Differences between revisions 153 and 243 (spanning 90 versions)
Revision 153 as of 2021-01-07 14:19:51
Size: 22642
Comment:
Revision 243 as of 2021-08-16 12:46:12
Size: 30704
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
  * Meeting room: Zoom3 (https://zoom.us/j/5045179604)   * Meeting room: Zoom--(3 (https://zoom.us/j/5045179604))--
Line 9: Line 9:
=== 20210816 (Mon.) ===
  * Agenda
    * hveto analysis
    * O4 commissioning
    * KAGRA readiness
    * f2f meeting
  * Minutes
    * hveto analysis
      * various clustering
        * ([[https://gwdet.icrr.u-tokyo.ac.jp/~controls/hveto/manual/2020-04-15cl0.1/|0.1]], [[https://gwdet.icrr.u-tokyo.ac.jp/~controls/hveto/manual/2020-04-15cl0.2/|0.2]], [[https://gwdet.icrr.u-tokyo.ac.jp/~controls/hveto/manual/2020-04-15cl0.3/|0.3]], [[https://gwdet.icrr.u-tokyo.ac.jp/~controls/hveto/manual/2020-04-15cl0.4/|0.4]], [[https://gwdet.icrr.u-tokyo.ac.jp/~controls/hveto/manual/2020-04-15cl0.5/|0.5]], [[https://gwdet.icrr.u-tokyo.ac.jp/~controls/hveto/manual/2020-04-15cl0.6/|0.6]], [[https://gwdet.icrr.u-tokyo.ac.jp/~controls/hveto/manual/2020-04-15cl0.7/|0.7]], [[https://gwdet.icrr.u-tokyo.ac.jp/~controls/hveto/manual/2020-04-15cl0.8/|0.8]], [[https://gwdet.icrr.u-tokyo.ac.jp/~controls/hveto/manual/2020-04-15cl0.9/|0.9]], [[https://gwdet.icrr.u-tokyo.ac.jp/~controls/hveto/manual/2020-04-15cl1.0/|1.0]])
      * old results
        * ([[https://gwdet.icrr.u-tokyo.ac.jp/~controls/hveto/manual/2020-04-15cl_0_1v2/|0.1]], [[https://gwdet.icrr.u-tokyo.ac.jp/~controls/hveto/manual/2020-04-15_cl0_2/|0.2]])
    * O4 commissioning
      * FNC instability ([[https://klog.icrr.u-tokyo.ac.jp/osl/?r=17748|klog#17748]], [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=17865|klog#17865]])
        * We are not investigating the cause of instability of Michelson fringes of FNC (green laser)
        * Fiber coupling at PSL room is the most reasonable candidate.
        * We need to investigate temperature environment around green laser more detailed.
      * MN Photo sensor noise ([[https://klog.icrr.u-tokyo.ac.jp/osl/?r=17876|klog#17876]])
        * It doesn't seem to be not a real ground motion because upper stage isn't shaked.
        * We doubt the electrical noise now.
        * O4 readiness
    * O4 readiness
      * #15 [Cont'd] State Vector Definition
        * Responsible: '''T. Yamamoto -> T. Yamamoto'''
      * #16 + #20 Segment production with short latency
        * Responsible: '''K. Kokeyama -> S. Oshino, T. Yamamoto'''
      * #17 [Cont'd ] Status web pages (summary pages, [[https://monitor.ligo.org/gwstatus|gw status]], [[https://ldas-jobs.ligo.caltech.edu/~gwistat/gwistat/gwistat_p.html|gw istat]])
        * Responsible: '''S. Oshino -> S. Oshino'''
      * #18 [Cont'd] DQ event validation
        * Responsible: '''C. Kozakai -> K. Ueno, T. Yamamoto'''
      * #19 [Cont'd] GraceDB
        * Responsible: '''H. Tagoshi -> H. Tegoshi(?)'''
      * #21 [New] Data Category (at least CAT1) production
        * Responsible: '''!!!!!'''
      * #22 [New] RRT contribution
        * Responsible: '''H. Yuzurihara'''

=== 20210802 (Mon.) ===
  * Agenda:
    * hveto analysis
    * O4 commissioning and preparation
    * Hardware injection plan during O4
    * KAGRA O4 readiness
    * Proposal of O3GK DetChar paper [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13149|slide]]
  * Minutes:
    * hveto analysis
      * clustering test
        * Round winer doesn't change by clustering option.
        * Some kind of clustering is necessary but best parameter is not clear yet.
        * Kihyun will share the event time of clustered events.
        * We should check each event by spectrogram, Omega-scan, etc.
        * hveto with clustering will be also performed for 2 weeks day.
    * O4 commissioning
      * Omega-scan on Kashiwa has some error now. And
    * Hardware injection plan during O4
      * KAGRA CAL group is now gathering the plan of HWI during observations.
      * In LIGO case, in order to do HWI during obs., they need special and reasonable reasons.
      * KAGRA CAL also plan to adopt same procedures of the HWI management as LIGO.
      * If you have any HWI plan related to DET activities pls. share in DET telecons once.
      * We would like to discuss that the requested plans should be conducted during ER or obs.
    * O4 readiness
      * #15 [Cont'd] State Vector Definition
        * Responsible: '''T. Yamamoto -> T. Yamamoto'''
      * #16 + #20 Segment production with short latency
        * Responsible: '''K. Kokeyama -> S. Oshino, T. Yamamoto'''
      * #17 [Cont'd ] Status web pages (summary pages, [[https://monitor.ligo.org/gwstatus|gw status]], [[https://ldas-jobs.ligo.caltech.edu/~gwistat/gwistat/gwistat_p.html|gw istat]])
        * Responsible: '''S. Oshino -> S. Oshino'''
      * #18 [Cont'd] DQ event validation
        * Responsible: '''C. Kozakai -> T. Yamamoto'''
      * #19 [Cont'd] GraceDB
        * Responsible: '''H. Tagoshi -> H. Tegoshi(?)'''
      * #21 [New] Data Category (at least CAT1) production
        * Responsible: '''!!!!!'''
      * #22 [New] RRT contribution
        * Responsible: '''H. Yuzurihara'''

=== 20210726 (Mon.) ===
  * Agenda:
    * hveto analysis
    * O4 commissioning
    * O4 readiness
  * Minutes:
    * hveto analysis
      * Analyses with various clustering parameter are in progress. Kihyun will report in next telecon.
    * O4 commissioning
      * no updates
        * SummaryPages
        * lvalert
        * DET cluster
    * O4 readiness
      * It is preferable that the same person does not become multiple responsible person
      * As WP2021, DET tasks which is taken into account an effort follows readiness issues.

      * #15 [Cont'd] State Vector Definition
        * Responsible: '''T. Yamamoto -> T. Yamamoto'''
      * #16 + #20 Segment production with short latency
        * Responsible: '''K. Kokeyama -> S. Oshino, T. Yamamoto'''
      * #17 [Cont'd ] Status web pages (summary pages, [[https://monitor.ligo.org/gwstatus|gw status]], [[https://ldas-jobs.ligo.caltech.edu/~gwistat/gwistat/gwistat_p.html|gw istat]])
        * Responsible: '''S. Oshino -> S. Oshino'''
      * #18 [Cont'd] DQ event validation
        * Responsible: '''C. Kozakai -> !!!!!'''
      * #19 [Cont'd] GraceDB
        * Responsible: '''H. Tagoshi -> H. Tegoshi(?)'''
      * #21 [New] Data Category (at least CAT1) production
        * Responsible: '''!!!!!'''
      * #22 [New] RRT contribution
        * Responsible: '''H. Yuzurihara'''

=== 20210719 (Mon.) ===
  * Agenda:
    * hveto analysis
    * O4 commissioning
    * O4 readiness
  * Minutes
    * O4 commissioning
      * IMC-XARM commissioning
        * FNC control saturation [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=17464|klog17464]]
        * MC Oplev glitches and 120Hz line still exist (K1:VIS-MC{I,E,O}_TM_WIT_{P,Y})
        * Unstational noise excess on Green laser above 100Hz still exists (K1:ALS-
    * O4 readiness
      * #15 [Cont'd] State Vector Definition
        * Responsible: '''T. Yamamoto -> T. Yamamoto(?)'''
      * #16 + #20 Segment production with short latency
        * Responsible: '''K. Kokeyama -> S. Oshino, T. Yamamoto'''
      * #17 [Cont'd ] Status web pages (summary pages, [[https://monitor.ligo.org/gwstatus|gw status]], [[https://ldas-jobs.ligo.caltech.edu/~gwistat/gwistat/gwistat_p.html|gw istat]])
        * Responsible: '''S. Oshino -> S. Oshino(?)'''
      * #18 [Cont'd] DQ event validation
        * Responsible: '''C. Kozakai -> '''
      * #19 [Cont'd] GraceDB
        * Responsible: '''H. Tagoshi -> H. Tegoshi(?)'''
      * #21 [New] Data Category (at least CAT1) production
        * Responsible:
      * #22 [New] RRT contribution
        * Responsible: '''H. Yuzurihara(?)'''

=== 20210705 (Mon.) ===
  * Agenda:
    * O3GK paper
    * white paper
    * O4 commissioning
  * Minutes:
    * O3GK paper
      * Hveto was rerun with various parameters.
      * But there is no improvement in the veto efficiency.
    * white paper
      * Final version was released.
      * There was no additional comments from LV
      * [[https://git.ligo.org/operations/operations-white-paper-2021|LIGO Git]]
    * O4 commissioning
      * no report

-----
=== 20210628 (Mon.) ===
  * Agenda
    * O3GK paper
    * white paper
    * O4 commissioning & preparation
  * Minutes
    * O3GK paper
      * Uchikata-san and Narikawa-san got a consistent results with Kozakai-san's one.
      * hveto was performed with 0.1 duration.
      * There is no efficient channel/sensor for glitch veto.
        * Some parameters comes from LIGO's one.
        * So we need to find better parameters for KAGRA's data.
        * We also need prepare the more efficient sensors for O4 observing run
      * Kihyun is also performing the crosscheck. (1 or 2 weeks later he can report.)
    * white paper
      * [[https://git.ligo.org/operations/operations-white-paper-2021|Draft on LIGO Git]]
      * TY will be added a description about CAGMon until LVK DET call.
      * WP will be fixed at Ops call on 6/30 (?)
    * O4 commissioning & preparation
      * IMC commissioning
        * [Ongoing] Glitches on OpLev
          * Because of too many glitches, it's difficult to investigate one by one.
          * K1:VIS-MC{I,E,O}_TM_WIT_{P,Y} (MC Oplevs)
        * [Fixed] PLL noise coming from broken circuit [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=17188|klog17188]]
        * [Ongoing] PLL also has glitches (maybe) due to electrostatic discharge. [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=17239|klog17239]]
          * K1:ALS-{X,Y}_BEAT_ERR_OUT_DQ (error signal)
          * K1:ALS-{X,Y}_PLL_SLOW_DAQ_OUT_DQ (feedback signal)
        * [Ongoing] non-stational correlation between IMC/PLL and Microphone
          * K1:CAL-CS_PROC_IMC_FREQUENCY_DQ (calibrated frequency noise)
          * K1:IMC-SERVO_SLOW_DAQ_OUT_DQ (feedback signal of IMC)
          * K1:ALS-{X,Y}_PLL_SLOW_DAQ_OUT_DQ (feedback signal of PLL)
        * [Ongoing] station correlation between PMC and Microphone
          * Investigation about significance of coherence is ongoing.
-----
=== 20210621 (Mon.) ===
  * Agenda
    * O3GK paper
    * O4 whitepaper
    * O4 commissioning & preparation
  * Minutes
    * O4 white paper
      * The 1st version of the draft was submitted on June 17th.
        * [[https://git.ligo.org/operations/operations-white-paper-2021|LIGO Git]]
        * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12985|JGW-T-2112985]]
      * Final deadline is June 30th.
        * We can still do the miner fix.
    * O4 commissioning & preparation
      * IMC Commissioning
        * Omicron trigger searches for MC Oplevs were resumed ([[https://klog.icrr.u-tokyo.ac.jp/osl/?r=17150|klog#17150]]).
          * K1:VIS-MC{I,E,O}_TM_WIT_{P,Y} (oplev signals)
          * K1:VIS-IMMT{1,2}_TM_WIT_{P,Y} (as a reference of circuit noise)
        * SummaryPages
          * Glitch trigger tabs are added.
          * Loudest glitches can be seen on Pastavi (only internal ICRR network)
=== 20210614 (Mon.) ===
  * Agenda
    * O3GK paper
    * O4 whitepaper
    * O4 commissioning & preparation
  * Minutes
    * O3GK paper
      * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13009|plot]]
    * O4 white paper
      * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12985|draft]]
      * It's better to include PEM plans in commissions support section if exits.
    * O4 commissioning & preparation
      * IMC Commissioning
        * We have now four frequency noise signal (IMC, PMC, PLL-X, PLL-Y)
          * K1:CAL-CS_PROC_IMC_FREQUENCY_DQ (calibrated IMC as MHz)
          * K1:PSL-PMC_PZT_HV_MON_OUT_DQ (calibrated PMC as Volt at PZT amp.)
          * K1:ALS-X_PLL_SLOW_DAQ_OUT_DQ (calibrated Green-X as Volt at PZT)
          * K1:ALS-X_PLL_SLOW_DAQ_OUT_DQ (calibrated Green-Y as Volt at PZT)
        * PMC (always) and others (sometimes) have correlation with microphone signal
          * K1:PEM-MIC_PSL_TABLE_PSL1_Z_OUT_DQ (calibrated as Pascal)
        * OpLev signals have some glitches and are investigated now.
          * K1:VIS-MC{I,E,O}_TM_WIT_{P,Y}
          * Real SUS motion?, electrical glitches?, scattered light? etc.
      * SummaryPages
        * Updated PSL, PEM tabs.
          * PLL signals are available.

-----

=== 20210607 (Mon.) ===
  * Agenda
    * O3GK paper
    * O4 whitepaper
    * O4 commissioning & preparation
  * Minutes
    * O3GK paper
      * Preparing some plots about histgram and glitch rate of both KAGRA and GEO
    * O4 whitepaper
      * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12985|draft]]
    * O4 commissioning & preparation
      * CAGMon development
        * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12986|slide]]
          * Found correlation between wind power and BNS ranges
          * OMMT1 doesn't (maybe) have Oplev. It's better to confirm what kind of sensors were coneected.
          * BNS range channel has ~2min latency. It may become better results by considering the latency in BNS range calculation.
      * IMC commissioning
        * Noise investigation ([[https://klog.icrr.u-tokyo.ac.jp/osl/?r=16928|klog]])
        * Correlation between IMC and MIC sometimes increase in spite of no change in microphone spectra.
        * Coupling coefficients may be changed in time.
      * Cross check of hveto results.
        * Kihyun's (KISTI) and Chihiro's (Kamioka) results were confirmed as consistent each other.
        * For O4 observing run, Kashiwa environment is also important for increasing machine power.
        * Requirement of machine power should be estimated soon (but it's strongly depends on the situation of O4 joining)
        * We plan to use 100-200 aux. channels and it's very helpful to analyze them at the same time for each pipeline.
      * lvalert
        * no report
      * SummaryPage
        * no report
      * DetChar cluster
        * no report


-----
=== 20210531 (Mon.) ===
  * Agenda
    * O3GK paper
    * O4 readiness
    * O4 commissioning & preparation
  * Minutes
    * O3GK paper
      * Comparison with Uchikata-san's and GEO people's results is ongoing.
      * Kihyun is performing validation check of his results => He will report in next or 2 weeks later telecon.
    * O4 readiness
      * #15 [Cont'd] State Vector Definition
        * Responsible: '''T. Yamamoto -> T. Yamamoto(?)'''
      * #16 + #20 Segment production with short latency
        * Responsible: '''K. Kokeyama -> '''
      * #17 [Cont'd ] Status web pages (summary pages, [[https://monitor.ligo.org/gwstatus|gw status]], [[https://ldas-jobs.ligo.caltech.edu/~gwistat/gwistat/gwistat_p.html|gw istat]])
        * Responsible: '''S. Oshino -> S. Oshino(?)'''
      * #18 [Cont'd] DQ event validation
        * Responsible: '''C. Kozakai -> '''
      * #19 [Cont'd] GraceDB
        * Responsible: '''H. Tagoshi -> H. Tegoshi(?)'''
      * #21 [New] Data Category (at least CAT1) production
        * Responsible:
      * #22 [New] RRT contribution
        * Responsible: '''H. Yuzurihara(?)'''
    * white paper 2021
      * No progress in draft.
      * Task list will be based on O4 readiness.
        * If there is another task plan, please let TY know (maybe CAGMon, ICA, pastavi development etc.).
    * O4 commissioning & preparation
      * LVAlert
        * no report
      * SummaryPages update
        * no report
      * DET cluster
        * no report
      * CAGMon development
        * no report

-----
=== 20210524 (Mon.) ===
  * Agenda
    * O3GK paper
    * O4 commissioning & preparation
    * O4 readiness
  * Minutes
    * O3GK paper
      * Discussion with GEO people is ongoing
    * O4 commissioning & preparation
      * MC circuit noise hunting
        * Current spectrum is too clean 1/f noise.
          * Frequency noise should shows 1/f spectrum.
          * But we haven't checked it's a real frequency noise (circuit noise etc.).
          * Nakano-kun said current spectrum is consistent with past measurements.
      * sound correlation
        * Investigating sound correlation with three microphones. [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12937|slide]]
      * lvalert test
        * no report
      * DET cluster
        * no report
      * SummaryPages
        * added for some IMC signals and it work well.
    * White paper 2021
      * [[https://git.ligo.org/operations/operations-white-paper-2021|2021]]
      * [[https://git.ligo.org/operations/operations-white-paper-2020|2020]]

=== 20210517 (Mon.) ===
  * Agenda
    * KAGRA O4 readiness
    * LVK white paper 2021
    * O3GK paper
    * IMC commissioning
  * Minutes
    * KAGRA O4 readiness
      * #15 [Cont'd] State Vector Definition
        * Responsible: '''T. Yamamoto -> '''
      * #16 [Cont'd] DQSEGDB capability
        * Responsible: '''K. Kokeyama -> '''
      * #17 [Cont'd ] Status web pages (summary pages, [[https://monitor.ligo.org/gwstatus|gw status]], [[https://ldas-jobs.ligo.caltech.edu/~gwistat/gwistat/gwistat_p.html|gw istat]])
        * Responsible: '''S. Oshino -> '''
      * #18 [Cont'd] DQ event validation
        * Responsible: '''C. Kozakai -> '''
      * #19 [Cont'd] GraceDB
        * Responsible: '''H. Tagoshi -> '''
      * #20 [New] Segment production (merged with #16?)
        * Responsible:
      * #21 [New] Data Category (at least CAT1) production
        * Responsible:
      * #22 [New] RRT contribution
    * LVK white paper
      * Responsible:
      * What TY thought
        * All activities which are submitted as 2021 DET effort should be described on this documents.
        * It will be based on white paper 2020 and KAGRA O4 readiness.
        * Should clarify who will do each item (though personal name itself is not described on this documents).
        * Should show the rough timeline for R&D tasks.
    * O3GK paper
      * We need to continue to discuss with GEO people about GEO data analysis.
    * IMC Commissioning
      * Current IMC control signals on DGS are contaminated by circuit noise.
      * Important thing is that contamination is occurred only on DGS signals or also on real analog signals
      * Important channels
        * K1:IMC-SERVO_{MIXER,FAST,SLOW}_DAQ_OUT_DQ
        * K1:IMC-SERVO_NPRO_TEMP_BIAS_OUT_DQ
        * => These channels will be added to SummaryPages
    * O4 preparation
      * CAGMon development
        * no report
      * lvalert test
        * no report
      * DET cluster
        * no report

=== 20210510 (Mon.) ===
  * Agenda
    * KIW
    * O3GK paper
    * IMC Commissioning
    * O4 preparation
  * Minutes
    * KIW
    {{{
- Status of KAGRA DET (20 min) => T. Yamamoto
- Status of LIGO Detchar (20 min)
- Status of Virgo Detchar (20 min)
- Contributed Talk 1 - one slot from KAGRA (15 min) => H. Yuzurihara
- Contributed Talk 2 - CAGMon tools (15 min)
- Contributed Talk 3 - KISTI's data transfer and computing (15 min)
    }}}
    * O3GK paper
      * hveto process for GEO600 was done.
    * IMC Commissioning
      * [PMC] Acoustic coherence (20-200Hz)
      * [IMC] Oscillation? (13-15MHz)
    * O4 preparation
      * SummaryPages
        * no report
      * lvalert
        * no report
      * DET cluster
        * no report

=== 20210426 (Mon.) ===
  * Agenda
    * O3GK analysis
    * O4 preparation
    * IMC Commissioning
  * Minutes
    * O3GK analysis
      * Omicron analysis of GEO was finished.
      * Checking results is ongoing.
      * We need to convert segment information on DQSEGDB to xml format.
      * After checking omicron results, hveto analysis can be started.
    * CAG Mon development
      * CAG Mon was able to detect some correlation in O3GK data
      * Prioritize is not done yet.
        * prioritize can be decided by correlation coefficient value or total duration of correlation appearing
      * We need more time to develop CAGMon (before we move to review process.).
    * IMC Commissioning
      * Microphone self noise is evaluating now.
      * They will be installed in PSL room
    * Paper writing person(s) from DET
      * TY takes over from Kozakai-san.
    * summary of lvalert test for LVK DET telecon

-----
=== 20210419 (Mon.) ===
  * Agenda
    * O3GK analysis
    * O4 preparation (LV alert, SummaryPages, CAGMon)
    * PMC/IMC noise hunting
  * Minutes
    * O3GK analysis
      * GEO data analysis is started.
      * Channel list is prepared by GEO people.
    * PMC/IMC noise hunting
      * Sound noise
        * Frequency noise has coherence with microphone signal.
        * Sound noise affected to DARM sensitivity during O3GK.
        * Noise source and injection injection route should be investigated.
      * Electrical noise(?)
        * Accelerometer channel has coherence with frequency noise when PEM sensor turned OFF.
        * Circuit noise level is small, but some electrical coherence may exist.

=== 20210408 (Thu.) ===
  * Agenda
    * O3GK analysis
    * SummaryPage
    * LV alert [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12760|slide]]
    * NDS2
    * IMC Commissioning
  * Minutes
    * O3GK analysis
      * hveto re-analysis for a part of data was done.
        * round winner is same
        * significant is slightly difference, (using same conf. triggers, version, etc)
        * Next step is to check consistency of veto segment
      * GEO data
        * Analysis itself will be performed by KAGRA people
        * Understanding results will be performed by GEO (+KAGRA) people
        
-----
=== 20210401 (Thu.) ===
  * Agenda
    * Progress of hveto analysis
    * DetChar cluster
    * lvalert
    * SummaryPages
    * RRT for O4
  * Minutes
    * Announcement
      * New slot of DET meeting.
        * => Pending because TY cannot know free time slot yet. (7 doodle poll is running...).
      * hveto
        * Omicron test analysis is successful.
        * hveto doesn't run on m31 yet.
        * We need to KISTI environment.
      * lvalert
        * Waiting response from LV people.
        * We need realistic json format of GW alert.
        * Only for the purpose of launching pipelines, dummy format is also used.
      * SummaryPages
        * The 1st version of VIS tab is already available (Only Type-A and guardians).
        * Importing PSL tab from LIGO is already done.
        * But there is many difference of channel name convention.
        

-----
=== 20210325 (Thu.) ===
  * Agenda
    * Progress of hveto analysis
    * GEO data analysis
    * SummaryPage construction
    * lvalert test
    * PMC/IMC commissioning
    * Meeting time in the next FY
  * Minutes
    * Progress of hveto analysis
      * Consistency check still remains and it is solved yet.
    * GEO data analysis
      * Basic takeover is finished.
      * Uchikata-san and Narikawa-san can start to use Omicron and hveto.
      * But some error occurs on hveto@m31.
      * We should fixed environmental problem.
    * SummaryPage construction
      * The 1st version is already constructed on test directory.
      * We can apply it for product environment because current SummaryPage is not valid.
    * lvalert test
      * lvalert itself works well.
      * Next step is receiving alert.
      * We need to ask LIGO people about alert format etc.
    * PMC/IMC commissioning
      * Due to a lot of troubles, we haven't achieved IMC locked yet.
      * We may start some kind of commissioning from Mid or Late of April.
    * Meeting time in the next FY
      * TY will circulate doodle poll.

=== 20210317 (Thu.) ===
  * O3GK paper
    * hveto cross-check
      * Checking Omicron parameter remains.
      * Required re-run for whole two weeks.
    * veto segment production
      * Merging short segments is not required.
    * GEO data analysis
      * It can be done by someone form Tagoshi-san's group.
  * O4 preparation
    * Kamioka cluster
      * It's pending due to the recovery work of power outage.
    * Takeover about Omicron, hveto, GlitchPlot
      * Takeover itself is done.
      * TY is finding candidate person of each pipelines toward O4.
    * Omega-scan test
      * Installing on Kashiwa
    * lvalert test
      * It's works well on k1det1
    * SummaryPage update
      * The 1st version of VIS page is constructed.
      * It's being checked by Miyo-kun.
    * IMC commissioning
      * It is not locked yet because of some troubles.

=== 20210225 (Thu.) ===
  * Agenda
    * Progress of O3GK paper
    * O4 preparation
  * Minutes
    * Progress of O3GK paper
      * Chihiro re-analysis with proper science segment for omicron triggers.
      * A part of Kihyun's analysis is done.
      * Cross-check can be done. But not start yet.
    * DetChar cluster in Kamioka
      * http://klog.icrr.u-tokyo.ac.jp/osl/?r=16082
      * OS installation for master node was done.
    * Omega-scan test
      * Installation for Kashiwa cluster was done.
      * Error is occurred on gwdatafind.
    * SummaryPages
    * LVAlert

-----
=== 20210218 (Thu.) ===
  * Agenda
    * Progress of O3GK paper
    * O3 data replay
    * O4 preparation
  * Minutes
    * Progress of O3GK paper
      * hveto conf is same
      * segment is used as latest same science segments
      * definition of cutting end of segments is difference.
      * Channel list is used as on github's one.
      * Next step -> unifying cutting definition.
        * Kihyun will re-run omicron with new segment cutting definition
      * We need to merge veto segment from a lot of short ones to continuous one.
    * O3 data replay
      * Main purpose of O3 data replay is performing end-2-end test of low-latency pipelines (CAL, DET, DAS, etc).
      * LV will use real O3 data.
      * KAGRA provides simulated data (~80Mpc for BNS) because of too poor sensitivity of O3GK data.
      * We may need to inject GWs on software with consistency with LV's real events.
      * Frame work of software injection is already available.
    * SummaryPage
      * Updating VIS page.
      * It will be closed to LIGO's one.
    * LVAlert
      * k1det1 can be used for test.
      * Need personal account because we use personal DCC account for accessing GraceDB.
        * Ask LV people how to get common account on next LVK DET meeting.
    

-----

=== 20210204 (Thu.) ===
  * Agenda
    * Progress of O3GK paper
    * O3 data replay
    * O4 requirement
  * Minutes
    * Progress of O3GK paper
      * Omicron trigger transfer: Kamioka -> KISTI, it is postponed.
        * Young-Min asked KISTI administrator.
      * GW-search triggers have not been served yet.
    * O3 data replay
      * K1:OPS-SIM_GAUSS1_IN1 (simulated error signal)
      * K1:OPS-SIM_GAUSS1_OUT (simulated h(t) )
        * gaussian noise as floor level
        * Some spectral lines (cal lines, violin mode, power lines)
        * Simulated glitches.
      * K1:OPS-SIM_GAUSS3_OUT (simulated auxiliary channel)
    * O4 requirement
      * DQ state vector (Yamamoto)
        * Providing on real-time model.
      * Data Quality Report (Yuzurihara)
        * First step is to use lvalert in order to receive GW alert from GraceDB.
      * Transient Event validation (Kozakai)
        * Basic idea is omicron+hveto (same as O3GK)
        * Takeover should be done from Kozakai-san.
      * Category veto (Yamamoto)
        * At least CAT1 should be provided.
        * We need to convert to veto-definer file format.
      * Spectral lines investigation (Yokozawa)
        * Listing of VIS-derived peak frequencies.
-----
=== 20210128 (Thu.) ===
  * Agenda
    * Report from Burst search
    * Binary range evaluation with C20 offline h(t)
    * Progress of O3GK paper
  * Minutes
    * Report from Burst search
      *
    * Binary range evaluation with C20 offline h(t)
      * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12499|slide]]
      * Multi-taper and Welch show similar results
      * Bayesline result is slightly different from results by other two methods.
      * Estimated values are enough for O3GK (search) paper.
      * LVK review of this work is necessary for publishing results.
    * Progress of O3GK paper
      *


=== 20210121 (Thu.) ===
  * Agenda
    * Announcement
      * LVK DetChar call will be held (Jan. 25 19:00 JST, KST)
    * Progress of O3GK paper
    * CAGMon results
    * O3 Data replay
  * Minutes
    * Progress of O3GK paper
      * Some difference between Kihyun's and Chihiro's results.
      * hveto setting should be tuned on conf file and re-run again.
      * GW search results will be provided 1-2 months later (?).
    * CAGMon results
      * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12481|slide]]
    * O3 data replay
      * LV requested the simulated data instead of O3GK data as KAGRA's data.
      * Auxiliary channels which has realistic coherence, coincidence etc are not available.
      * All multi-channel analyses cannot work well in such situation.
      * We need more discussion how do we join O3 data replay.

Line 27: Line 697:

-----
=== 20201224 (Thu.) ===
  * Agenda
    * Progress of O3GK analysis
    * Plan of O3 data replay
  * Minutes
    * hveto with C20
      * Configuration was changed.
      * Analysis will be finished in this end of year.

=== 20201203 (Thu.) ===
  * Agenda
    * Announcements
      * Recovery of SummaryPage
      * DetChar O4 requirement document
    * Progress of O3GK analysis (incl. GEO data)
    * LV(K) O3 data replay
    * BNS range of O3GK with C20 h(t)
  * Minutes
    * Progress of O3GK analysis
      * How should we do until releasing cWB triggers?
      * => ask to Man-san or Hayama-san.
    * GEO data analysis
      * There is no enough man-power for analyzing GEO data.
      * GEO DetChar frames should be transferred to Kashiwa.
      * => discuss with James.
    * LV(K) O3 data replay
      * LV plans to perform data replay activity for the end-2
    * BNS range of O3GK with C20 h(t)
      *

=== 20201126 (Thu.) ===
  * Agenda
    * O3GK analysis
      * hveto progress (cWB situation)
      * Glitch catalogue
    * O4 preparation
      * SummaryPage problem
      * New computers in Kashiwa
    * Meetings
  * Minutes
    * hveto progress (cWB situation)
      * waiting cWB triggers now.
      * Test with past CBC triggers will be performed.
    * Glitch catalogue
      * The 1st step is to see the bandbassed h(t) around Omicron triggers.
      * Cutoff frequencies of bandpass filter can be decided by Omicron frequency info.
    * SummaryPage problem
      * NFS trouble occurs and it is not available.
      * Only Kamioka local network, k1sum0 is available instead of gwdet.icrr....
    * f2f
      * Maybe one talk in O3GK session.
    * KIW7
      * No talk
    * JPS
      * No talk
=== 20201119 (Thu.) ===
  * Agenda
    * C20 offline h(t)
    * O4 preparation
    * f2f/KIW7/JPS
  * Minutes
    * C20 offline h(t)
      * hveto analysis is performed with Omicron triggers of h(t) and aux. channels.
        * cWB search is not finished yet.
      * Data transfer to KISTI is performed with DMG software.
    * O4 preparation
      * SummaryPage is now stopped for the maintenance and updates.
      * New DetChar computers are preparing in Kashiwa
        * Procuring itself is finished until end of year.
      * Additional disk storage is needed in KISTI as Tier-1 site.
        * 600-800TB/yr is required to store the full data of O4 (in 1-year obs. case.)
        * Actual past results and data-access frequency are required to submit a proposal.
    * f2f
      * O3GK session: 1 slot(?) [progress report of O3GK analysis]
      * parallel session: No talk(?)
      * poster session: No talk(?)
    * KIW7
      * No talk(?)
    * JPS
      * No talk(?)
    * Monthly telecon with LV
      * held on last Monday in every month.
      * start from Nov. 30th or Jan. 25th
      * Dec 28th will be cancelled due to the end-of-year holidays.

=== 20201111 (Thu.) ===
  * Agenda
    * C20 offline h(t)
    * O4 data release schedule
    * f2f/KIW7
  * Minutes
    * C20 offline h(t)
      * Comment from DAC meeting:
        * Burst group can be provide GW event trigger list (schedule is not decided yet.)
        * Detail DQ info. around GRB events is very useful.
      * Data transfer on DET server
        * Done.
      * Omicron trigger generation for C20 h(t)
        * Generation itself was finished
        * There is no error on Omicron process.
      * Data transfer on KISTI cluster
        * Sangwook will do.
        * After the data transfer, Kihyun can resume his analysis with C20.
    * O4 data release schedule
        * [[KAGRA/Subgroups/DET/DataRlease|O4 data release schedule]]

=== 20201103 (Thu.) ===
  * Agenda
    * C20 offline h(t)
    * O4 data release schedule
  * Minutes
    * C20 offline h(t)
      * Data should be copied to Kamioka server.
      * Glitch trigger search by Omicron
        * After data copy, it will be resumed.
      * hveto needs GW trigger search
        * We can demonstrate with omicron trigger of h(t).
        * After GW search triggers are available it will be resumed.
      * Data transfer to KISTI
        * discuss with DAS people on the next KGWG meeting
    * O4 data release schedule
      * Dead line: December ..
      * Please fill the requested time to link below.
        * http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/DET/DataRlease
=== 20201022 (Thu.) ===
  * Agenda
    * Segment of O3GK
    * Documentation about O3GK info.
    * SummaryPage for O4 installation
  * Minutes


=== 20201008 (Thu.) ===
  * Agenda
    * Planned power outage
    * hveto bug
  * Minutes
    * Planned power outage
      * All jobs on k1det must be stopped until 10/13 morning.
    * hveto bug
      * Code reading is in progress by Chihiro.
        * There is no response from LIGO people.
      * Analysis of Apr 8th - 21st data is on going.
    * Segment update
      * Discussion with Robert is resumed.
      * Upload method is 'pull' from LIGO side.
      * They already know the path to the segment files and types of segment file.
      * Remains tasks are schedule and segment name on DQSEGDB.
    * Announcement
      * 22:00 (JST/KST) tonight, LVK operation workshop will be held.
=== 20201001 (Thu.) ===
  * Agenda
    * Planned power outage (10/14)
  * Minutes
    * Planned power outage (10/14)
      * k1det will be stopped until 10/13 morning.
      * They will come back online after 10/15.
=== 20200924 (Thu.) ===
  * Agenda
    * Segment update
    * hveto problem
  * Minutes
    * Segment update
      * All 9 segment info. were fixed.
      * They had already copied to Kashiwa and Kamioka.
      * They should be copied also KISTI.
      * TY will contact to Robert again.
      * After then, segments will be uploaded to DQSEGDB.
    * hveto problem
      * Problem is cased by hveto
      * Some trigger files are sent to LDAS.
      * Investigation on LDAS is ongoing.
      * Conf. file on Kamioka should be share to KISTI.
=== 20200911 (Thu.) ===
  * Agenda
    * Progress of O3GK analysis
    * Duty cycle evaluation during O3GK
    * Lock loss study
    * O3GK DetChar talk in LVK meeting
  * Minuets
    * Progress of O3GK analysis
      * Investigating strange behavior of hveto
      * On KISTI cluster, it works well.
        * Cross check of Chihiro's result and Kihyun's one is ongoing.
        * Round winner channel changes day by day. (Is it consistent with past results?)
        * K1:ASC-AS*** is not maintained well.
        * Both Safe and Unsafe channel list should be used as same ones.
    * Duty cycle evaluation during O3GK
      * 54% duty factor (2 weeks average)
      * BNS range, 500kpc (2 weeks average, cal mistakes is already revised.)
      * Only last a few days, BPC lines are enabled.
    * Lock loss study
      * BLRMS has some time delay.
      * LOCKED segments should be used ins
    * O3GK DetChar talk in LVK meeting
      * topics
        * Achievement of KAGRA readiness
        * Progress of concrete analysis
        * BNS ranges, duty factor as the overview.
     => Yamamoto, Kozakai
=== 20200903 (Thu.) ===
  * Agenda
    * trigger generation
    * hveto analysis
  * Minutes
    * trigger generation
      * Analysis is finished.
      * Two channels have some problem.
      * The version problem of gwpy occurs on KISTI.
      * Latest channel list should be shared on GitHub.
    * hveto analysis
      * Omicron triggers should be shared with LIGO people. (Kamioka -> LIGO) => Kozakai-san will contact to Alex.
      * hveto works well on KISTI. => Kihyun will continue to analysis.
    

=== 20200827 (Thu.) ===
  * Agenda
    * Segment Update
    * KAGRA data analysis
    * GEO data analysis
  * Minutes
    * Segment Update
      * Broken frames period are removed from new science segments (K1-GRD_SCIENCE_MODE_AND_DAQ_STATUS_OK)
      * Broken frames period as provided a new segments definition (K1-DAQ_STATUS_BAD)
      * They are store in detchar@m31:Segments/
      * Obsolete segments are still generated (???).
    * KAGRA data analysis
      * Some PEM sensors are added to the channel list for omicron analysis. => (until next week.)
      * When is the location of each sensor fixed? => At least around Feb. (also for PORTABLE)
      * Disk full problem and script errors are occur KISTI
      * hveto problem occurs (Apr 15. UTC)
    * GEO data analysis

=== 20200806 (Thu.) ===
  * Agenda
    * f2f meeting
    * progress of O3GK
  * Minutes
    * f2f meeting
      * We have parallel session. (need to prepare two talks for Experiment and Data analysis.)
      * Experiment -> Yamamoto, Data Analysis -> Kozakai? Kihyun also considers an oral or a poster session.
    * progress of O3GK
      * Reconsidering Safe/Unsafe channels is on going.
      * We need to re-analyze for some channels and some segments by Omicron.
      * Cross check of KAGRA data analysis can be done by Kihyun.
      * GEO data transfer to KISTI cluster is almost done.
      * Kihyun can continue to analyze the GEO data.
      * We need to do cross check of the results of GEO data analysis.

=== 20200730 (Thu.) ===
  * Agenda
    * Safe/Unsafe channel ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11854|slide]])

=== 20200723 (Thu.) ===
  * Cancelled

=== 20200702 (Thu.) ===
  * Agenda
    * Safe/Unsafe channel
    * Omicron troubles
    * GEO data analysis

=== 20200625 (Thu.) ===
  * Agenda
    * Broken frames
    * O3GK
      * trigger generation
      * hveto
      * CAGMon
  * Minutes
    * Broken frames
      * Totally 26 broken frames. (Science: 4, Locked: 4, Unlocked: 18)
      * TY will remove 32-second long data which is in broken frames from science mode segments by manually.
      * After then, the segment script will be updated for taking into account broken frames.
    * O3GK
      * trigger generation
        * Some runtime error occurs on the Kamioka server.
        * Trigger generation test is started with KAGRA data on the KISTI server.
        * GEO data transfer to the KISTI server is not finished yet.
      * hveto
        * Test with short time data is ongoing
      * CAGMon
        * Analysis with Apr. observation data is already started.
        * Used Channel list is same as YuzuSummary's one.
        * Safe/Unsefe channel list is also required --> will be discussed next week.

=== 20200618 (Thu.) ===
  * Agenda
    * LVK operations white paper
      * task list
      * introduction of ICA
      * Current progress of CAGMON


=== 20200610 (Thu.) ===
  * Agenda
    * DAQ error during O3GK ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11751|JGW-G2011751]])
    * KAGRA data analysis (Omicron/hveto)
    * GEO data analysis (Omicron/CAGMon)
  * Minutes
    * DAQ error during O3GK
      * Ueno-san found file reading error with following frames.
        {{{
K-K1_C-1270444416-32.gwf 2020-04-09 14:13:18 (JST)
K-K1_C-1270570496-32.gwf 2020-04-11 01:14:38 (JST)
K-K1_C-1270577376-32.gwf 2020-04-11 03:09:18 (JST)
K-K1_C-1270680672-32.gwf 2020-04-12 07:50:54 (JST)
K-K1_C-1271033536-32.gwf 2020-04-16 09:51:58 (JST)
K-K1_C-1271174912-32.gwf 2020-04-18 01:08:14 (JST)
K-K1_C-1271226144-32.gwf 2020-04-18 15:22:06 (JST)
K-K1_C-1271440736-32.gwf 2020-04-21 02:58:38 (JST)
        }}}
    * KAGRA data analysis
      * Omicron search around GRB was finished.
      * Whole 2-weeks analysis is now being performed.
      * It's better to remove some channels from unsafe channel list.
      * We should test hveto with some channel lists.
=== 20200604 (Thu.) ===
  * Agenda
    * LVK white paper
    * O3GK analysis
  * Minutes
    * LVK white paper
      * Operations white paper
        {{{
2. Observatory Operations
3. Detector Commissioning
4. Calibration
5. Detector Characterization
6. Computing and software
        }}}
      * Observational Science white paper
        {{{
1.1 Burst
1.2 CBC
1.3 CW
1.4 Stochastic
2 Burst
3 CBC
4 CW
5 Stochastic
6 Burst+CBC+DetChar Joint Activity Plans
7 Burst+CBC Joint Activity Plans
8 Burst+Stochastic Joint Activity Plans
9 Stochastic+CBC
10 Stochastic+Detchar
        }}}
=== 20200521 (Thu.) ===
  * Agenda
    * Talk plans for JPS meeting
    * PTEP paper
    * O3GK analysis
  * Minutes
    * Talk plans for JPS meeting
      * TY will give a DET summary talk.
      * Deadline 4th June.
    * PTEP paper
      * Writing draft was finished.
      * After checking the whole, draft will be submitted to CPC.
    * O3GK analysis
      * Segment information is being reprovided as Science, Locked , Unlock, and OMC Overflow.
      * Omicron triggers will be regenerated with new segment information.
      * hveto will be applied after generating Omicron triggers with new segment and configurations.
      * O3GK data is available on the KISTI cluster.
      * Bug fix is required for using CAGMon.

=== LVK 20200518/19 (Mon./Tue.) ===
  * [[https://wiki.ligo.org/DetChar/Telecon20200518|Agenda]]


=== 20200514 (Thu.) ===
  * Agenda
    * PTEP paper
    * Regenerate segment information
    * Regenerate omicron triggers
    * SummaryPage stability
    * Activities on KISTI
  * Minutes


=== 20200507 (Thu.) ===
  * O3GK DetChar analysis
    * KAGRA DQ flags/segments
    * Glitch searches
    * Burst trigger veto
    * GEO DQ flags/segments

  * Minutes
    * KAGRA DQ flags/segments
      * Reproducing OMC overflow segments
      * Overflow segments are provided as separately from Science mode
      * 'SegmentList_locked_UTC_***.txt' is expired.
      * Reproduced segments information should be uploaded to DQSEGDB
    * Glitch searches
      * Omicron configuration should be reoconsidered
      * Triggers will be regenerated with new configurations
      * Discussion of configuration (chunk-size, intervals...) is ongoing.
    * Burst trigger veto
      * All cWB triggers are not vetoed by hveto
      * cWB has some problems(?)
      * Omicron parameter should be considered again.
    * GEO DQ flags/segments
      * GEO people are now providing new frames including both the strain signal and important auxiliary channels.
      * GEO frames will be transferred form CIT to Kashiwa (and Kashiwa to KISTI?)
      * Omicron can be used on KISTI cluster
      * We need the information about the amount of data.
      * CAGMon results will be also available in near future.

=== 20200423 (Thu.) ===
  * Irregular meeting / Agenda:
    * 17:00-, zoom 2 https://zoom.us/j/6676627462
    * Participants: Kozakai, Ochino, Kokeyama
==== Minutes ====
    * How to manage a DQ check for event alerts
      * Shall we make a proper data quality report for each event? => after collecting information we will make a report and put on JGW doc
      * Does ligo have the template to be sent to segdb? => to be checked
      * For now, we make a dedicated wiki page
         * list a specific check list: For GRB200415A, check resG condition, check if OMC PD A was overflow or not
      * Share Detchar info with CAL, BURST, DMG
    * How to organize RRT for the next obs


=== 20200416 (Thu.) ===
  * Agenda:
    * Run status
    * DQ Shift
    * KISTI activities

=== 20200402 (Thu.) ===
  * Agenda:
    * File server status
      * SummaryPage
      * Omicron trigger generation
      * Segment Information
      * KISTI results capability
    * Observing run
      * GlitchPlot for burst analysis
      * DetChar DQ shift
    * Update for O4 plan

=== 20200326 (Thu.) ===
  * Agenda:
    * Commissioning situation
      * Commissioning test will be continued until Mar. 31st
      * During Apr. 1st to 7th, engineering run will be performed.
      * After Apr. 7th, we have a two weeks observing run (only KAGRA)
      * If LIGO, and Virgo will come back to observing run, we will aim to join O3.
    * SummaryPage (RAID trouble)
      * File server has a disk problem.
      * RAID system is now being rebuilt. (It will be finished today's evening.)
    * GlitchPlot for Burst evnet triggers
      * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11571|JGW-G2011571]]
    * DetChar pipelines on KISTI
      * Code update of CAGMon
      *

=== 20200312 (Thu.) ===
  * Agenda:
    * Current status of site (commissioning) activities
      * Commissioning break was started from 10th Mar. It continues until 24th Mar.
      * Joinning O3 should be discussed on JRPC meeting on 26th Mar.(?).
    * Update of DQ state vector
      * Science mode during 25th Feb. - 10th Mar. didn't include SDF flags.
      * I updated to contain the SDF flags as the one of the condition of the Science mode.
    * Automation plan of GlitchPlot for GW event alert
      * We plan to move GlitchPlot from ICRR cluster to Kamioka computers.
      * Requirement:
        * Disk: 100MB/event
        * CPU: ???
    * Data transfer to KISTI
      * ER on Dec. data was transferred.
      * Many tools is already available on KISTI cluster.
    * Announce about LVK session
      * We plan to have DetChar telecons instead of LVK meeting.
      * TY circulate concrete date and time on ML after deciding.

=== 20200305 (Thu.) ===
  * Agenda:
    * Observing run status
      * Binary range is ~400kpc (Best is 500kpc.)
      * Trigger rate check
        * Quite difference Trigger rate between the strain signal and the error signal.
      * Glitch plot with Burst triggers.
    * SummaryPage troubles
      * Some process (LSC.ini) was frequently stopped.
    * RRT tools
      * Shinkai-san suggested us it's better to prepare the dedicated workstation and mail address.
      * RRT tools from medm interface is available at Kamioka site
      * LValert can be receive alert from GraceDB.
        * Event information is not enough (no mass parameter).
        * Tagoshi-san tested on Kashiwa server.


=== 20200227 (Thu.) ===
  * Agenda:
    * SummaryPage trouble
      * Configuration file errors -> fixed and checking now (Oshino-san)
      * Past two day's pages will be regenerated.
    * RRT
      * Short-time SummaryPage generator tool on MEDM.
      * lvalert may be already available for KAGRA.
      * We can receive RRT call by setting 'GCN PRELIM SENT'.
    * DQ shift
      * This taks should be assigned for collaborator shift.
      * TY will discuss this issue with Miyoki-san.


=== 20200130 (Thu.) ===
  * Agenda:
    * KAGRA Readiness
    * RRT shift
    * PEM DQ flags


=== 20200116 (Thu.) ===
  * Agenda:
    * Minimum goal of KAGRA readiness issue
      * State Vector definition
        * goal: send {{{K1:DET-DQ_STATE_VECTOR}}}
        * status: Done.
      * DQSEGDB capability
        * goal: send OBSERVATION segment
        * status: 95%
          Automation should be done. (will be done by Robert)
      * Web page preparation
        * goal: publish SummaryPage
        * status: Done.
      * DQ event validation
        * under discussion
          Probably we cannot provide so many veto segments.<<BR>>
          So at least one (hopefully a few) simple segments will be provided and uploaded.<<BR>>
          (e.g. Omicron triggered segments, Earthquake segments, etc.)
      * GraceDB issue
        * under discussion
          Full(?) access to GraceDB is opened for KAGRA people.<<BR>>
          Developing/importing GraceDB API tools is better to be done with DET and DAWG.

=== 20200109 (Thu.) ===
  * Agenda:
    * KAGRA readiness issue
      * State Vector definition
        * SV is provided on the real-time IFO control model.
        * SV is contained in both raw frames and low-latency frames.
        * SV definition is summarized on [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/DET/DataQuality|Wiki]] and kept as latest information.
        * Finally it should be summarized as a tech-report.
      * DQSEGDB capability
        * Segment files are provided on the Kamioka and Kashiwa servers.
        * Files will be shared with LV by rsync+ssh method.
        * Accessing gwdet.icrr.u-tokyo.ac.jp from LIGO's DQSEGDB was already successfully.
      * Web page preparation
        * SummaryPage is opened also for remote site people.
        * Contents are being closed to LIGO's SummaryPage contents.
        * TY and Alex are now updating some softwares on k1sum0. So SummaryPage may become unstable next couple of days.
      * DetChar/DQ event validataion
        * We are now planning to provide DQ flags indicating earthquake, loud seismotion, etc. (See Kozakai-san's slide)
        * These information are shared with LV via DQSEGDB.
      * Low-Latency tools and GraceDB issues
        * Some tools used as low-latency ones in LIGO (Omicron, hveto etc.) are available.
        * We are waiting for the update of GraceDB authentication by LIGO.
    * Offline DQ [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11176}|Slides]]
    * E-run analysis (washimi) [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11177|Slide]]

Meetings


Agenda & Minutes

20210816 (Mon.)

  • Agenda
    • hveto analysis
    • O4 commissioning
    • KAGRA readiness
    • f2f meeting
  • Minutes
    • hveto analysis
    • O4 commissioning
      • FNC instability (klog#17748, klog#17865)

        • We are not investigating the cause of instability of Michelson fringes of FNC (green laser)
        • Fiber coupling at PSL room is the most reasonable candidate.
        • We need to investigate temperature environment around green laser more detailed.
      • MN Photo sensor noise (klog#17876)

        • It doesn't seem to be not a real ground motion because upper stage isn't shaked.
        • We doubt the electrical noise now.
        • O4 readiness
    • O4 readiness
      • #15 [Cont'd] State Vector Definition
        • Responsible: T. Yamamoto -> T. Yamamoto

      • #16 + #20 Segment production with short latency
        • Responsible: K. Kokeyama -> S. Oshino, T. Yamamoto

      • #17 [Cont'd ] Status web pages (summary pages, gw status, gw istat)

        • Responsible: S. Oshino -> S. Oshino

      • #18 [Cont'd] DQ event validation
        • Responsible: C. Kozakai -> K. Ueno, T. Yamamoto

      • #19 [Cont'd] GraceDB
        • Responsible: H. Tagoshi -> H. Tegoshi(?)

      • #21 [New] Data Category (at least CAT1) production
        • Responsible: !!!!!

      • #22 [New] RRT contribution
        • Responsible: H. Yuzurihara

20210802 (Mon.)

  • Agenda:
    • hveto analysis
    • O4 commissioning and preparation
    • Hardware injection plan during O4
    • KAGRA O4 readiness
    • Proposal of O3GK DetChar paper slide

  • Minutes:
    • hveto analysis
      • clustering test
        • Round winer doesn't change by clustering option.
        • Some kind of clustering is necessary but best parameter is not clear yet.
        • Kihyun will share the event time of clustered events.
        • We should check each event by spectrogram, Omega-scan, etc.
        • hveto with clustering will be also performed for 2 weeks day.
    • O4 commissioning
      • Omega-scan on Kashiwa has some error now. And
    • Hardware injection plan during O4
      • KAGRA CAL group is now gathering the plan of HWI during observations.
      • In LIGO case, in order to do HWI during obs., they need special and reasonable reasons.
      • KAGRA CAL also plan to adopt same procedures of the HWI management as LIGO.
      • If you have any HWI plan related to DET activities pls. share in DET telecons once.
      • We would like to discuss that the requested plans should be conducted during ER or obs.
    • O4 readiness
      • #15 [Cont'd] State Vector Definition
        • Responsible: T. Yamamoto -> T. Yamamoto

      • #16 + #20 Segment production with short latency
        • Responsible: K. Kokeyama -> S. Oshino, T. Yamamoto

      • #17 [Cont'd ] Status web pages (summary pages, gw status, gw istat)

        • Responsible: S. Oshino -> S. Oshino

      • #18 [Cont'd] DQ event validation
        • Responsible: C. Kozakai -> T. Yamamoto

      • #19 [Cont'd] GraceDB
        • Responsible: H. Tagoshi -> H. Tegoshi(?)

      • #21 [New] Data Category (at least CAT1) production
        • Responsible: !!!!!

      • #22 [New] RRT contribution
        • Responsible: H. Yuzurihara

20210726 (Mon.)

  • Agenda:
    • hveto analysis
    • O4 commissioning
    • O4 readiness
  • Minutes:
    • hveto analysis
      • Analyses with various clustering parameter are in progress. Kihyun will report in next telecon.
    • O4 commissioning
    • O4 readiness
      • It is preferable that the same person does not become multiple responsible person
      • As WP2021, DET tasks which is taken into account an effort follows readiness issues.
      • #15 [Cont'd] State Vector Definition
        • Responsible: T. Yamamoto -> T. Yamamoto

      • #16 + #20 Segment production with short latency
        • Responsible: K. Kokeyama -> S. Oshino, T. Yamamoto

      • #17 [Cont'd ] Status web pages (summary pages, gw status, gw istat)

        • Responsible: S. Oshino -> S. Oshino

      • #18 [Cont'd] DQ event validation
        • Responsible: C. Kozakai -> !!!!!

      • #19 [Cont'd] GraceDB
        • Responsible: H. Tagoshi -> H. Tegoshi(?)

      • #21 [New] Data Category (at least CAT1) production
        • Responsible: !!!!!

      • #22 [New] RRT contribution
        • Responsible: H. Yuzurihara

20210719 (Mon.)

  • Agenda:
    • hveto analysis
    • O4 commissioning
    • O4 readiness
  • Minutes
    • O4 commissioning
      • IMC-XARM commissioning
        • FNC control saturation klog17464

        • MC Oplev glitches and 120Hz line still exist (K1:VIS-MC{I,E,O}_TM_WIT_{P,Y})
        • Unstational noise excess on Green laser above 100Hz still exists (K1:ALS-
    • O4 readiness
      • #15 [Cont'd] State Vector Definition
        • Responsible: T. Yamamoto -> T. Yamamoto(?)

      • #16 + #20 Segment production with short latency
        • Responsible: K. Kokeyama -> S. Oshino, T. Yamamoto

      • #17 [Cont'd ] Status web pages (summary pages, gw status, gw istat)

        • Responsible: S. Oshino -> S. Oshino(?)

      • #18 [Cont'd] DQ event validation
        • Responsible: C. Kozakai ->

      • #19 [Cont'd] GraceDB
        • Responsible: H. Tagoshi -> H. Tegoshi(?)

      • #21 [New] Data Category (at least CAT1) production
        • Responsible:
      • #22 [New] RRT contribution
        • Responsible: H. Yuzurihara(?)

20210705 (Mon.)

  • Agenda:
    • O3GK paper
    • white paper
    • O4 commissioning
  • Minutes:
    • O3GK paper
      • Hveto was rerun with various parameters.
      • But there is no improvement in the veto efficiency.
    • white paper
      • Final version was released.
      • There was no additional comments from LV
      • LIGO Git

    • O4 commissioning
      • no report


20210628 (Mon.)

  • Agenda
    • O3GK paper
    • white paper
    • O4 commissioning & preparation

  • Minutes
    • O3GK paper
      • Uchikata-san and Narikawa-san got a consistent results with Kozakai-san's one.
      • hveto was performed with 0.1 duration.
      • There is no efficient channel/sensor for glitch veto.
        • Some parameters comes from LIGO's one.
        • So we need to find better parameters for KAGRA's data.
        • We also need prepare the more efficient sensors for O4 observing run
      • Kihyun is also performing the crosscheck. (1 or 2 weeks later he can report.)
    • white paper
      • Draft on LIGO Git

      • TY will be added a description about CAGMon until LVK DET call.
      • WP will be fixed at Ops call on 6/30 (?)
    • O4 commissioning & preparation

      • IMC commissioning
        • [Ongoing] Glitches on OpLev

          • Because of too many glitches, it's difficult to investigate one by one.
          • K1:VIS-MC{I,E,O}_TM_WIT_{P,Y} (MC Oplevs)
        • [Fixed] PLL noise coming from broken circuit klog17188

        • [Ongoing] PLL also has glitches (maybe) due to electrostatic discharge. klog17239

          • K1:ALS-{X,Y}_BEAT_ERR_OUT_DQ (error signal)
          • K1:ALS-{X,Y}_PLL_SLOW_DAQ_OUT_DQ (feedback signal)
        • [Ongoing] non-stational correlation between IMC/PLL and Microphone
          • K1:CAL-CS_PROC_IMC_FREQUENCY_DQ (calibrated frequency noise)
          • K1:IMC-SERVO_SLOW_DAQ_OUT_DQ (feedback signal of IMC)
          • K1:ALS-{X,Y}_PLL_SLOW_DAQ_OUT_DQ (feedback signal of PLL)
        • [Ongoing] station correlation between PMC and Microphone
          • Investigation about significance of coherence is ongoing.


20210621 (Mon.)

  • Agenda
    • O3GK paper
    • O4 whitepaper
    • O4 commissioning & preparation

  • Minutes
    • O4 white paper
      • The 1st version of the draft was submitted on June 17th.
      • Final deadline is June 30th.
        • We can still do the miner fix.
    • O4 commissioning & preparation

      • IMC Commissioning
        • Omicron trigger searches for MC Oplevs were resumed (klog#17150).

          • K1:VIS-MC{I,E,O}_TM_WIT_{P,Y} (oplev signals)
          • K1:VIS-IMMT{1,2}_TM_WIT_{P,Y} (as a reference of circuit noise)
        • SummaryPages

          • Glitch trigger tabs are added.
          • Loudest glitches can be seen on Pastavi (only internal ICRR network)

20210614 (Mon.)

  • Agenda
    • O3GK paper
    • O4 whitepaper
    • O4 commissioning & preparation

  • Minutes
    • O3GK paper
    • O4 white paper
      • draft

      • It's better to include PEM plans in commissions support section if exits.
    • O4 commissioning & preparation

      • IMC Commissioning
        • We have now four frequency noise signal (IMC, PMC, PLL-X, PLL-Y)
          • K1:CAL-CS_PROC_IMC_FREQUENCY_DQ (calibrated IMC as MHz)
          • K1:PSL-PMC_PZT_HV_MON_OUT_DQ (calibrated PMC as Volt at PZT amp.)
          • K1:ALS-X_PLL_SLOW_DAQ_OUT_DQ (calibrated Green-X as Volt at PZT)
          • K1:ALS-X_PLL_SLOW_DAQ_OUT_DQ (calibrated Green-Y as Volt at PZT)
        • PMC (always) and others (sometimes) have correlation with microphone signal
          • K1:PEM-MIC_PSL_TABLE_PSL1_Z_OUT_DQ (calibrated as Pascal)
        • OpLev signals have some glitches and are investigated now.

          • K1:VIS-MC{I,E,O}_TM_WIT_{P,Y}
          • Real SUS motion?, electrical glitches?, scattered light? etc.
      • SummaryPages

        • Updated PSL, PEM tabs.
          • PLL signals are available.


20210607 (Mon.)

  • Agenda
    • O3GK paper
    • O4 whitepaper
    • O4 commissioning & preparation

  • Minutes
    • O3GK paper
      • Preparing some plots about histgram and glitch rate of both KAGRA and GEO
    • O4 whitepaper
    • O4 commissioning & preparation

      • CAGMon development
        • slide

          • Found correlation between wind power and BNS ranges
          • OMMT1 doesn't (maybe) have Oplev. It's better to confirm what kind of sensors were coneected.
          • BNS range channel has ~2min latency. It may become better results by considering the latency in BNS range calculation.
      • IMC commissioning
        • Noise investigation (klog)

        • Correlation between IMC and MIC sometimes increase in spite of no change in microphone spectra.
        • Coupling coefficients may be changed in time.
      • Cross check of hveto results.
        • Kihyun's (KISTI) and Chihiro's (Kamioka) results were confirmed as consistent each other.
        • For O4 observing run, Kashiwa environment is also important for increasing machine power.
        • Requirement of machine power should be estimated soon (but it's strongly depends on the situation of O4 joining)
        • We plan to use 100-200 aux. channels and it's very helpful to analyze them at the same time for each pipeline.
      • lvalert
        • no report
      • SummaryPage

        • no report
      • DetChar cluster

        • no report


20210531 (Mon.)

  • Agenda
    • O3GK paper
    • O4 readiness
    • O4 commissioning & preparation

  • Minutes
    • O3GK paper
      • Comparison with Uchikata-san's and GEO people's results is ongoing.
      • Kihyun is performing validation check of his results => He will report in next or 2 weeks later telecon.

    • O4 readiness
      • #15 [Cont'd] State Vector Definition
        • Responsible: T. Yamamoto -> T. Yamamoto(?)

      • #16 + #20 Segment production with short latency
        • Responsible: K. Kokeyama ->

      • #17 [Cont'd ] Status web pages (summary pages, gw status, gw istat)

        • Responsible: S. Oshino -> S. Oshino(?)

      • #18 [Cont'd] DQ event validation
        • Responsible: C. Kozakai ->

      • #19 [Cont'd] GraceDB
        • Responsible: H. Tagoshi -> H. Tegoshi(?)

      • #21 [New] Data Category (at least CAT1) production
        • Responsible:
      • #22 [New] RRT contribution
        • Responsible: H. Yuzurihara(?)

    • white paper 2021
      • No progress in draft.
      • Task list will be based on O4 readiness.
        • If there is another task plan, please let TY know (maybe CAGMon, ICA, pastavi development etc.).
    • O4 commissioning & preparation

      • LVAlert
        • no report
      • SummaryPages update

        • no report
      • DET cluster
        • no report
      • CAGMon development
        • no report


20210524 (Mon.)

  • Agenda
    • O3GK paper
    • O4 commissioning & preparation

    • O4 readiness
  • Minutes
    • O3GK paper
      • Discussion with GEO people is ongoing
    • O4 commissioning & preparation

      • MC circuit noise hunting
        • Current spectrum is too clean 1/f noise.
          • Frequency noise should shows 1/f spectrum.
          • But we haven't checked it's a real frequency noise (circuit noise etc.).
          • Nakano-kun said current spectrum is consistent with past measurements.
      • sound correlation
        • Investigating sound correlation with three microphones. slide

      • lvalert test
        • no report
      • DET cluster
        • no report
      • SummaryPages

        • added for some IMC signals and it work well.
    • White paper 2021

20210517 (Mon.)

  • Agenda
    • KAGRA O4 readiness
    • LVK white paper 2021
    • O3GK paper
    • IMC commissioning
  • Minutes
    • KAGRA O4 readiness
      • #15 [Cont'd] State Vector Definition
        • Responsible: T. Yamamoto ->

      • #16 [Cont'd] DQSEGDB capability
        • Responsible: K. Kokeyama ->

      • #17 [Cont'd ] Status web pages (summary pages, gw status, gw istat)

        • Responsible: S. Oshino ->

      • #18 [Cont'd] DQ event validation
        • Responsible: C. Kozakai ->

      • #19 [Cont'd] GraceDB
        • Responsible: H. Tagoshi ->

      • #20 [New] Segment production (merged with #16?)
        • Responsible:
      • #21 [New] Data Category (at least CAT1) production
        • Responsible:
      • #22 [New] RRT contribution
    • LVK white paper
      • Responsible:
      • What TY thought
        • All activities which are submitted as 2021 DET effort should be described on this documents.
        • It will be based on white paper 2020 and KAGRA O4 readiness.
        • Should clarify who will do each item (though personal name itself is not described on this documents).
        • Should show the rough timeline for R&D tasks.

    • O3GK paper
      • We need to continue to discuss with GEO people about GEO data analysis.
    • IMC Commissioning
      • Current IMC control signals on DGS are contaminated by circuit noise.
      • Important thing is that contamination is occurred only on DGS signals or also on real analog signals
      • Important channels
        • K1:IMC-SERVO_{MIXER,FAST,SLOW}_DAQ_OUT_DQ
        • K1:IMC-SERVO_NPRO_TEMP_BIAS_OUT_DQ
        • => These channels will be added to SummaryPages

    • O4 preparation
      • CAGMon development
        • no report
      • lvalert test
        • no report
      • DET cluster
        • no report

20210510 (Mon.)

  • Agenda
    • KIW
    • O3GK paper
    • IMC Commissioning
    • O4 preparation
  • Minutes
    • KIW
      - Status of KAGRA DET (20 min) => T. Yamamoto
      - Status of LIGO Detchar (20 min)
      - Status of Virgo Detchar (20 min)
      - Contributed Talk 1 - one slot from KAGRA (15 min) => H. Yuzurihara
      - Contributed Talk 2 - CAGMon tools (15 min)
      - Contributed Talk 3 - KISTI's data transfer and computing (15 min)
    • O3GK paper
      • hveto process for GEO600 was done.
    • IMC Commissioning
      • [PMC] Acoustic coherence (20-200Hz)
      • [IMC] Oscillation? (13-15MHz)
    • O4 preparation
      • SummaryPages

        • no report
      • lvalert
        • no report
      • DET cluster
        • no report

20210426 (Mon.)

  • Agenda
    • O3GK analysis
    • O4 preparation
    • IMC Commissioning
  • Minutes
    • O3GK analysis
      • Omicron analysis of GEO was finished.
      • Checking results is ongoing.
      • We need to convert segment information on DQSEGDB to xml format.
      • After checking omicron results, hveto analysis can be started.
    • CAG Mon development
      • CAG Mon was able to detect some correlation in O3GK data
      • Prioritize is not done yet.
        • prioritize can be decided by correlation coefficient value or total duration of correlation appearing
      • We need more time to develop CAGMon (before we move to review process.).
    • IMC Commissioning
      • Microphone self noise is evaluating now.
      • They will be installed in PSL room
    • Paper writing person(s) from DET
      • TY takes over from Kozakai-san.
    • summary of lvalert test for LVK DET telecon


20210419 (Mon.)

  • Agenda
    • O3GK analysis
    • O4 preparation (LV alert, SummaryPages, CAGMon)

    • PMC/IMC noise hunting
  • Minutes
    • O3GK analysis
      • GEO data analysis is started.
      • Channel list is prepared by GEO people.
    • PMC/IMC noise hunting
      • Sound noise
        • Frequency noise has coherence with microphone signal.
        • Sound noise affected to DARM sensitivity during O3GK.
        • Noise source and injection injection route should be investigated.
      • Electrical noise(?)
        • Accelerometer channel has coherence with frequency noise when PEM sensor turned OFF.
        • Circuit noise level is small, but some electrical coherence may exist.

20210408 (Thu.)

  • Agenda
  • Minutes
    • O3GK analysis
      • hveto re-analysis for a part of data was done.
        • round winner is same
        • significant is slightly difference, (using same conf. triggers, version, etc)
        • Next step is to check consistency of veto segment
      • GEO data
        • Analysis itself will be performed by KAGRA people
        • Understanding results will be performed by GEO (+KAGRA) people


20210401 (Thu.)

  • Agenda
  • Minutes
    • Announcement
      • New slot of DET meeting.
        • => Pending because TY cannot know free time slot yet. (7 doodle poll is running...).

      • hveto
        • Omicron test analysis is successful.
        • hveto doesn't run on m31 yet.
        • We need to KISTI environment.
      • lvalert
        • Waiting response from LV people.
        • We need realistic json format of GW alert.
        • Only for the purpose of launching pipelines, dummy format is also used.
      • SummaryPages

        • The 1st version of VIS tab is already available (Only Type-A and guardians).
        • Importing PSL tab from LIGO is already done.
        • But there is many difference of channel name convention.


20210325 (Thu.)

  • Agenda
    • Progress of hveto analysis
    • GEO data analysis
    • SummaryPage construction

    • lvalert test
    • PMC/IMC commissioning
    • Meeting time in the next FY
  • Minutes
    • Progress of hveto analysis
      • Consistency check still remains and it is solved yet.
    • GEO data analysis
      • Basic takeover is finished.
      • Uchikata-san and Narikawa-san can start to use Omicron and hveto.
      • But some error occurs on hveto@m31.
      • We should fixed environmental problem.
    • SummaryPage construction

      • The 1st version is already constructed on test directory.
      • We can apply it for product environment because current SummaryPage is not valid.

    • lvalert test
      • lvalert itself works well.
      • Next step is receiving alert.
      • We need to ask LIGO people about alert format etc.
    • PMC/IMC commissioning
      • Due to a lot of troubles, we haven't achieved IMC locked yet.
      • We may start some kind of commissioning from Mid or Late of April.
    • Meeting time in the next FY
      • TY will circulate doodle poll.

20210317 (Thu.)

  • O3GK paper
    • hveto cross-check
      • Checking Omicron parameter remains.
      • Required re-run for whole two weeks.
    • veto segment production
      • Merging short segments is not required.
    • GEO data analysis
      • It can be done by someone form Tagoshi-san's group.
  • O4 preparation
    • Kamioka cluster
      • It's pending due to the recovery work of power outage.
    • Takeover about Omicron, hveto, GlitchPlot

      • Takeover itself is done.
      • TY is finding candidate person of each pipelines toward O4.
    • Omega-scan test
      • Installing on Kashiwa
    • lvalert test
      • It's works well on k1det1
    • SummaryPage update

      • The 1st version of VIS page is constructed.
      • It's being checked by Miyo-kun.
    • IMC commissioning
      • It is not locked yet because of some troubles.

20210225 (Thu.)

  • Agenda
    • Progress of O3GK paper
    • O4 preparation
  • Minutes
    • Progress of O3GK paper
      • Chihiro re-analysis with proper science segment for omicron triggers.
      • A part of Kihyun's analysis is done.
      • Cross-check can be done. But not start yet.
    • DetChar cluster in Kamioka

    • Omega-scan test
      • Installation for Kashiwa cluster was done.
      • Error is occurred on gwdatafind.
    • SummaryPages

    • LVAlert


20210218 (Thu.)

  • Agenda
    • Progress of O3GK paper
    • O3 data replay
    • O4 preparation
  • Minutes
    • Progress of O3GK paper
      • hveto conf is same
      • segment is used as latest same science segments
      • definition of cutting end of segments is difference.
      • Channel list is used as on github's one.
      • Next step -> unifying cutting definition.

        • Kihyun will re-run omicron with new segment cutting definition
      • We need to merge veto segment from a lot of short ones to continuous one.
    • O3 data replay
      • Main purpose of O3 data replay is performing end-2-end test of low-latency pipelines (CAL, DET, DAS, etc).
      • LV will use real O3 data.
      • KAGRA provides simulated data (~80Mpc for BNS) because of too poor sensitivity of O3GK data.
      • We may need to inject GWs on software with consistency with LV's real events.
      • Frame work of software injection is already available.
    • SummaryPage

      • Updating VIS page.
      • It will be closed to LIGO's one.
    • LVAlert
      • k1det1 can be used for test.
      • Need personal account because we use personal DCC account for accessing GraceDB.
        • Ask LV people how to get common account on next LVK DET meeting.


20210204 (Thu.)

  • Agenda
    • Progress of O3GK paper
    • O3 data replay
    • O4 requirement
  • Minutes
    • Progress of O3GK paper
      • Omicron trigger transfer: Kamioka -> KISTI, it is postponed.

        • Young-Min asked KISTI administrator.
      • GW-search triggers have not been served yet.
    • O3 data replay
      • K1:OPS-SIM_GAUSS1_IN1 (simulated error signal)
      • K1:OPS-SIM_GAUSS1_OUT (simulated h(t) )
        • gaussian noise as floor level
        • Some spectral lines (cal lines, violin mode, power lines)
        • Simulated glitches.
      • K1:OPS-SIM_GAUSS3_OUT (simulated auxiliary channel)
    • O4 requirement
      • DQ state vector (Yamamoto)
        • Providing on real-time model.
      • Data Quality Report (Yuzurihara)
        • First step is to use lvalert in order to receive GW alert from GraceDB.
      • Transient Event validation (Kozakai)
        • Basic idea is omicron+hveto (same as O3GK)
        • Takeover should be done from Kozakai-san.
      • Category veto (Yamamoto)
        • At least CAT1 should be provided.
        • We need to convert to veto-definer file format.
      • Spectral lines investigation (Yokozawa)
        • Listing of VIS-derived peak frequencies.


20210128 (Thu.)

  • Agenda
    • Report from Burst search
    • Binary range evaluation with C20 offline h(t)
    • Progress of O3GK paper
  • Minutes
    • Report from Burst search
    • Binary range evaluation with C20 offline h(t)
      • slide

      • Multi-taper and Welch show similar results
      • Bayesline result is slightly different from results by other two methods.
      • Estimated values are enough for O3GK (search) paper.
      • LVK review of this work is necessary for publishing results.
    • Progress of O3GK paper

20210121 (Thu.)

  • Agenda
    • Announcement
      • LVK DetChar call will be held (Jan. 25 19:00 JST, KST)

    • Progress of O3GK paper
    • CAGMon results
    • O3 Data replay
  • Minutes
    • Progress of O3GK paper
      • Some difference between Kihyun's and Chihiro's results.
      • hveto setting should be tuned on conf file and re-run again.
      • GW search results will be provided 1-2 months later (?).
    • CAGMon results
    • O3 data replay
      • LV requested the simulated data instead of O3GK data as KAGRA's data.
      • Auxiliary channels which has realistic coherence, coincidence etc are not available.
      • All multi-channel analyses cannot work well in such situation.
      • We need more discussion how do we join O3 data replay.

20210107 (Thu.)

  • Agenda
    • Progress of O3GK analysis
    • O4 preparation
  • Minutes
    • Progress of O3GK analysis
      • Analysis itself was finished.
      • Results by Chihiro and Kihyun are now comparing.
        • => Some conf. is still difference.

      • At least after finishing paper work, omicron triggers should be shared on Kashiwa cluster for remote site people.
    • O4 preparation
      • Model update will be finished soon.
        • => After model update, suspension commissioning will be started.

      • SummaryPages seems to be stopped.

        • => Because of the channel name update by VIS model changes.

        • => Current situation of real-time model is slightly complicated. ITMY: Old model, others: new model etc.

        • => After finishing CRY measurements, all suspension models are unified.

Past meeting

KAGRA/Subgroups/DET/Meeting (last edited 2024-07-16 11:36:08 by HirotakaYuzurihara)