === 20210204 (Thu.) === * Agenda * Progress of O3GK paper * O3 data replay * O4 requirement * Minutes * Progress of O3GK paper * Omicron trigger transfer: Kamioka -> KISTI, it is postponed. * Young-Min asked KISTI administrator. * GW-search triggers have not been served yet. * O3 data replay * K1:OPS-SIM_GAUSS1_IN1 (simulated error signal) * K1:OPS-SIM_GAUSS1_OUT (simulated h(t) ) * gaussian noise as floor level * Some spectral lines (cal lines, violin mode, power lines) * Simulated glitches. * K1:OPS-SIM_GAUSS3_OUT (simulated auxiliary channel) * O4 requirement * DQ state vector (Yamamoto) * Providing on real-time model. * Data Quality Report (Yuzurihara) * First step is to use lvalert in order to receive GW alert from GraceDB. * Transient Event validation (Kozakai) * Basic idea is omicron+hveto (same as O3GK) * Takeover should be done from Kozakai-san. * Category veto (Yamamoto) * At least CAT1 should be provided. * We need to convert to veto-definer file format. * Spectral lines investigation (Yokozawa) * Listing of VIS-derived peak frequencies. ----- === 20210128 (Thu.) === * Agenda * Report from Burst search * Binary range evaluation with C20 offline h(t) * Progress of O3GK paper * Minutes * Report from Burst search * * Binary range evaluation with C20 offline h(t) * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12499|slide]] * Multi-taper and Welch show similar results * Bayesline result is slightly different from results by other two methods. * Estimated values are enough for O3GK (search) paper. * LVK review of this work is necessary for publishing results. * Progress of O3GK paper * === 20210121 (Thu.) === * Agenda * Announcement * LVK DetChar call will be held (Jan. 25 19:00 JST, KST) * Progress of O3GK paper * CAGMon results * O3 Data replay * Minutes * Progress of O3GK paper * Some difference between Kihyun's and Chihiro's results. * hveto setting should be tuned on conf file and re-run again. * GW search results will be provided 1-2 months later (?). * CAGMon results * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12481|slide]] * O3 data replay * LV requested the simulated data instead of O3GK data as KAGRA's data. * Auxiliary channels which has realistic coherence, coincidence etc are not available. * All multi-channel analyses cannot work well in such situation. * We need more discussion how do we join O3 data replay. === 20210107 (Thu.) === |
Line 99: | Line 640: |
* Duty cycle evaluation during O3GK * Lock loss study * O3GK DetChar talk in LVK meeting * Minuets |
* O4 preparation * Minutes |
Line 104: | Line 643: |
* Investigating strange behavior of hveto * On KISTI cluster, it works well. * Cross check of Chihiro's result and Kihyun's one is ongoing. * Round winner channel changes day by day. (Is it consistent with past results?) * K1:ASC-AS*** is not maintained well. * Both Safe and Unsafe channel list should be used as same ones. * Duty cycle evaluation during O3GK * 54% duty factor (2 weeks average) * BNS range, 500kpc (2 weeks average, cal mistakes is already revised.) * Only last a few days, BPC lines are enabled. * Lock loss study * BLRMS has some time delay. * LOCKED segments should be used ins * O3GK DetChar talk in LVK meeting * topics * Achievement of KAGRA readiness * Progress of concrete analysis * BNS ranges, duty factor as the overview. => Yamamoto, Kozakai === 20200903 (Thu.) === * Agenda * trigger generation * hveto analysis * Minutes * trigger generation * Analysis is finished. * Two channels have some problem. * The version problem of gwpy occurs on KISTI. * Latest channel list should be shared on GitHub. * hveto analysis * Omicron triggers should be shared with LIGO people. (Kamioka -> LIGO) => Kozakai-san will contact to Alex. * hveto works well on KISTI. => Kihyun will continue to analysis. === 20200827 (Thu.) === * Agenda * Segment Update * KAGRA data analysis * GEO data analysis * Minutes * Segment Update * Broken frames period are removed from new science segments (K1-GRD_SCIENCE_MODE_AND_DAQ_STATUS_OK) * Broken frames period as provided a new segments definition (K1-DAQ_STATUS_BAD) * They are store in detchar@m31:Segments/ * Obsolete segments are still generated (???). * KAGRA data analysis * Some PEM sensors are added to the channel list for omicron analysis. => (until next week.) * When is the location of each sensor fixed? => At least around Feb. (also for PORTABLE) * Disk full problem and script errors are occur KISTI * hveto problem occurs (Apr 15. UTC) * GEO data analysis === 20200806 (Thu.) === * Agenda * f2f meeting * progress of O3GK * Minutes * f2f meeting * We have parallel session. (need to prepare two talks for Experiment and Data analysis.) * Experiment -> Yamamoto, Data Analysis -> Kozakai? Kihyun also considers an oral or a poster session. * progress of O3GK * Reconsidering Safe/Unsafe channels is on going. * We need to re-analyze for some channels and some segments by Omicron. * Cross check of KAGRA data analysis can be done by Kihyun. * GEO data transfer to KISTI cluster is almost done. * Kihyun can continue to analyze the GEO data. * We need to do cross check of the results of GEO data analysis. === 20200730 (Thu.) === * Agenda * Safe/Unsafe channel ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11854|slide]]) === 20200723 (Thu.) === * Cancelled === 20200702 (Thu.) === * Agenda * Safe/Unsafe channel * Omicron troubles * GEO data analysis === 20200625 (Thu.) === * Agenda * Broken frames * O3GK * trigger generation * hveto * CAGMon * Minutes * Broken frames * Totally 26 broken frames. (Science: 4, Locked: 4, Unlocked: 18) * TY will remove 32-second long data which is in broken frames from science mode segments by manually. * After then, the segment script will be updated for taking into account broken frames. * O3GK * trigger generation * Some runtime error occurs on the Kamioka server. * Trigger generation test is started with KAGRA data on the KISTI server. * GEO data transfer to the KISTI server is not finished yet. * hveto * Test with short time data is ongoing * CAGMon * Analysis with Apr. observation data is already started. * Used Channel list is same as YuzuSummary's one. * Safe/Unsefe channel list is also required --> will be discussed next week. === 20200618 (Thu.) === * Agenda * LVK operations white paper * task list * introduction of ICA * Current progress of CAGMON === 20200610 (Thu.) === * Agenda * DAQ error during O3GK ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11751|JGW-G2011751]]) * KAGRA data analysis (Omicron/hveto) * GEO data analysis (Omicron/CAGMon) * Minutes * DAQ error during O3GK * Ueno-san found file reading error with following frames. {{{ K-K1_C-1270444416-32.gwf 2020-04-09 14:13:18 (JST) K-K1_C-1270570496-32.gwf 2020-04-11 01:14:38 (JST) K-K1_C-1270577376-32.gwf 2020-04-11 03:09:18 (JST) K-K1_C-1270680672-32.gwf 2020-04-12 07:50:54 (JST) K-K1_C-1271033536-32.gwf 2020-04-16 09:51:58 (JST) K-K1_C-1271174912-32.gwf 2020-04-18 01:08:14 (JST) K-K1_C-1271226144-32.gwf 2020-04-18 15:22:06 (JST) K-K1_C-1271440736-32.gwf 2020-04-21 02:58:38 (JST) }}} * KAGRA data analysis * Omicron search around GRB was finished. * Whole 2-weeks analysis is now being performed. * It's better to remove some channels from unsafe channel list. * We should test hveto with some channel lists. === 20200604 (Thu.) === * Agenda * LVK white paper * O3GK analysis * Minutes * LVK white paper * Operations white paper {{{ 2. Observatory Operations 3. Detector Commissioning 4. Calibration 5. Detector Characterization 6. Computing and software }}} * Observational Science white paper {{{ 1.1 Burst 1.2 CBC 1.3 CW 1.4 Stochastic 2 Burst 3 CBC 4 CW 5 Stochastic 6 Burst+CBC+DetChar Joint Activity Plans 7 Burst+CBC Joint Activity Plans 8 Burst+Stochastic Joint Activity Plans 9 Stochastic+CBC 10 Stochastic+Detchar }}} === 20200521 (Thu.) === * Agenda * Talk plans for JPS meeting * PTEP paper * O3GK analysis * Minutes * Talk plans for JPS meeting * TY will give a DET summary talk. * Deadline 4th June. * PTEP paper * Writing draft was finished. * After checking the whole, draft will be submitted to CPC. * O3GK analysis * Segment information is being reprovided as Science, Locked , Unlock, and OMC Overflow. * Omicron triggers will be regenerated with new segment information. * hveto will be applied after generating Omicron triggers with new segment and configurations. * O3GK data is available on the KISTI cluster. * Bug fix is required for using CAGMon. === LVK 20200518/19 (Mon./Tue.) === * [[https://wiki.ligo.org/DetChar/Telecon20200518|Agenda]] === 20200514 (Thu.) === * Agenda * PTEP paper * Regenerate segment information * Regenerate omicron triggers * SummaryPage stability * Activities on KISTI * Minutes === 20200507 (Thu.) === * O3GK DetChar analysis * KAGRA DQ flags/segments * Glitch searches * Burst trigger veto * GEO DQ flags/segments * Minutes * KAGRA DQ flags/segments * Reproducing OMC overflow segments * Overflow segments are provided as separately from Science mode * 'SegmentList_locked_UTC_***.txt' is expired. * Reproduced segments information should be uploaded to DQSEGDB * Glitch searches * Omicron configuration should be reoconsidered * Triggers will be regenerated with new configurations * Discussion of configuration (chunk-size, intervals...) is ongoing. * Burst trigger veto * All cWB triggers are not vetoed by hveto * cWB has some problems(?) * Omicron parameter should be considered again. * GEO DQ flags/segments * GEO people are now providing new frames including both the strain signal and important auxiliary channels. * GEO frames will be transferred form CIT to Kashiwa (and Kashiwa to KISTI?) * Omicron can be used on KISTI cluster * We need the information about the amount of data. * CAGMon results will be also available in near future. === 20200423 (Thu.) === * Irregular meeting / Agenda: * 17:00-, zoom 2 https://zoom.us/j/6676627462 * Participants: Kozakai, Ochino, Kokeyama ==== Minutes ==== * How to manage a DQ check for event alerts * Shall we make a proper data quality report for each event? => after collecting information we will make a report and put on JGW doc * Does ligo have the template to be sent to segdb? => to be checked * For now, we make a dedicated wiki page * list a specific check list: For GRB200415A, check resG condition, check if OMC PD A was overflow or not * Share Detchar info with CAL, BURST, DMG * How to organize RRT for the next obs === 20200416 (Thu.) === * Agenda: * Run status * DQ Shift * KISTI activities === 20200402 (Thu.) === * Agenda: * File server status * SummaryPage * Omicron trigger generation * Segment Information * KISTI results capability * Observing run * GlitchPlot for burst analysis * DetChar DQ shift * Update for O4 plan === 20200326 (Thu.) === * Agenda: * Commissioning situation * Commissioning test will be continued until Mar. 31st * During Apr. 1st to 7th, engineering run will be performed. * After Apr. 7th, we have a two weeks observing run (only KAGRA) * If LIGO, and Virgo will come back to observing run, we will aim to join O3. * SummaryPage (RAID trouble) * File server has a disk problem. * RAID system is now being rebuilt. (It will be finished today's evening.) * GlitchPlot for Burst evnet triggers * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11571|JGW-G2011571]] * DetChar pipelines on KISTI * Code update of CAGMon * === 20200312 (Thu.) === * Agenda: * Current status of site (commissioning) activities * Commissioning break was started from 10th Mar. It continues until 24th Mar. * Joinning O3 should be discussed on JRPC meeting on 26th Mar.(?). * Update of DQ state vector * Science mode during 25th Feb. - 10th Mar. didn't include SDF flags. * I updated to contain the SDF flags as the one of the condition of the Science mode. * Automation plan of GlitchPlot for GW event alert * We plan to move GlitchPlot from ICRR cluster to Kamioka computers. * Requirement: * Disk: 100MB/event * CPU: ??? * Data transfer to KISTI * ER on Dec. data was transferred. * Many tools is already available on KISTI cluster. * Announce about LVK session * We plan to have DetChar telecons instead of LVK meeting. * TY circulate concrete date and time on ML after deciding. === 20200305 (Thu.) === * Agenda: * Observing run status * Binary range is ~400kpc (Best is 500kpc.) * Trigger rate check * Quite difference Trigger rate between the strain signal and the error signal. * Glitch plot with Burst triggers. * SummaryPage troubles * Some process (LSC.ini) was frequently stopped. * RRT tools * Shinkai-san suggested us it's better to prepare the dedicated workstation and mail address. * RRT tools from medm interface is available at Kamioka site * LValert can be receive alert from GraceDB. * Event information is not enough (no mass parameter). * Tagoshi-san tested on Kashiwa server. === 20200227 (Thu.) === * Agenda: * SummaryPage trouble * Configuration file errors -> fixed and checking now (Oshino-san) * Past two day's pages will be regenerated. * RRT * Short-time SummaryPage generator tool on MEDM. * lvalert may be already available for KAGRA. * We can receive RRT call by setting 'GCN PRELIM SENT'. * DQ shift * This taks should be assigned for collaborator shift. * TY will discuss this issue with Miyoki-san. === 20200130 (Thu.) === * Agenda: * KAGRA Readiness * RRT shift * PEM DQ flags === 20200116 (Thu.) === * Agenda: * Minimum goal of KAGRA readiness issue * State Vector definition * goal: send {{{K1:DET-DQ_STATE_VECTOR}}} * status: Done. * DQSEGDB capability * goal: send OBSERVATION segment * status: 95% Automation should be done. (will be done by Robert) * Web page preparation * goal: publish SummaryPage * status: Done. * DQ event validation * under discussion Probably we cannot provide so many veto segments.<<BR>> So at least one (hopefully a few) simple segments will be provided and uploaded.<<BR>> (e.g. Omicron triggered segments, Earthquake segments, etc.) * GraceDB issue * under discussion Full(?) access to GraceDB is opened for KAGRA people.<<BR>> Developing/importing GraceDB API tools is better to be done with DET and DAWG. === 20200109 (Thu.) === * Agenda: * KAGRA readiness issue * State Vector definition * SV is provided on the real-time IFO control model. * SV is contained in both raw frames and low-latency frames. * SV definition is summarized on [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/DET/DataQuality|Wiki]] and kept as latest information. * Finally it should be summarized as a tech-report. * DQSEGDB capability * Segment files are provided on the Kamioka and Kashiwa servers. * Files will be shared with LV by rsync+ssh method. * Accessing gwdet.icrr.u-tokyo.ac.jp from LIGO's DQSEGDB was already successfully. * Web page preparation * SummaryPage is opened also for remote site people. * Contents are being closed to LIGO's SummaryPage contents. * TY and Alex are now updating some softwares on k1sum0. So SummaryPage may become unstable next couple of days. * DetChar/DQ event validataion * We are now planning to provide DQ flags indicating earthquake, loud seismotion, etc. (See Kozakai-san's slide) * These information are shared with LV via DQSEGDB. * Low-Latency tools and GraceDB issues * Some tools used as low-latency ones in LIGO (Omicron, hveto etc.) are available. * We are waiting for the update of GraceDB authentication by LIGO. * Offline DQ [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11176}|Slides]] * E-run analysis (washimi) [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11177|Slide]] === Old meeting === |
* Analysis itself was finished. * Results by Chihiro and Kihyun are now comparing. * => Some conf. is still difference. * At least after finishing paper work, omicron triggers should be shared on Kashiwa cluster for remote site people. * O4 preparation * Model update will be finished soon. * => After model update, suspension commissioning will be started. * SummaryPages seems to be stopped. * => Because of the channel name update by VIS model changes. * => Current situation of real-time model is slightly complicated. ITMY: Old model, others: new model etc. * => After finishing CRY measurements, all suspension models are unified. === Past meeting === * [[KAGRA/Subgroups/DET/Meeting/2020|2020]] |
Line 487: | Line 658: |
=== 20191121 (Tue.) === * Agenda: * Offline Web tool at Kashiwa * Tools stability * Joint meeting wit Busrt search group === 20191107 (Tue.) === * Agenda: * Offline Web tool at Kashiwa * GlitchPlot [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10935|summary slides]] * Tools stability * [[https://www.icrr.u-tokyo.ac.jp/~washimi/KAGRA/PEM/PEMmap/|PEM MAP]], [[https://www.icrr.u-tokyo.ac.jp/~washimi/KAGRA/PEM/KamioKaminari/|KamioKaminari]], [[https://www.icrr.u-tokyo.ac.jp/~washimi/KAGRA/SEM/|Slow Environment Monitors ]] === 20191031 (Tue.) === * Agenda: * Tools stability * Activities on Kashiwa cluster * Talk on f2f meeting === 20191024 (Tue.) === * Agenda: * Tools stability * KGWG activities * PTEP PWT * Minutes: * https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10903 === 20191010 (Tue.) === * Agenda: * SummaryPage update * DetChar data server at Kamioka * Data transfer to KISTI (If someone knows the situation) === 20190905 (Tue.) === * Agenda: * SummaryPage updates * Minutes * https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10785 === 20190827 (Thu.) === * SummaryPageMeeting20190827 === 20190801 (Thu.) === * Agenda: * Each pipeline status (Omicron, Fscan, Glitch plot…) * Purpose/Goal of the next engineering run === 20190725 (Thu.) === * Agenda * Engineering run results from data analysis * DetChar tool automation plan * update of PEM map [[https://github.com/gw-pem/kagra-pem/issues/159|detail]] === 20190723 (Tue.) === * SummaryPageMeeting20190723 === 20190711 (Thu.) === * Agenda * F2F talk(s) === 20190704 (Thu.) === * Agenda * Kashiwa cluster ([[attachment:DET_Kashiwa_Memo.txt|attachment]]) * Engineering run on Jul. 13th. ([[KAGRA/Subgroups/DET/RUN|link]]) * Data Category flags for BURST. ([[KAGRA/Subgroups/DET/DataQuality|link]], [[https://github.com/gw-detchar/DQConvert|generation script]]) * YuzuSummary ([[https://www.icrr.u-tokyo.ac.jp/~yuzu/bKAGRA_summary/html/GlitchPlot/20190702/1246085661.0_K1:IMC-CAV_TRANS_OUT_DQ.html|sample]]) === 20190613 (Thu.) === * Agenda * Database issue * See [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/DET/Meeting/LVK0612|LVK Joint meeting]] * Progresses of Engineering Run analysis * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/DET/RUN|RUN Summary]] * What else * Announcement * TY requested DMG group to create the detchar account on the Kashiwa server. * Data transfer cannot be done due to much amount of data size. So we are now trying to reduce data size. * TY plan to discuss with Kanda-san on next Tue. and Wed. how to transfer the DetChar information. * Mervyn from Fukuoka Univ. plans to come to Kamioka from 25th to 28th Jun. === LVK 20190611/0612 (Tue/Wed) === [[KAGRA/Subgroups/DET/Meeting/LVK0612|Agenda]] === 20190606 (Thu.) === * Agenda * Urgent task for ER with X-arm cavity * Omicron update (Yamamoto) ... Done. * DQ Vector update (Yamamoto). * Glitch visualization (Kozakai) * SummaryPage update (Yokozawa) * Segment file update (Oshino) * Fscan update (Oshino, Yamamoto) === 20190530 (Thu.) === * Agenda * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/DET/Task/O3|Task list for O3 run and Engineering Run on 8th Jun]] * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/DET/DataQuality|Data Quality Flags]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10289|Glitch plot]] === 20190523 (Thu.) === * Agenda * Task list for Engineering Run on 8th Jun. * Trigger based plotting tool [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10253|ckozakai]] === 20190516 (Thu.) === * Agenda * Comment of JRPC meeting and PAB review. * * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=xxxx|Minutes]] === 20190509 (Thu.) === * Skipped due to the PAB review. === 20190502 (Thu.) === * Skipped due to the Japanese holiday. === 20190425 (Thu.) === * Agenda * SDF preparation * DQ flags for data analysis * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10147|Minutes]] === 20190418 === * Skipped due to the F2F meeting === 20190411 (Thu.) === * Agenda * SDF flags preparation [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9228|slide]] * Fscan on SummaryPage * DetChar computers * Tool development [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10044}|slide]] === 20190404 (Thu.) === * Agenda * IMC run (3/29-3/31, 4/3-4/4) * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10024|yamat]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10029|ckozakai]] * Progress of Kamioka works * hveto * There are some bugs on the latest version of hveto. * Old version of hveto was installed in k1sumX and will be installed in k1det0. * Fscan * Automation of the Scan is already succeeded. * We found a bug in our cache generation system and start to fix this bug. === 20190328 (Thu.) === * Agenda * Progress of Kamioka works * Fscan run on test computer by manually. * For automating and integrating to SummaryPage, we need to generate Segment file in automatically. * We need to consider how to pick up line information and list up it from FScan results. * Automation of hveto on KISTI is succeeded with PMC error signal and PEM channels. * We start to install hveto on hveto@k1sumX. === 20190322 (Fri.) === * --(Zoom3)-- -> Zoom2 (https://zoom.us/j/6676627462) * Agenda * f2f talk * 1 slot (Status talk -> T. Yamamoto) * DAC satellite [?] * Task list in next week * Sharing the current situation of SummaryPage * Preparing k1det0/1 * Managing SDF for VIS * Installing LIGO's tools and KGWG's tools * Task list of engineering run * Providing glitch information: (t, f, SNR) * Providing line information: (f, df, Amplitude, noise source) * Preparing the information server * hveto and glitch identification (Pil-Jong & Kokeyama) * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9984|PMC important channel list]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9258|Glitch analysis presented in JPS]] === 20190314 === * Skipped due to the JPS meeting === 20190307 === * Agenda * Task list of engineering run on May * Tools and results from KGWG * Summary Page isseus * f2f talk === 20190228 === * Meeting room * Zoom3 (https://zoom.us/j/5045179604) * Agenda * Magnetic coupling proposal with LV (Jishnu) * Enhancement of SummaryPage * Data sharing between Kamioka, Kashiwa, and KISTI * Young-Min's trip * Slide * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9903|yamat]] |
Meetings
- Meeting time: 14:00-15:00 JST/KST on every Thursday
Meeting room: Zoom3 (https://zoom.us/j/5045179604))--
Contents
-
Meetings
-
Agenda & Minutes
- 20210802 (Mon.)
- 20210726 (Mon.)
- 20210719 (Mon.)
- 20210705 (Mon.)
- 20210628 (Mon.)
- 20210621 (Mon.)
- 20210614 (Mon.)
- 20210607 (Mon.)
- 20210531 (Mon.)
- 20210524 (Mon.)
- 20210517 (Mon.)
- 20210510 (Mon.)
- 20210426 (Mon.)
- 20210419 (Mon.)
- 20210408 (Thu.)
- 20210401 (Thu.)
- 20210325 (Thu.)
- 20210317 (Thu.)
- 20210225 (Thu.)
- 20210218 (Thu.)
- 20210204 (Thu.)
- 20210128 (Thu.)
- 20210121 (Thu.)
- 20210107 (Thu.)
- Past meeting
-
Agenda & Minutes
Agenda & Minutes
20210802 (Mon.)
- Agenda:
- hveto analysis
- O4 commissioning and preparation
- Hardware injection plan during O4
- KAGRA O4 readiness
Proposal of O3GK DetChar paper
- Minutes:
- hveto analysis
- clustering test
- O4 commissioning
- Hardware injection plan during O4
- KAGRA CAL group is now gathering the plan of HWI during observations.
- In LIGO case, in order to do HWI during obs., they need special and reasonable reasons.
- KAGRA CAL also plan to adopt same procedures of the HWI management as LIGO.
- If you have any HWI plan related to DET activities pls. share in DET telecons once.
- We would like to discuss that the requested plans should be conducted during ER or obs.
- O4 readiness
- #15 [Cont'd] State Vector Definition
Responsible: T. Yamamoto -> T. Yamamoto
- #16 + #20 Segment production with short latency
Responsible: K. Kokeyama -> S. Oshino, T. Yamamoto
#17 [Cont'd ] Status web pages (summary pages, gw status, gw istat)
Responsible: S. Oshino -> S. Oshino
- #18 [Cont'd] DQ event validation
Responsible: C. Kozakai -> T. Yamamoto
- #19 [Cont'd] GraceDB
Responsible: H. Tagoshi -> H. Tegoshi(?)
- #21 [New] Data Category (at least CAT1) production
Responsible: !!!!!
- #22 [New] RRT contribution
Responsible: H. Yuzurihara
- #15 [Cont'd] State Vector Definition
- hveto analysis
20210726 (Mon.)
- Agenda:
- hveto analysis
- O4 commissioning
- O4 readiness
- Minutes:
- hveto analysis
- Analyses with various clustering parameter are in progress. Kihyun will report in next telecon.
- O4 commissioning
- no updates
- lvalert
- DET cluster
- no updates
- O4 readiness
- It is preferable that the same person does not become multiple responsible person
- As WP2021, DET tasks which is taken into account an effort follows readiness issues.
- #15 [Cont'd] State Vector Definition
Responsible: T. Yamamoto -> T. Yamamoto
- #16 + #20 Segment production with short latency
Responsible: K. Kokeyama -> S. Oshino, T. Yamamoto
#17 [Cont'd ] Status web pages (summary pages, gw status, gw istat)
Responsible: S. Oshino -> S. Oshino
- #18 [Cont'd] DQ event validation
Responsible: C. Kozakai -> !!!!!
- #19 [Cont'd] GraceDB
Responsible: H. Tagoshi -> H. Tegoshi(?)
- #21 [New] Data Category (at least CAT1) production
Responsible: !!!!!
- #22 [New] RRT contribution
Responsible: H. Yuzurihara
- hveto analysis
20210719 (Mon.)
- Agenda:
- hveto analysis
- O4 commissioning
- O4 readiness
- Minutes
- O4 commissioning
- IMC-XARM commissioning
FNC control saturation klog17464
- MC Oplev glitches and 120Hz line still exist (K1:VIS-MC{I,E,O}_TM_WIT_{P,Y})
- Unstational noise excess on Green laser above 100Hz still exists (K1:ALS-
- IMC-XARM commissioning
- O4 readiness
- #15 [Cont'd] State Vector Definition
Responsible: T. Yamamoto -> T. Yamamoto(?)
- #16 + #20 Segment production with short latency
Responsible: K. Kokeyama -> S. Oshino, T. Yamamoto
#17 [Cont'd ] Status web pages (summary pages, gw status, gw istat)
Responsible: S. Oshino -> S. Oshino(?)
- #18 [Cont'd] DQ event validation
Responsible: C. Kozakai ->
- #19 [Cont'd] GraceDB
Responsible: H. Tagoshi -> H. Tegoshi(?)
- #21 [New] Data Category (at least CAT1) production
- Responsible:
- #22 [New] RRT contribution
Responsible: H. Yuzurihara(?)
- #15 [Cont'd] State Vector Definition
- O4 commissioning
20210705 (Mon.)
- Agenda:
- O3GK paper
- white paper
- O4 commissioning
- Minutes:
- O3GK paper
- Hveto was rerun with various parameters.
- But there is no improvement in the veto efficiency.
- white paper
- Final version was released.
- There was no additional comments from LV
- O4 commissioning
- no report
- O3GK paper
20210628 (Mon.)
- Agenda
- O3GK paper
- white paper
O4 commissioning & preparation
- Minutes
- O3GK paper
- Uchikata-san and Narikawa-san got a consistent results with Kozakai-san's one.
- hveto was performed with 0.1 duration.
- There is no efficient channel/sensor for glitch veto.
- Some parameters comes from LIGO's one.
- So we need to find better parameters for KAGRA's data.
- We also need prepare the more efficient sensors for O4 observing run
- Kihyun is also performing the crosscheck. (1 or 2 weeks later he can report.)
- white paper
- TY will be added a description about CAGMon until LVK DET call.
- WP will be fixed at Ops call on 6/30 (?)
O4 commissioning & preparation
- IMC commissioning
[Ongoing] Glitches on OpLev
- Because of too many glitches, it's difficult to investigate one by one.
- K1:VIS-MC{I,E,O}_TM_WIT_{P,Y} (MC Oplevs)
[Fixed] PLL noise coming from broken circuit klog17188
[Ongoing] PLL also has glitches (maybe) due to electrostatic discharge. klog17239
- K1:ALS-{X,Y}_BEAT_ERR_OUT_DQ (error signal)
- K1:ALS-{X,Y}_PLL_SLOW_DAQ_OUT_DQ (feedback signal)
- [Ongoing] non-stational correlation between IMC/PLL and Microphone
- K1:CAL-CS_PROC_IMC_FREQUENCY_DQ (calibrated frequency noise)
- K1:IMC-SERVO_SLOW_DAQ_OUT_DQ (feedback signal of IMC)
- K1:ALS-{X,Y}_PLL_SLOW_DAQ_OUT_DQ (feedback signal of PLL)
- [Ongoing] station correlation between PMC and Microphone
- Investigation about significance of coherence is ongoing.
- IMC commissioning
- O3GK paper
20210621 (Mon.)
- Agenda
- O3GK paper
- O4 whitepaper
O4 commissioning & preparation
- Minutes
- O4 white paper
- The 1st version of the draft was submitted on June 17th.
- Final deadline is June 30th.
- We can still do the miner fix.
O4 commissioning & preparation
- IMC Commissioning
Omicron trigger searches for MC Oplevs were resumed (klog#17150).
- K1:VIS-MC{I,E,O}_TM_WIT_{P,Y} (oplev signals)
- K1:VIS-IMMT{1,2}_TM_WIT_{P,Y} (as a reference of circuit noise)
- Glitch trigger tabs are added.
- Loudest glitches can be seen on Pastavi (only internal ICRR network)
- IMC Commissioning
- O4 white paper
20210614 (Mon.)
- Agenda
- O3GK paper
- O4 whitepaper
O4 commissioning & preparation
- Minutes
- O3GK paper
- O4 white paper
- It's better to include PEM plans in commissions support section if exits.
O4 commissioning & preparation
- IMC Commissioning
- We have now four frequency noise signal (IMC, PMC, PLL-X, PLL-Y)
- K1:CAL-CS_PROC_IMC_FREQUENCY_DQ (calibrated IMC as MHz)
- K1:PSL-PMC_PZT_HV_MON_OUT_DQ (calibrated PMC as Volt at PZT amp.)
- K1:ALS-X_PLL_SLOW_DAQ_OUT_DQ (calibrated Green-X as Volt at PZT)
- K1:ALS-X_PLL_SLOW_DAQ_OUT_DQ (calibrated Green-Y as Volt at PZT)
- PMC (always) and others (sometimes) have correlation with microphone signal
- K1:PEM-MIC_PSL_TABLE_PSL1_Z_OUT_DQ (calibrated as Pascal)
OpLev signals have some glitches and are investigated now.
- K1:VIS-MC{I,E,O}_TM_WIT_{P,Y}
- Real SUS motion?, electrical glitches?, scattered light? etc.
- We have now four frequency noise signal (IMC, PMC, PLL-X, PLL-Y)
- Updated PSL, PEM tabs.
- PLL signals are available.
- Updated PSL, PEM tabs.
- IMC Commissioning
20210607 (Mon.)
- Agenda
- O3GK paper
- O4 whitepaper
O4 commissioning & preparation
- Minutes
- O3GK paper
- Preparing some plots about histgram and glitch rate of both KAGRA and GEO
- O4 whitepaper
O4 commissioning & preparation
- CAGMon development
- Found correlation between wind power and BNS ranges
- OMMT1 doesn't (maybe) have Oplev. It's better to confirm what kind of sensors were coneected.
- BNS range channel has ~2min latency. It may become better results by considering the latency in BNS range calculation.
- IMC commissioning
Noise investigation (klog)
- Correlation between IMC and MIC sometimes increase in spite of no change in microphone spectra.
- Coupling coefficients may be changed in time.
- Cross check of hveto results.
- Kihyun's (KISTI) and Chihiro's (Kamioka) results were confirmed as consistent each other.
- For O4 observing run, Kashiwa environment is also important for increasing machine power.
- Requirement of machine power should be estimated soon (but it's strongly depends on the situation of O4 joining)
- We plan to use 100-200 aux. channels and it's very helpful to analyze them at the same time for each pipeline.
- lvalert
- no report
- no report
DetChar cluster
- no report
- CAGMon development
- O3GK paper
20210531 (Mon.)
- Agenda
- O3GK paper
- O4 readiness
O4 commissioning & preparation
- Minutes
- O3GK paper
- Comparison with Uchikata-san's and GEO people's results is ongoing.
Kihyun is performing validation check of his results => He will report in next or 2 weeks later telecon.
- O4 readiness
- #15 [Cont'd] State Vector Definition
Responsible: T. Yamamoto -> T. Yamamoto(?)
- #16 + #20 Segment production with short latency
Responsible: K. Kokeyama ->
#17 [Cont'd ] Status web pages (summary pages, gw status, gw istat)
Responsible: S. Oshino -> S. Oshino(?)
- #18 [Cont'd] DQ event validation
Responsible: C. Kozakai ->
- #19 [Cont'd] GraceDB
Responsible: H. Tagoshi -> H. Tegoshi(?)
- #21 [New] Data Category (at least CAT1) production
- Responsible:
- #22 [New] RRT contribution
Responsible: H. Yuzurihara(?)
- #15 [Cont'd] State Vector Definition
- white paper 2021
- No progress in draft.
- Task list will be based on O4 readiness.
- If there is another task plan, please let TY know (maybe CAGMon, ICA, pastavi development etc.).
O4 commissioning & preparation
- LVAlert
- no report
SummaryPages update
- no report
- DET cluster
- no report
- CAGMon development
- no report
- LVAlert
- O3GK paper
20210524 (Mon.)
- Agenda
- O3GK paper
O4 commissioning & preparation
- O4 readiness
- Minutes
- O3GK paper
- Discussion with GEO people is ongoing
O4 commissioning & preparation
- MC circuit noise hunting
- Current spectrum is too clean 1/f noise.
- Frequency noise should shows 1/f spectrum.
- But we haven't checked it's a real frequency noise (circuit noise etc.).
- Nakano-kun said current spectrum is consistent with past measurements.
- Current spectrum is too clean 1/f noise.
- sound correlation
Investigating sound correlation with three microphones. slide
- lvalert test
- no report
- DET cluster
- no report
- added for some IMC signals and it work well.
- MC circuit noise hunting
- White paper 2021
- O3GK paper
20210517 (Mon.)
- Agenda
- KAGRA O4 readiness
- LVK white paper 2021
- O3GK paper
- IMC commissioning
- Minutes
- KAGRA O4 readiness
- #15 [Cont'd] State Vector Definition
Responsible: T. Yamamoto ->
- #16 [Cont'd] DQSEGDB capability
Responsible: K. Kokeyama ->
#17 [Cont'd ] Status web pages (summary pages, gw status, gw istat)
Responsible: S. Oshino ->
- #18 [Cont'd] DQ event validation
Responsible: C. Kozakai ->
- #19 [Cont'd] GraceDB
Responsible: H. Tagoshi ->
- #20 [New] Segment production (merged with #16?)
- Responsible:
- #21 [New] Data Category (at least CAT1) production
- Responsible:
- #22 [New] RRT contribution
- #15 [Cont'd] State Vector Definition
- LVK white paper
- Responsible:
- What TY thought
- All activities which are submitted as 2021 DET effort should be described on this documents.
- It will be based on white paper 2020 and KAGRA O4 readiness.
- Should clarify who will do each item (though personal name itself is not described on this documents).
Should show the rough timeline for R&D tasks.
- O3GK paper
- We need to continue to discuss with GEO people about GEO data analysis.
- IMC Commissioning
- Current IMC control signals on DGS are contaminated by circuit noise.
- Important thing is that contamination is occurred only on DGS signals or also on real analog signals
- Important channels
- K1:IMC-SERVO_{MIXER,FAST,SLOW}_DAQ_OUT_DQ
- K1:IMC-SERVO_NPRO_TEMP_BIAS_OUT_DQ
=> These channels will be added to SummaryPages
- O4 preparation
- CAGMon development
- no report
- lvalert test
- no report
- DET cluster
- no report
- CAGMon development
- KAGRA O4 readiness
20210510 (Mon.)
- Agenda
- KIW
- O3GK paper
- IMC Commissioning
- O4 preparation
- Minutes
- KIW
- Status of KAGRA DET (20 min) => T. Yamamoto - Status of LIGO Detchar (20 min) - Status of Virgo Detchar (20 min) - Contributed Talk 1 - one slot from KAGRA (15 min) => H. Yuzurihara - Contributed Talk 2 - CAGMon tools (15 min) - Contributed Talk 3 - KISTI's data transfer and computing (15 min)
- O3GK paper
- hveto process for GEO600 was done.
- IMC Commissioning
- [PMC] Acoustic coherence (20-200Hz)
- [IMC] Oscillation? (13-15MHz)
- O4 preparation
- no report
- lvalert
- no report
- DET cluster
- no report
- KIW
20210426 (Mon.)
- Agenda
- O3GK analysis
- O4 preparation
- IMC Commissioning
- Minutes
- O3GK analysis
- Omicron analysis of GEO was finished.
- Checking results is ongoing.
- We need to convert segment information on DQSEGDB to xml format.
- After checking omicron results, hveto analysis can be started.
- CAG Mon development
- CAG Mon was able to detect some correlation in O3GK data
- Prioritize is not done yet.
- prioritize can be decided by correlation coefficient value or total duration of correlation appearing
- We need more time to develop CAGMon (before we move to review process.).
- IMC Commissioning
- Microphone self noise is evaluating now.
- They will be installed in PSL room
- Paper writing person(s) from DET
- TY takes over from Kozakai-san.
- summary of lvalert test for LVK DET telecon
- O3GK analysis
20210419 (Mon.)
- Agenda
- O3GK analysis
O4 preparation (LV alert, SummaryPages, CAGMon)
- PMC/IMC noise hunting
- Minutes
- O3GK analysis
- GEO data analysis is started.
- Channel list is prepared by GEO people.
- PMC/IMC noise hunting
- Sound noise
- Frequency noise has coherence with microphone signal.
- Sound noise affected to DARM sensitivity during O3GK.
- Noise source and injection injection route should be investigated.
- Electrical noise(?)
- Accelerometer channel has coherence with frequency noise when PEM sensor turned OFF.
- Circuit noise level is small, but some electrical coherence may exist.
- Sound noise
- O3GK analysis
20210408 (Thu.)
- Agenda
- O3GK analysis
LV alert slide
- NDS2
- IMC Commissioning
- Minutes
- O3GK analysis
- hveto re-analysis for a part of data was done.
- round winner is same
- significant is slightly difference, (using same conf. triggers, version, etc)
- Next step is to check consistency of veto segment
- GEO data
- Analysis itself will be performed by KAGRA people
- Understanding results will be performed by GEO (+KAGRA) people
- hveto re-analysis for a part of data was done.
- O3GK analysis
20210401 (Thu.)
- Agenda
- Progress of hveto analysis
DetChar cluster
- lvalert
- RRT for O4
- Minutes
- Announcement
- New slot of DET meeting.
=> Pending because TY cannot know free time slot yet. (7 doodle poll is running...).
- hveto
- Omicron test analysis is successful.
- hveto doesn't run on m31 yet.
- We need to KISTI environment.
- lvalert
- Waiting response from LV people.
- We need realistic json format of GW alert.
- Only for the purpose of launching pipelines, dummy format is also used.
- The 1st version of VIS tab is already available (Only Type-A and guardians).
- Importing PSL tab from LIGO is already done.
- But there is many difference of channel name convention.
- New slot of DET meeting.
- Announcement
20210325 (Thu.)
- Agenda
- Progress of hveto analysis
- GEO data analysis
SummaryPage construction
- lvalert test
- PMC/IMC commissioning
- Meeting time in the next FY
- Minutes
- Progress of hveto analysis
- Consistency check still remains and it is solved yet.
- GEO data analysis
- Basic takeover is finished.
- Uchikata-san and Narikawa-san can start to use Omicron and hveto.
- But some error occurs on hveto@m31.
- We should fixed environmental problem.
SummaryPage construction
- The 1st version is already constructed on test directory.
We can apply it for product environment because current SummaryPage is not valid.
- lvalert test
- lvalert itself works well.
- Next step is receiving alert.
- We need to ask LIGO people about alert format etc.
- PMC/IMC commissioning
- Due to a lot of troubles, we haven't achieved IMC locked yet.
- We may start some kind of commissioning from Mid or Late of April.
- Meeting time in the next FY
- TY will circulate doodle poll.
- Progress of hveto analysis
20210317 (Thu.)
- O3GK paper
- hveto cross-check
- Checking Omicron parameter remains.
- Required re-run for whole two weeks.
- veto segment production
- Merging short segments is not required.
- GEO data analysis
- It can be done by someone form Tagoshi-san's group.
- hveto cross-check
- O4 preparation
- Kamioka cluster
- It's pending due to the recovery work of power outage.
Takeover about Omicron, hveto, GlitchPlot
- Takeover itself is done.
- TY is finding candidate person of each pipelines toward O4.
- Omega-scan test
- Installing on Kashiwa
- lvalert test
- It's works well on k1det1
SummaryPage update
- The 1st version of VIS page is constructed.
- It's being checked by Miyo-kun.
- IMC commissioning
- It is not locked yet because of some troubles.
- Kamioka cluster
20210225 (Thu.)
- Agenda
- Progress of O3GK paper
- O4 preparation
- Minutes
- Progress of O3GK paper
- Chihiro re-analysis with proper science segment for omicron triggers.
- A part of Kihyun's analysis is done.
- Cross-check can be done. But not start yet.
DetChar cluster in Kamioka
- OS installation for master node was done.
- Omega-scan test
- Installation for Kashiwa cluster was done.
- Error is occurred on gwdatafind.
- LVAlert
- Progress of O3GK paper
20210218 (Thu.)
- Agenda
- Progress of O3GK paper
- O3 data replay
- O4 preparation
- Minutes
- Progress of O3GK paper
- hveto conf is same
- segment is used as latest same science segments
- definition of cutting end of segments is difference.
- Channel list is used as on github's one.
Next step -> unifying cutting definition.
- Kihyun will re-run omicron with new segment cutting definition
- We need to merge veto segment from a lot of short ones to continuous one.
- O3 data replay
- Main purpose of O3 data replay is performing end-2-end test of low-latency pipelines (CAL, DET, DAS, etc).
- LV will use real O3 data.
- KAGRA provides simulated data (~80Mpc for BNS) because of too poor sensitivity of O3GK data.
- We may need to inject GWs on software with consistency with LV's real events.
- Frame work of software injection is already available.
- Updating VIS page.
- It will be closed to LIGO's one.
- LVAlert
- k1det1 can be used for test.
- Need personal account because we use personal DCC account for accessing GraceDB.
- Ask LV people how to get common account on next LVK DET meeting.
- Progress of O3GK paper
20210204 (Thu.)
- Agenda
- Progress of O3GK paper
- O3 data replay
- O4 requirement
- Minutes
- Progress of O3GK paper
Omicron trigger transfer: Kamioka -> KISTI, it is postponed.
- Young-Min asked KISTI administrator.
- GW-search triggers have not been served yet.
- O3 data replay
- K1:OPS-SIM_GAUSS1_IN1 (simulated error signal)
- K1:OPS-SIM_GAUSS1_OUT (simulated h(t) )
- gaussian noise as floor level
- Some spectral lines (cal lines, violin mode, power lines)
- Simulated glitches.
- K1:OPS-SIM_GAUSS3_OUT (simulated auxiliary channel)
- O4 requirement
- DQ state vector (Yamamoto)
- Providing on real-time model.
- Data Quality Report (Yuzurihara)
- First step is to use lvalert in order to receive GW alert from GraceDB.
- Transient Event validation (Kozakai)
- Basic idea is omicron+hveto (same as O3GK)
- Takeover should be done from Kozakai-san.
- Category veto (Yamamoto)
- At least CAT1 should be provided.
- We need to convert to veto-definer file format.
- Spectral lines investigation (Yokozawa)
- Listing of VIS-derived peak frequencies.
- DQ state vector (Yamamoto)
- Progress of O3GK paper
20210128 (Thu.)
- Agenda
- Report from Burst search
- Binary range evaluation with C20 offline h(t)
- Progress of O3GK paper
- Minutes
- Report from Burst search
- Binary range evaluation with C20 offline h(t)
- Multi-taper and Welch show similar results
- Bayesline result is slightly different from results by other two methods.
- Estimated values are enough for O3GK (search) paper.
- LVK review of this work is necessary for publishing results.
- Progress of O3GK paper
- Report from Burst search
20210121 (Thu.)
- Agenda
- Announcement
LVK DetChar call will be held (Jan. 25 19:00 JST, KST)
- Progress of O3GK paper
- CAGMon results
- O3 Data replay
- Announcement
- Minutes
- Progress of O3GK paper
- Some difference between Kihyun's and Chihiro's results.
- hveto setting should be tuned on conf file and re-run again.
- GW search results will be provided 1-2 months later (?).
- CAGMon results
- O3 data replay
- LV requested the simulated data instead of O3GK data as KAGRA's data.
- Auxiliary channels which has realistic coherence, coincidence etc are not available.
- All multi-channel analyses cannot work well in such situation.
- We need more discussion how do we join O3 data replay.
- Progress of O3GK paper
20210107 (Thu.)
- Agenda
- Progress of O3GK analysis
- O4 preparation
- Minutes
- Progress of O3GK analysis
- Analysis itself was finished.
- Results by Chihiro and Kihyun are now comparing.
=> Some conf. is still difference.
- At least after finishing paper work, omicron triggers should be shared on Kashiwa cluster for remote site people.
- O4 preparation
- Model update will be finished soon.
=> After model update, suspension commissioning will be started.
SummaryPages seems to be stopped.
=> Because of the channel name update by VIS model changes.
=> Current situation of real-time model is slightly complicated. ITMY: Old model, others: new model etc.
=> After finishing CRY measurements, all suspension models are unified.
- Model update will be finished soon.
- Progress of O3GK analysis