| Size: 94836 Comment:  | Size: 95559 Comment:  | 
| Deletions are marked like this. | Additions are marked like this. | 
| Line 30: | Line 30: | 
| * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=34739|8/4 the observation was recovered]] | * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=34739|8/4 the interferometer control was recovered]] | 
| Line 57: | Line 57: | 
| * Restart live processes of Omicron since 6/21 (Oshino) [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=34740|klog]] * Issue on the low-latency h(t) (Yuzurihara) [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=16771|slide]] * The current low-latency h(t) sometimes missed the values of h(t). Even though the IFO was in observing state, h(t) has the zero value. The reproduction process failed due to the error flag recorded in the frame data. This might be replated to the issue reported by the Chia-Jui-san in the meeting on 7/9. * The issue was shared with the calibration group and open data group in KAGRA operation. The detailed annoucement will be done soon. | 
Meetings
- Meeting time: 11:00-11:30 JST/KST on every Wednesday
- Meeting room: Zoom3
Contents
- 
Meetings- 20250806 (Wed.)
- 20250723 (Wed.)
- 20250716 (Wed.)
- 20250709 (Wed.)
- 20250702 (Wed.)
- 20250625 (Wed.)
- 20250618 (Wed.)
- 20250611 (Wed.)
- 20250528 (Wed.)
- 20250521 (Wed.)
- 20250514 (Wed.)
- 20250430 (Wed.)
- 20250423 (Wed.)
- 20250416 (Wed.)
- 20250409 (Wed.)
- 20250402 (Wed.)
- 20250319 (Wed.)
- 20250312 (Wed.)
- 20250305 (Wed.)
- 20250226 (Wed.)
- 20250219 (Wed.)
- 20250212 (Wed.)
- 20250205 (Wed.)
- 20250129 (Wed.)
- 20250122 (Wed.)
- 20250115 (Wed.)
- 20250108 (Wed.)
- Past meeting
 
 
20250806 (Wed.)
- Agenda - Announcement - O4 schedule: - O4c: We are currently in O4c 
- Run plan operation call LIGO detchar - The end date and time for O4 is 18 November, 2025 at 16:00 UTC
 
 
- Scheduled conference - Amaldi & GR: 2025/07/14-18 @Scottish Exhibition Centre, Glasgow, UK web 
- ICRC 2025: 2025/07/15-24 @Geneva (Switzerland) web 
- TAUP 2025: 2025/08/24~30 @Sichuan Province of China web 
- KAGRA f2f meeting: Aug 19-21, 2025 @Toyama U. web 
- JPS meeting: 2025/09/16~19 @Hiroshima university web 
- GWPAW 2025: 2025/12/01~04 @Georgia Tech campus web 
 
- KAGRA site report 7/28 
- Scheduled power outage at ICRR, Kashiwa campus: September 27 (Sat) 2025, 9:00 - 18:00 (JST) - KAGRA main data server, gwcenter, dac, etc will be shut down during this period.
 
- Next meeting: 2025/08/27 (8/13: day off of ICRR, 8/20: f2f meeting)
 
- O4 schedule: 
- Progress reports - Upgrade DetChar computers (YamaT) 
- DQR update (Yuzurihara)
- lock loss study in the commissioning (YamaT, Yuzurihara) web 
- Update contents of summary page (Oshino)
- Related to segment files (Uchikata, Narikawa)
- pyCBC trigger list for O4a data (Narikawa and Uchikata)
- provide the CAT1 veto-definer file for IPC glitch (Uchikata)
 
 
- Announcement 
- Minutes - Commissioning
- Observing run - lockloss investigation during O4c (2025/06/11~06/17) (Yuzurihara, Aogaku members) 
 
- Cache file issue at Kashiwa cluster (Yuzurihara)
- Lack of some GWF files in cache files due to a delay on the data transfer (YamaT) klog 
- Missing data segment on each model (YamaT) klog 
- Restart live processes of Omicron since 6/21 (Oshino) klog 
- Issue on the low-latency h(t) (Yuzurihara) slide - The current low-latency h(t) sometimes missed the values of h(t). Even though the IFO was in observing state, h(t) has the zero value. The reproduction process failed due to the error flag recorded in the frame data. This might be replated to the issue reported by the Chia-Jui-san in the meeting on 7/9.
- The issue was shared with the calibration group and open data group in KAGRA operation. The detailed annoucement will be done soon.
 
 
20250723 (Wed.)
- Agenda - Announcement - O4 schedule: - O4c: We are currently in O4c 
- Run plan operation call LIGO detchar - The end date and time for O4 is 18 November, 2025 at 16:00 UTC
 
 
- Scheduled conference - Amaldi & GR: 2025/07/14-18 @Scottish Exhibition Centre, Glasgow, UK web 
- ICRC 2025: 2025/07/15-24 @Geneva (Switzerland) web 
- TAUP 2025: 2025/08/24~30 @Sichuan Province of China web 
- KAGRA f2f meeting: Aug 19-21, 2025 @Toyama U. web 
- JPS meeting: 2025/09/16~19 @Hiroshima university web 
- GWPAW 2025: 2025/12/01~04 @Georgia Tech campus web 
 
- KAGRA site report 7/10 - 7/15 temperature of IX (4K_REF1_50K_HEAD) increased 84.36 -> 110.47K klog 
- 7/20 IFO could not be recovered after the long lock loss caused by several big earthquakes 
- 7/22 Network disconection between KAGRA site and Kashiwa 15:03~15:05(?). The low-latency frame are missing during this period. - Similar issue might had occurred between Jul19 night and Jul20.
 
- 7/22 KAGRA calibration group is planning to update the uncertainty estimation for O4a data. There is no change on the strain data.
 
- Scheduled power outage at ICRR, Kashiwa campus: September 27 (Sat) 2025, 9:00 - 18:00 (JST) - KAGRA main data server, gwcenter, dac, etc will be shut down during this period.
 
- Next meeting: 2025/08/06
 
- O4 schedule: 
- Progress reports - Upgrade DetChar computers (YamaT) 
- DQR update (Yuzurihara)
- lock loss study in the commissioning (YamaT, Yuzurihara) web 
- Update contents of summary page (Oshino)
- Related to segment files (Uchikata, Narikawa)
- pyCBC trigger list for O4a data (Narikawa and Uchikata)
- provide the CAT1 veto-definer file for IPC glitch (Uchikata)
 
 
- Announcement 
- Minutes - Commissioning
- Observing run
- Cache file issue at Kashiwa cluster - Duplication in the recent cache files at Kashiwa cluster (Yuzu) 
- This issue was caused was the long idel time after the job submission.
- The script to submit the job is /home/detchar/git/kagra-detchar/tools/Cache/Script/condor.sh. Does anyone know the reason why the line of periodic_remove = (JobStatus == 1) && (time() - QDate) > 45 is commented out? 
- Comment out was removed at 7/23 15:00 JST.
 
- BNS range of KAGRA during O4c git repo - It's better to use the low-latency strain (K1:CAL-STRAIN_C00)
 
 
20250716 (Wed.)
- Agenda - Announcement - O4 schedule: - O4c: We are currently in O4c 
- Run plan(07/11 updated) operation (07/10) LIGO detchar (06/30) - The new end date and time for O4 is 18 November, 2025 at 16:00 UTC
 
 
- Scheduled conference - Amaldi & GR: 2025/07/14-18 @Scottish Exhibition Centre, Glasgow, UK web 
- ICRC 2025: 2025/07/15-24 @Geneva (Switzerland) web 
- TAUP 2025: 2025/08/24~30 @Sichuan Province of China web 
- KAGRA f2f meeting: Aug 19-21, 2025 @Toyama U. web 
- JPS meeting: 2025/09/16~19 @Hiroshima university web 
- GWPAW 2025: 2025/12/01~04 @Georgia Tech campus web 
 
- KAGRA site report 7/10 
- Scheduled power outage at ICRR, Kashiwa campus: September 27 (Sat) 2025, 9:00 - 18:00 (JST) - KAGRA main data server, gwcenter, dac, etc will be shut down during this period.
 
- Next meeting: 2025/07/30
 
- O4 schedule: 
- Progress reports - Upgrade DetChar computers (YamaT) 
- DQR update (Yuzurihara)
- lock loss study in the commissioning (YamaT, Yuzurihara) web 
- Update contents of summary page (Oshino)
- Related to segment files (Uchikata, Narikawa)
- pyCBC trigger list for O4a data (Narikawa and Uchikata)
- provide the CAT1 veto-definer file for IPC glitch (Uchikata)
 
 
- Announcement 
- Minutes - Commissioning
- Observing run - lockloss investigation during O4c (2025-07-10 10:53:19.187500 UTC) - OMC local control with dither might be doubtful.
 
 
- Segment - Time of saturationwas one second offset. The timing of the reproduction will be discussed in future.
 
- Omictron trigger generation is underway by Chia-Jui Chou - Is there large difference between low-latency strain and online strain? --> In terms of the trigger generation, no big impact. 
- For the summary page, we generate the trigger with high pass filter of 8 Hz configuration file 
- If we have enough person power, we should compare the triggers between low latency strain and online strain.
 
- Satellite meeting for noise subtraction is planed on 8/22 9:30~12:00 at Toyama University.
 
20250709 (Wed.)
- Agenda - Announcement - O4 schedule: - O4c: We are currently in O4c 
- Run plan(06/03 updated) operation (06/26) LIGO detchar (06/30) - The new end date and time for O4 is 18 November, 2025 at 16:00 UTC
 
 
- Scheduled conference - Amaldi & GR: 2025/07/14-18 @Scottish Exhibition Centre, Glasgow, UK web 
- ICRC 2025: 2025/07/15-24 @Geneva (Switzerland) web 
- TAUP 2025: 2025/08/24~30 @Sichuan Province of China web 
- KAGRA f2f meeting: Aug 19-21, 2025 @Toyama U. web 
- JPS meeting: 2025/09/16~19 @Hiroshima university web 
- GWPAW 2025: 2025/12/01~04 @Georgia Tech campus web 
 
- KAGRA site report 06/23 - 7/3 Coincidnece between glitchy on line tracking and rapid decreasing on BNS range 
- 7/8 new commissioning plan shared by Miyoki-san (see [kagra 07687])
 
- Scheduled power outage at ICRR, Kashiwa campus: September 27 (Sat) 2025, 9:00 - 18:00 (JST) - KAGRA main data server, gwcenter, dac, etc will be shut down during this period.
 
- Next meeting: 2025/07/16
 
- O4 schedule: 
- Progress reports - Upgrade DetChar computers (YamaT) 
- DQR update (Yuzurihara)
- lock loss study in the commissioning (YamaT, Yuzurihara) web 
- Update contents of summary page (Oshino)
- Related to segment files (Uchikata, Narikawa)
- pyCBC trigger list for O4a data (Narikawa and Uchikata)
- provide the CAT1 veto-definer file for IPC glitch (Uchikata)
 
 
- Announcement 
- Minutes - Commissioning
- noise subtraction - proposal to select the safe/unsafe channels by using pcal measurement
 
- Preparation of CAT1 file of O4a - Based on the reply from Robert, trial to upload segments to test server of DQSEGDB is underway. The upload to the test server requires to join the different authentification from Scitoken. git issue 
- Authentification with Scitoken is not implemented in the current igwn conda environment yet. We should use the igwn-testing or igwn-starging. web 
- At the same time, open data group is requesting to provide the segment of the observing mode after excluding the CAT1 data (not via DQSEGDB) for the paper.
 
- IPC glitch on the low-latency strain - The length of time contaminated by one IPC glitch was reported to differ between low-latency strain and online strain, by Chia-Jui Chou.
- In case of online strain, basically the length including the IPC glitch is less than 1 second. But, in the case of low-latency strain, it's more than 1 second. The filter length is 4 seconds. So, if we take the time margin +/-2 seconds, it will be fine.
- We will consider to update the segment file if the low-latency strain will be the final output from the calibration group, and proper channel lists to catch the IPC glitch in the low-latency strain.
 
 
20250702 (Wed.)
- Agenda - Announcement - O4 schedule: - O4c: We are currently in O4c 
- Run plan(06/03 updated) operation (06/26) LIGO detchar (06/30) - The new end date and time for O4 is 18 November, 2025 at 16:00 UTC
 
 
- Scheduled conference - Amaldi & GR: 2025/07/14-18 @Scottish Exhibition Centre, Glasgow, UK web 
- ICRC 2025: 2025/07/15-24 @Geneva (Switzerland) web 
- TAUP 2025: 2025/08/24~30 @Sichuan Province of China web 
- KAGRA f2f meeting: Aug 19-21, 2025 @Toyama U. web - The registration deadline is 7/6. 
 
- JPS meeting: 2025/09/16~19 @Hiroshima university web - The registration deadline is 2 PM on 7/3. 
 
 
- KAGRA site report 06/23 
- Scheduled power outage at ICRR, Kashiwa campus: September 27 (Sat) 2025, 9:00 - 18:00 (JST) - KAGRA main data server, gwcenter, dac, etc will be shut down during this period.
 
- Next meeting: 2025/07/09
 
- O4 schedule: 
- Progress reports - Upgrade DetChar computers (YamaT) 
- DQR update (Yuzurihara)
- lock loss study in the commissioning (YamaT, Yuzurihara) web 
- Update contents of summary page (Oshino)
- Related to segment files (Uchikata, Narikawa)
- pyCBC trigger list for O4a data (Narikawa and Uchikata)
- provide the CAT1 veto-definer file for IPC glitch (Uchikata)
 
 
- Announcement 
- Minutes - Commissioning
- Network Summary page including KAGRA is under testing by Derek at web 
- Preparation of CAT1 file of O4a - Based on the reply from Robert, trial to upload segments to test server of DQSEGDB is underway.
- Authentification with Scitoken is not implemented in the current igwn conda environment yet. We should use the igwn-testing or igwn-starging. web 
 
- Paper of Hveto analysis for O3GK paper was accepted in PTEP. The manuscript was uploaded in arXiv. 
 
20250625 (Wed.)
- Agenda - Announcement - O4 schedule: - O4c: We are currently in O4c 
- Run plan(06/03 updated) operation (06/12) LIGO detchar (06/16) - The new end date and time for O4 is 18 November, 2025 at 16:00 UTC
 
 
- Scheduled conference - Amaldi & GR: 2025/07/14-18 @Scottish Exhibition Centre, Glasgow, UK web 
- ICRC 2025: 2025/07/15-24 @Geneva (Switzerland) web 
- TAUP 2025: 2025/08/24~30 @Sichuan Province of China web 
- KAGRA f2f meeting: Aug 19-21, 2025 @Toyama U. web - The registration deadline is 7/6. 
 
- JPS meeting: 2025/09/16~19 @Hiroshima university web - The registration deadline is 2 PM on 7/3. 
 
 
- KAGRA site report 06/06 
- Scheduled power outage at ICRR, Kashiwa campus: September 27 (Sat) 2025, 9:00 - 18:00 (JST) - KAGRA main data server, gwcenter, dac, etc will be shut down during this period.
 
- Next meeting: 2025/07/02
 
- O4 schedule: 
- Progress reports - Upgrade DetChar computers (YamaT) 
- DQR update (Yuzurihara)
- lock loss study in the commissioning (YamaT, Yuzurihara) web 
- Update contents of summary page (Oshino)
- Related to segment files (Uchikata, Narikawa)
- pyCBC trigger list for O4a data (Narikawa and Uchikata)
- provide the CAT1 veto-definer file for IPC glitch (Uchikata)
 
 
- Announcement 
- Minutes - Commissioning
- Segment toward O5
- CAT1 for O4a
- Summary page - Rerun of Omicron and Hveto finished by the data of 6/15.
 
- Noise Subtraction Results using ICA on KAGRA Data klog 
 
20250618 (Wed.)
- Agenda - Announcement - O4 schedule: - O4c: We are currently in O4c 
- Run plan(06/03 updated) operation (06/12) LIGO detchar (06/16) - The new end date and time for O4 is 18 November, 2025 at 16:00 UTC
 
 
- Scheduled conference - Amaldi & GR: 2025/07/14-18 @Scottish Exhibition Centre, Glasgow, UK web 
- ICRC 2025: 2025/07/15-24 @Geneva (Switzerland) web 
- TAUP 2025: 2025/08/24~30 @Sichuan Province of China web 
- KAGRA f2f meeting: Aug 19-21, 2025 @Toyama U. web - The registration deadline is 6th July 2025.
 
- JPS meeting: 2025/09/16~19 @Hiroshima university web - The registration deadline is 2 PM on July 3rd.
 
 
- KAGRA site report 06/06 
- Next meeting: 2025/06/25
 
- O4 schedule: 
- Progress reports - Upgrade DetChar computers (YamaT) 
- DQR update (Yuzurihara)
- lock loss study in the commissioning (YamaT, Yuzurihara) web 
- Update contents of summary page (Oshino)
- Related to segment files (Uchikata, Narikawa)
- pyCBC trigger list for O4a data (Narikawa and Uchikata)
- provide the CAT1 veto-definer file for IPC glitch (Uchikata)
 
 
- Announcement 
- Minutes - Commissioning
- Summary page
 
20250611 (Wed.)
- Agenda - Announcement - O4 schedule: - O4c: We are currently in O4c 
- Run plan(06/03 updated) operation (06/05) LIGO detchar (06/09) - Maintenance/commissioning break from 1 April 2025 at 15:00 UTC to 11 June 2025 at 15:00 UTC
- The new end date and time for O4 is 18 November, 2025 at 16:00 UTC
 
 
- Scheduled conference - Amaldi & GR: 2025/07/14-18 @Scottish Exhibition Centre, Glasgow, UK web 
- ICRC 2025: 2025/07/15-24 @Geneva (Switzerland) web 
- TAUP 2025: 2025/08/24~30 @Sichuan Province of China web 
- KAGRA f2f meeting: Aug 19-21, 2025 @Toyama U. web - The registration deadline is 6th July 2025.
 
- JPS meeting: 2025/09/16~19 @Hiroshima university web - The deadline is 2 PM on July 3rd.
 
 
- KAGRA site report 06/06 - 6/3 full calibration measurements before starting observing run - calibration parameters were updated on 6/3 at 13:25 JST.
 
- 6/3 Alignment fluctuation of SR2 seems to shaking DARM through OMC misalignment 
- 6/6 Turned K1:OBS-INTENT on and began first OBSERVING of the ER17 period 
- 6/10 Sensitivity difference when OMC ADS was performed with the upper/lower sideband 
 
- Next meeting: 2025/06/18
 
- O4 schedule: 
- Progress reports - Upgrade DetChar computers (YamaT) 
- DQR update (Yuzurihara)
- lock loss study in the commissioning (YamaT, Yuzurihara) web 
- Update contents of summary page (Oshino)
- Related to segment files (Uchikata, Narikawa)
- pyCBC trigger list for O4a data (Narikawa and Uchikata)
- provide the CAT1 veto-definer file for IPC glitch (Uchikata)
 
 
- Announcement 
- Minutes - Commissioning - lockloss investigation: 2025/05/28~05/29 klog 
- Blasting of Tunnel construction unlocked IFO klog 
- lockloss investigation: 2025/05/29~06/01 klog 
- Transient noise in sensitivity and PRCL klog 
- lockloss investigation: 2025/06/02~06/03 klog 
- Expected improvement of inspiral range by mitigating of bump or line noise (2025/06/03) klog 
- lockloss investigation: 2025/06/04~06/05 klog 
- lockloss investigation: 2025/06/05~06/06 klog 
- Search the reason why the sensitivity became something worse in last night klog 
- ETMY MN oplev glitch caused lockloss klog 
 
- Line information - Peak list on DARM in the last weekend data klog 
 
- Summary page
- Segment production
- IPC glitch - Proposal about data reduction to mitigate IPC glitches klog 
 
- Scattered light noise - Scattered light noise in MICH error and feedback channels klog 
- This noise issue was solved thanks to modification of SR2. 
 
- preparation of CAT1 (Uchikata) - authentification issue for the DQSEGDB
 
- noise subtraction - 03:40:53, May 24, 2025 UTC ~ 03:57:57, May 24, 2025 UTC, 1024 seconds in total klog 
- Cleaning test is underway.
 
 
- Commissioning 
20250528 (Wed.)
- Agenda - Announcement - O4 schedule: - O4c: We are currently in O4c, and will end on 7 October 2025. 
- Run plan(05/15 updated) operation (05/15) LIGO detchar (5/12) - Maintenance/commissioning break from 1 April 2025 at 15:00 UTC to 4 June 2025 at 15:00 UTC; there is a potential at the start of the run for slightly elevated false alarm rates as search backgrounds accumulate
 
 
- Scheduled conference
- KAGRA site report 05/23 
- X.509 authentification certificate issuance ended on May 20. Please switch SciTokens wikiinstruction 
- Next meeting: 2025/06/11 (the meeting on 6/4 will be canceled due to the preparation of O4c run)
 
- O4 schedule: 
- Progress reports - Upgrade DetChar computers (YamaT) 
- DQR update (Yuzurihara)
- lock loss study in the commissioning (YamaT, Yuzurihara) web 
- Update contents of summary page (Oshino)
- Related to segment files (Uchikata, Narikawa)
- pyCBC trigger list for O4a data (Narikawa and Uchikata)
- provide the CAT1 veto-definer file for IPC glitch (Uchikata)
 
 
- Announcement 
- Minutes - Commissioning - lockloss investigation: 2025/05/23~05/25 klog 
 
- Toward the observing run - Update of IFO guardian to check calibration status klog 
- CAL_PROC guardian was resumed klog 
- Checker scripts for showing deviations from science-mode configuration klog 
- snapshot management is taken over from VIS guardians to LSC_LOCK guardian klog 
- Post-Response of Working with Observation JGWdoc 
- Definition of the science flag JGWdoc 
- Checked RFPD channels in the configuration files of Omicron, Hveto, and Omegascan klog 
- Modified plotting range of strain on SummaryPages klog 
 
- CAT1 preparation for O4a data - Update of the segment lists at kmst2 klog 
- The regenerated segment files are reviewed by Yuzurihara and Alvin.
 
 
- Commissioning 
20250521 (Wed.)
- Agenda - Announcement - O4 schedule: - O4c: We are currently in O4c, and will end on 7 October 2025. 
- Run plan(05/15 updated) operation (05/15) LIGO detchar (5/12) - Maintenance/commissioning break from 1 April 2025 at 15:00 UTC to 4 June 2025 at 15:00 UTC; there is a potential at the start of the run for slightly elevated false alarm rates as search backgrounds accumulate
 
 
- Scheduled conference
- KAGRA site report 05/02 
- X.509 authentification certificate issuance ended on May 20. Please switch SciTokens wikiinstruction 
- Next meeting: 2025/05/28
 
- O4 schedule: 
- Progress reports - Upgrade DetChar computers (YamaT) 
- DQR update (Yuzurihara)
- lock loss study in the commissioning (YamaT, Yuzurihara) web 
- Update contents of summary page (Oshino)
- Related to segment files (Uchikata, Narikawa)
- pyCBC trigger list for O4a data (Narikawa and Uchikata)
- provide the CAT1 veto-definer file for IPC glitch (Uchikata)
 
 
- Announcement 
- Minutes - Commissioning - Summary of recent segment for IPC glitch (2025/04/01~05/08) klog 
 
- scattered light noise
- Hveto Paper is ready for submission (Kihyun)
- Presentation of O4a glitch classification by Yi Yang. The slide will be uploaded in JGWdoc.
 
- Commissioning 
20250514 (Wed.)
- Agenda - Announcement - O4 schedule: - O4c: We are currently in O4c, and will end on 7 October 2025. 
- Run plan(03/15 updated) operation (05/08) LIGO detchar (5/12) - Maintenance/commissioning break from 1 April 2025 at 15:00 UTC to 4 June 2025 at 15:00 UTC; there may be an engineering period of around a week at the beginning of the run
- O4 will end on 7 October 2025 at 15:00 UTC
 
 
- Scheduled conference - Open Data Workshop 2025/05/12-14
- GWADW 2025: 2025/05/18~5/23 @the Hilton Cocoa Beach (Florida) Oceanfront
- KIW12: 2025/05/26~27 @Shanghai Astronomical Observatory, Chinese Academy of Sciences web - deadline for registration: 2025/04/30
 
- JGWC(Japan Gravitational Wave Community) workshop: 2025/05/09(Fri)~10(Sat)@ JAXA Sagamihara web 
- Amaldi & GR: 2025/07/14-18 @Scottish Exhibition Centre, Glasgow, UK web 
- ICRC 2025: 2025/07/15-24 @Geneva (Switzerland) web 
 
- KAGRA site report 05/02 
- Maintenance of Kashiw cluster (system-B) was done on April 18. - The purpose is for several software updates and for the update of condor setting to reserve CPUs for high-priority jobs.
 
- Retirement of X.509 authentification on May 20. Please switch SciTokens wikiinstruction 
- Next meeting: 2025/05/21
 
- O4 schedule: 
- Progress reports - Upgrade DetChar computers (YamaT) 
- DQR update (Yuzurihara)
- lock loss study in the commissioning (YamaT, Yuzurihara) web 
- Update contents of summary page (Oshino)
- Related to segment files (Uchikata, Narikawa)
- pyCBC trigger list for O4a data (Narikawa and Uchikata)
- provide the CAT1 veto-definer file for IPC glitch (Uchikata)
 
 
- Announcement 
- Minutes - Commissioning
- cache and segment reproduction at Kashiwa cluster klog 
- Scattered light noise - A report of recent scattered light noise in MICH: 2025/04/13, 29 
- presentation (for ASROC) by Shih-Hong Hsu
 
- Hveto Paper by Kihyun is under review.
- Summary page (Oshino) - plan to change the order of tab
 
- Omicron and Hveto (Oshino) - plan to confirm the configuration files of Omicron and Hveto, especially channel related to RFPD
 
- Line Monitor (Takahiro S Yamamoto) - Fixing issues with the Line Monitor is underway.
 
 
20250430 (Wed.)
- Agenda - Announcement - O4 schedule: - O4c: We are currently in O4c, and will end on 7 October 2025. 
- Run plan(03/15 updated) operation (04/03) LIGO detchar (4/7) - Maintenance/commissioning break from 1 April 2025 at 15:00 UTC to 4 June 2025 at 15:00 UTC; there may be an engineering period of around a week at the beginning of the run
- O4 will end on 7 October 2025 at 15:00 UTC
 
 
- Scheduled conference - From Quarks to Neutron Stars: Insights from kHz gravitational waves: 2025/04/23-24 @Hongo Campus, The University of Tokyo web 
- Open Data Workshop 2025/05/12-14
- GWADW 2025: 2025/05/18~5/23 @the Hilton Cocoa Beach (Florida) Oceanfront
- KIW12: 2025/05/26~27 @Shanghai Astronomical Observatory, Chinese Academy of Sciences web - deadline for registration: 2025/04/30
 
- JGWC(Japan Gravitational Wave Community) workshop: 2025/05/09(Fri)~10(Sat)@ JAXA Sagamihara web 
- Amaldi & GR: 2025/07/14-18 @Scottish Exhibition Centre, Glasgow, UK web 
- ICRC 2025: 2025/07/15-24 @Geneva (Switzerland) web 
 
- KAGRA site report 04/18 
- Maintenance of Kashiw cluster (system-B) was done on April 18. - The purpose is for several software updates and for the update of condor setting to reserve CPUs for high-priority jobs.
 
- Retirement of X.509 authentification on May 20. Please switch SciTokens wikiinstruction 
- Next meeting: 2025/05/14 - plan to give short presentation by Shi-Hong
 
 
- O4 schedule: 
- Progress reports - Upgrade DetChar computers (YamaT) 
- DQR update (Yuzurihara)
- lock loss study in the commissioning (YamaT, Yuzurihara) web 
- Update contents of summary page (Oshino)
- Related to segment files (Uchikata, Narikawa)
- pyCBC trigger list for O4a data (Narikawa and Uchikata)
- provide the CAT1 veto-definer file for IPC glitch (Uchikata)
 
 
- Announcement 
- Minutes - Commissioning
- veto definer file - The CAL group decided to generate the strain data of O4a KAGRA data by applying the high-pass filter (FIR) and correcting the time-delay shift. Now it's underway.
- Originally, we planned to exclude the 1 second, including the IPC glitch, from the analysis. The additional FIR filter widens the time affected by the IPC glitch. We changed the plan to exclude 7 seconds (3+1+3 seconds) from the analysis.
- After excluding the segment including the IPC glitch, we also exclude the science mode of less than 64 seconds.
- The preparation of the veto definer file is underway. The procedure and other helpful links are summarized in wiki by Uchikata-san. 
 
- Pastavi - Pastavi update: removed less-used options klog 
 
- noise subtratcion - Noise Subtraction at 116 Hz on April 24 klog 
 
 
20250423 (Wed.)
- Agenda - Announcement - O4 schedule: - O4c: We are currently in O4c, and will end on 7 October 2025. 
- Run plan(03/15 updated) operation (04/03) LIGO detchar (4/7) - Maintenance/commissioning break from 1 April 2025 at 15:00 UTC to 4 June 2025 at 15:00 UTC; there may be an engineering period of around a week at the beginning of the run
- O4 will end on 7 October 2025 at 15:00 UTC
 
 
- Scheduled conference - From Quarks to Neutron Stars: Insights from kHz gravitational waves: 2025/04/23-24 @Hongo Campus, The University of Tokyo web 
- Open Data Workshop 2025/05/12-14
- GWADW 2025: 2025/05/18~5/23 @the Hilton Cocoa Beach (Florida) Oceanfront
- KIW12: 2025/05/26~27 @Shanghai Astronomical Observatory, Chinese Academy of Sciences web - deadline for registration: 2025/04/30
 
- JGWC(Japan Gravitational Wave Community) workshop: 2025/05/09(Fri)~10(Sat)@ JAXA Sagamihara web 
- Amaldi & GR: 2025/07/14-18 @Scottish Exhibition Centre, Glasgow, UK web 
- ICRC 2025: 2025/07/15-24 @Geneva (Switzerland) web 
 
- KAGRA site report 04/18 SEO report(4/1) 
- Maintenance of Kashiw cluster (system-B) was done on April 18. - The purpose is for several software updates and for the update of condor setting to reserve CPUs for high-priority jobs.
 
- Retirement of X.509 authentification web. Instead, please use SciTokens. web 
- Next meeting: 2025/04/30
 
- O4 schedule: 
- Progress reports - Upgrade DetChar computers (YamaT) 
- DQR update (Yuzurihara)
- lock loss study in the commissioning (YamaT, Yuzurihara) web 
- Update contents of summary page (Oshino)
- Related to segment files (Uchikata, Narikawa)
- pyCBC trigger list for O4a data (Narikawa and Uchikata)
- provide the CAT1 veto-definer file for IPC glitch (Uchikata)
 
 
- Announcement 
- Minutes - Commissioning
- veto definer file - The CAL group decided to generate the strain data of O4a KAGRA data by applying the high-pass filter (FIR) and correcting the time-delay shift. Now it's underway.
- Originally, we planned to exclude the 1 second, including the IPC glitch, from the analysis. The additional FIR filter widens the time affected by the IPC glitch. We changed the plan to exclude 7 seconds (3+1+3 seconds) from the analysis.
- After excluding the segment including the IPC glitch, we also exclude the science mode of less than 64 seconds.
- The preparation of the veto definer file is underway. The procedure and other helpful links are summarized in wiki by Uchikata-san. 
 
 
20250416 (Wed.)
- Agenda - Announcement - O4 schedule: - O4c: We are currently in O4c, and will end on 7 October 2025. 
- Run plan(03/15 updated) operation (04/03) LIGO detchar (4/7) - Maintenance/commissioning break from 1 April 2025 at 15:00 UTC to 4 June 2025 at 15:00 UTC; there may be an engineering period of around a week at the beginning of the run
- O4 will end on 7 October 2025 at 15:00 UTC
 
 
- Scheduled conference - From Quarks to Neutron Stars: Insights from kHz gravitational waves: 2025/04/23-24 @Hongo Campus, The University of Tokyo web 
- Open Data Workshop 2025/05/12-14
- GWADW 2025: 2025/05/18~5/23 @the Hilton Cocoa Beach (Florida) Oceanfront
- KIW12: 2025/05/26~27 @Shanghai Astronomical Observatory, Chinese Academy of Sciences web - deadline for registration: 2025/04/30
 
- JGWC(Japan Gravitational Wave Community) workshop: 2025/05/09(Fri)~10(Sat)@ JAXA Sagamihara web 
- Amaldi & GR: 2025/07/14-18 @Scottish Exhibition Centre, Glasgow, UK web 
- ICRC 2025: 2025/07/15-24 @Geneva (Switzerland) web 
 
- KAGRA site report 04/03 SEO report(4/1) - improvement of peaks around 20 Hz and their tails klog 
 
- Condor setting at Kashiwa cluster (system-B) will be updated not to occupy by single user and to reserve CPUs for high priority jobs
- Maintenance of Kashiw cluster (system-B) for several software update is planed.
- Next meeting: 2025/04/23
 
- O4 schedule: 
- Progress reports - Upgrade DetChar computers (YamaT) 
- DQR update (Yuzurihara)
- lock loss study in the commissioning (YamaT, Yuzurihara) web 
- Update contents of summary page (Oshino)
- Related to segment files (Uchikata, Narikawa)
- pyCBC trigger list for O4a data (Narikawa and Uchikata)
- provide the CAT1 veto-definer file for IPC glitch (Uchikata)
 
 
- Announcement 
- Minutes - Commissioning
- Summary page (Oshino) - Modified plotting range on SummaryPages klog 
 
- Gauch - Gauch update: added feature to display images lazy klog 
 
- Pastavi - Issue on cache file production on Pastavi server klog 
 
- veto definer file - Thre preparaion is ongoing. Derek and LIGO detchar team helped a lot.
- X.509 will be retired in May.
 
- Annoucement from open data
 
20250409 (Wed.)
- Agenda - Announcement - O4 schedule: - O4c: We are currently in O4c, and will end on 7 October 2025. 
- Run plan(03/15 updated) operation (04/03) LIGO detchar (4/7) - Maintenance/commissioning break from 1 April 2025 at 15:00 UTC to 4 June 2025 at 15:00 UTC; there may be an engineering period of around a week at the beginning of the run
- O4 will end on 7 October 2025 at 15:00 UTC
 
 
- Scheduled conference - From Quarks to Neutron Stars: Insights from kHz gravitational waves: 2025/04/23-24 @Hongo Campus, The University of Tokyo web 
- Open Data Workshop 2025/05/12-14
- GWADW 2025: 2025/05/18~5/23 @the Hilton Cocoa Beach (Florida) Oceanfront
- KIW12: 2025/05/26~27 @Shanghai Astronomical Observatory, Chinese Academy of Sciences web - deadline for registration: 2025/04/30
 
- JGWC(Japan Gravitational Wave Community) workshop: 2025/05/09(Fri)~10(Sat)@ JAXA Sagamihara web 
- Amaldi & GR: 2025/07/14-18 @Scottish Exhibition Centre, Glasgow, UK web 
- ICRC 2025: 2025/07/15-24 @Geneva (Switzerland) web 
 
- KAGRA site report 04/03 SEO report(4/1) - improvement of peaks around 20 Hz and their tails klog 
 
- Condor setting at Kashiwa cluster (system-B) will be updated not to occupy by single user and to reserve CPUs for high priority jobs
- Maintenance of Kashiw cluster (system-B) for several software update is planed.
- Next meeting: 2025/04/16
 
- O4 schedule: 
- Progress reports - Upgrade DetChar computers (YamaT) 
- DQR update (Yuzurihara)
- lock loss study in the commissioning (YamaT, Yuzurihara) web 
- Update contents of summary page (Oshino)
- Related to segment files (Uchikata, Narikawa)
- pyCBC trigger list for O4a data (Narikawa and Uchikata)
- provide the CAT1 veto-definer file for IPC glitch (Uchikata)
 
 
- Announcement 
- Minutes - Commissioning
- Summary page  - Modified plotting range on SummaryPages klog 
- Omicron stopped at 4/2 klog 
- Modified plotting range of OMC transmit power graph in SummaryPages klog 
- Adde new guardian state to guardian plots of SummaryPages klog 
- Added new tabs in SummaryPages (Working/Silent run/Locked (RF)) klog 
- modified plotting range of PSL table temperature and PSL QPD klog 
 
- Scattered light noise - No scattered light noise and transient noise in PRCL feedback of 4/2 and 4/3 klog 
 
- Denoising beam jitter noise at 127 Hz using DeepClean (Shu-Wei Yeh, Chia-Jui Chou) klog 
 
20250402 (Wed.)
- Agenda - Announcement - O4 schedule: - O4c: We are currently in O4c, and will end on 7 October 2025. 
- Run plan(03/15 updated) operation (03/20) - Maintenance/commissioning break from 1 April 2025 at 15:00 UTC to 4 June 2025 at 15:00 UTC; there may be an engineering period of around a week at the beginning of the run
- O4 will end on 7 October 2025 at 15:00 UTC
 
 
- Scheduled conference - (done) LVK meeting: 2025/03/24-27 @Albert Park, Melbourne, Australia web slide 
- From Quarks to Neutron Stars: Insights from kHz gravitational waves: 2025/04/23-24 @Hongo Campus, The University of Tokyo web 
- Open Data Workshop 2025/05/12-14
- GWADW 2025: 2025/05/18~5/23 @the Hilton Cocoa Beach (Florida) Oceanfront
- (new) KIW12: 2025/05/26~27 @Shanghai Astronomical Observatory, Chinese Academy of Sciences web - deadline for registration: 2025/04/30
 
- (new) JGWC(Japan Gravitational Wave Community) workshop: 2025/05/09(Fri)~10(Sat)@ JAXA Sagamihara web - deadline for registration: 2025/04/07
 
- Amaldi & GR: 2025/07/14-18 @Scottish Exhibition Centre, Glasgow, UK web 
- ICRC 2025: 2025/07/15-24 @Geneva (Switzerland) web 
 
- KAGRA site report 03/17 
- Condor setting at Kashiwa cluster (system-B) will be updated not to occupy by single user and to reserve CPUs for high priority jobs
- Maintenance of Kashiw cluster (system-B) for several software update is planed.
- Next meeting: 2025/04/09
 
- O4 schedule: 
- Progress reports - Upgrade DetChar computers (YamaT) 
- DQR update (Yuzurihara)
- lock loss study in the commissioning (YamaT, Yuzurihara) web 
- Update contents of summary page (Oshino)
- Related to segment files (Uchikata, Narikawa)
- pyCBC trigger list for O4a data (Narikawa and Uchikata)
- provide the CAT1 veto-definer file for IPC glitch (Uchikata)
 
 
- Announcement 
- Minutes - Commissioning - new label to tag the lockloss identify to the oscillation of IMC length control klog - (YamaT) is the cause of the oscillation readly IMC length? not IMC pitch?
 
- hang up of LOCKLOSS guardian due to bad treatment of string by ezca klog 
- lockloss investigation: 2025/03/19 UTC klog 
- lockloss investigation: 2025/03/18~3/20 klog 
 
- Summary page - Range estimation on SummaryPages klog klog 
 
- Scattered light noise - Relation between seismic motion and scattered light noise in PRCL: 2025/02/11 - 02/22 klog 
 
- Power outage at Kashiwa - Power outage at Kashiwa at 08:14 on 03/17; system-B was shutdown and recovered at 11:30. (See Kanda-san's mails)
 
- veto definer (CAT1) - we will work with LV team.
- (YamaT) What is the latency to provide the veto definer? --> a few month delay. 
 
- Bruco - Swapping of test and production servers for k1det2 klog 
 
- Segment production at Kamioka (Yuzu) - Restart the segment production klog 
 
- Segment production at Kashiwa (Uchikata) - The cache file and segment files were reproduced at Kashiwa cluster, except for 2/7. At that time, the channel name to identify the overflow was changed due to the model update. klog That's the cause of the failure of the reprocudtion. 
 
- Denoising beam jitter noise at 127 Hz using DeepClean (Shu-Wei Yeh) - (Yuzu) Is there the regular meeting of the noise subtraction? --> not yet 
- (Yuzu) What is the type of the band pass filter? --> butterworth 8-order, which is implemented in deepclean 
- (Yuzu) What is the update from previous analysis? --> They changed the different time and added the new channel in the analysis 
- (Yuzu) In addition to the ASD ratio, it's better to check the improvement of the inspiral range.
- (Yokozawa) If you change the frequency band, the results will be changed?
- (YamaT) deepclean can subtract both the linear and non-linear coupling. In this analysis, which both couplings were renoved? --> now only linear coupling 
 
- Presentation on the glitch investigation for O3GK data (Oshino)
 
- Commissioning 
20250319 (Wed.)
- Agenda - Announcement - O4 schedule: - O4c: We are currently in O4c, and will end on 7 October 2025. 
- Run plan(02/15 updated) operation (02/27) - Maintenance/commissioning break from 1 April 2025 at 15:00 UTC to 4 June 2025 at 15:00 UTC
- O4 will end on 7 October 2025 at 15:00 UTC
 
 
- Scheduled conference - From Quarks to Neutron Stars: Insights from kHz gravitational waves: 2025/04/23-24 @Hongo Campus, The University of Tokyo web 
- Open Data Workshop 2025/05/12-14
- GWADW 2025: 2025/05/18~5/23 @the Hilton Cocoa Beach (Florida) Oceanfront
- Amaldi & GR: 2025/07/14-18 @Scottish Exhibition Centre, Glasgow, UK web 
- ICRC 2025: 2025/07/15-24 @Geneva (Switzerland) web 
 
- KAGRA site report 02/25 
- Condor setting at Kashiwa cluster (called system-B) will be updated not to occupy by single user and to reserve CPUs for high priority jobs
- FY2025 Budget Plan --> The request was done. 
- Power outage at Kashiwa at 08:14 on 03/17; system-B was shutdown and recovered at 11:30. (See Kanda-san's mails)
- Next meeting: 2025/04/02 (next week, LVK meeting is overlapped)
 
- O4 schedule: 
- Progress reports - Upgrade DetChar computers (YamaT) 
- DQR update (Yuzurihara)
- lock loss study in the commissioning (YamaT, Yuzurihara) web 
- Update contents of summary page (Oshino)
- Related to segment files (Uchikata, Narikawa)
- pyCBC trigger list for O4a data (Narikawa and Uchikata)
- provide the CAT1 veto-definer file for IPC glitch (Uchikata)
 
 
- Announcement 
- Minutes - Commissioning
- Power outage at Kashiwa - Restart k1nds2 klog 
- May I ask the recovery the cache file and segment production after the data transfer was done?
- Segment production was stopped since 2/8?
 
- Summary page - Work on SummaryPages klog 
 
 
20250312 (Wed.)
- Agenda - Announcement - O4 schedule: - O4c: We are currently in O4c, and will end on 7 October 2025. 
- Run plan(02/15 updated) operation (02/27) - Maintenance/commissioning break from 1 April 2025 at 15:00 UTC to 4 June 2025 at 15:00 UTC
- O4 will end on 7 October 2025 at 15:00 UTC
 
 
- Scheduled conference - LVK meeting: 2025/03/24-27 @Albert Park, Melbourne, Australia - Early bird registration will close at 2025/01/31(extended).
 
- Open Data Workshop 2025/05/12-14
- GWADW 2025: 2025/05/18~5/23 @the Hilton Cocoa Beach (Florida) Oceanfront
- Amaldi & GR: 2025/07/14-18 @Scottish Exhibition Centre, Glasgow, UK web 
- ICRC 2025: 2025/07/15-24 @Geneva (Switzerland) web 
 
- LVK meeting: 2025/03/24-27 @Albert Park, Melbourne, Australia 
- KAGRA site report
- Condor setting at Kashiwa cluster (called system-B) will be updated not to occupy by single user and to reserve CPUs for high priority jobs
- FY2025 Budget Plan
- Next meeting: 2025/03/12
 
- O4 schedule: 
- Progress reports - Upgrade DetChar computers (YamaT) 
- DQR update (Yuzurihara)
- lock loss study in the commissioning (YamaT, Yuzurihara) web 
- Update contents of summary page (Oshino)
- Related to segment files (Uchikata, Narikawa)
- pyCBC trigger list for O4a data (Narikawa and Uchikata)
- provide the CAT1 veto-definer file for IPC glitch (Uchikata)
 
 
- Announcement 
- Minutes - Commissioning - lockloss investigation: 2025/03/05 UTC klog 
 
 
- Commissioning 
20250305 (Wed.)
- Agenda - Announcement - O4 schedule: - O4c: We are currently in O4c, and will end on 7 October 2025. 
- Run plan(02/15 updated) operation (02/27) - Maintenance/commissioning break from 1 April 2025 at 15:00 UTC to 4 June 2025 at 15:00 UTC
- O4 will end on 7 October 2025 at 15:00 UTC
 
 
- Scheduled conference - LVK meeting: 2025/03/24-27 @Albert Park, Melbourne, Australia - Early bird registration will close at 2025/01/31(extended).
 
- Open Data Workshop 2025/05/12-14
- GWADW 2025: 2025/05/18~5/23 @the Hilton Cocoa Beach (Florida) Oceanfront
- Amaldi & GR: 2025/07/14-18 @Scottish Exhibition Centre, Glasgow, UK web 
- ICRC 2025: 2025/07/15-24 @Geneva (Switzerland) web 
 
- LVK meeting: 2025/03/24-27 @Albert Park, Melbourne, Australia 
- KAGRA site report  - Milestone - 2/20 Implementation of the automatic 10 W PRFPMI DC opration by modifiing OMC LSC lock acquisition with the OMC LOCK guardian klog 
 
 
- Milestone 
- Condor setting at Kashiwa cluster (called system-B) will be updated not to occupy by single user and to reserve CPUs for high priority jobs
- FY2025 Budget Plan
- Next meeting: 2025/03/12
 
- O4 schedule: 
- Progress reports - Upgrade DetChar computers (YamaT) 
- DQR update (Yuzurihara)
- lock loss study in the commissioning (YamaT, Yuzurihara) web 
- Update contents of summary page (Oshino)
- Related to segment files (Uchikata, Narikawa)
- pyCBC trigger list for O4a data (Narikawa and Uchikata)
- provide the CAT1 veto-definer file for IPC glitch (Uchikata)
 
 
- Announcement 
- Minutes - Commissioning
- scattered light noise
 
20250226 (Wed.)
- Agenda - Announcement - O4 schedule: - O4c: We are currently in O4c, and will end on 7 October 2025. 
- Run plan(02/15 updated) operation (02/20) - Maintenance/commissioning break from 1 April 2025 at 15:00 UTC to 4 June 2025 at 15:00 UTC
- O4 will end on 7 October 2025 at 15:00 UTC
 
 
- Scheduled conference - LVK meeting: 2025/03/24-27 @Albert Park, Melbourne, Australia - Early bird registration will close at 2025/01/31(extended).
 
- Open Data Workshop 2025/05/12-14
- GWADW 2025: 2025/05/18~5/23 @the Hilton Cocoa Beach (Florida) Oceanfront
- Amaldi & GR: 2025/07/14-18 @Scottish Exhibition Centre, Glasgow, UK web 
- ICRC 2025: 2025/07/15-24 @Geneva (Switzerland) web 
 
- LVK meeting: 2025/03/24-27 @Albert Park, Melbourne, Australia 
- KAGRA site report 02/13 
- Condor setting at Kashiwa cluster (called system-B) will be updated not to occupy by single user and to reserve CPUs for high priority jobs
- Initial effort submission for KAGRA authorship 2025 started. The submission deadline is Friday February 21 (2025) 17:00 (JST). wiki 
- Next meeting: 2025/03/05
 
- O4 schedule: 
- Progress reports - Upgrade DetChar computers (YamaT) 
- DQR update (Yuzurihara)
- lock loss study in the commissioning (YamaT, Yuzurihara) web 
- Update contents of summary page (Oshino)
- Related to segment files (Uchikata, Narikawa)
- pyCBC trigger list for O4a data (Narikawa and Uchikata)
- provide the CAT1 veto-definer file for IPC glitch (Uchikata)
 
 
- Announcement 
- Minutes - Commissioning
- Segment
- veto definer file wiki - The question about "what is the necessary minimum duration for search pipeline?" was posted to DAC WG chairs  - X-pipeline: 64 s
- PySTAMPAS: 520 s
- stochastic search: 580 s
- CW: 512 s
- gstlal: O(100) s blocks
 
 
- The question about "what is the necessary minimum duration for search pipeline?" was posted to DAC WG chairs  
- Summary page - Modified configuration file of SummaryPage klog 
- Added links to the O4c IGWN SummaryPage klog 
 
 
20250219 (Wed.)
- Agenda - Announcement - O4 schedule: - O4c: We are currently in O4c, and will end on 7 October 2025. 
- Run plan(02/15 updated) operation (02/06) - Maintenance/commissioning break from 1 April 2025 at 15:00 UTC to 4 June 2025 at 15:00 UTC
- O4 will end on 7 October 2025 at 15:00 UTC
 
 
- Scheduled conference - openMMA telecon: 2025/02/20 (online, no pre-registration required) including update reports from lvk
- LVK meeting: 2025/03/24-27 @Albert Park, Melbourne, Australia - Early bird registration will close at 2025/01/31(extended).
 
- Open Data Workshop 2025/05/12-14
- GWADW 2025: 2025/05/18~5/23 @the Hilton Cocoa Beach (Florida) Oceanfront
- Amaldi & GR: 2025/07/14-18 @Scottish Exhibition Centre, Glasgow, UK web 
- ICRC 2025: 2025/07/15-24 @Geneva (Switzerland) web 
 
- KAGRA site report 02/13 
- Condor setting at Kashiwa cluster (called system-B) will be updated not to occupy by single user and to reserve CPUs for high priority jobs
- Initial effort submission for KAGRA authorship 2025 started. The submission deadline is Friday February 21 (2025) 17:00 (JST). wiki - confirm what activities you or your group plan to do this year in the KAGRA detchar
 
- Next meeting: 2025/02/26
 
- O4 schedule: 
- Progress reports - Upgrade DetChar computers (YamaT) 
- DQR update (Yuzurihara)
- lock loss study in the commissioning (YamaT, Yuzurihara) web 
- Update contents of summary page (Oshino)
- Related to segment files (Uchikata, Narikawa)
- pyCBC trigger list for O4a data (Narikawa and Uchikata)
- provide the CAT1 veto-definer file for IPC glitch (Uchikata)
 
 
- Announcement 
- Minutes - Commissioning - Addded ISC_WD_L label in lockloss guardian klog 
- Gauch update: Analysis will run when the LSC_LOCK guardian is more than OBSERVATION_WITHOUT_LINES klog 
- Reproduction of missing lockloss information klog32673 
- lockloss investigation: 2025/02/11 klog32686 
- lockloss investigation: 2025/02/10 klog32649 
- 60 - 100 Hz breathing sensitivity in current situation klog32647 
- Sensitivity breathing at 60-100 Hz: Glitch to MN or IM vertical actuators klog32628 
 
- Segment file - Reproduction of Segment files during 2025/02/8~10 klog32630 
 
- veto definer file wiki - The question about "what is the necessary minimum duration for search pipeline?" was posted to DAC WG chairs  - X-pipeline: 64 s
- PySTAMPAS: 520 s
- stochastic search: 580 s
 
 
- The question about "what is the necessary minimum duration for search pipeline?" was posted to DAC WG chairs  
- scattered light noise - Scattered light glitch at Yend klog32725 
 
- Hveto - Rerun Hveto process klog 
 
 
- Commissioning 
20250212 (Wed.)
- canceled
20250205 (Wed.)
- Agenda - Announcement - O4 schedule: - O4c: O4c will now end 7 October 2025. 
- Run plan(1/25 updated) operation (1/30) - Maintenance/commissioning break from 1 April 2025 at 15:00 UTC to 4 June 2025 at 15:00 UTC
- O4 will end on 7 October 2025 at 15:00 UTC
 
 
- Scheduled conference - LVK meeting: 2025/03/24-27 @Albert Park, Melbourne, Australia - Early bird registration will close at 2025/01/16.
 
- Open Data Workshop 2025/05/12-14
- GWADW 2025: 2025/05/18~5/23 @the Hilton Cocoa Beach (Florida) Oceanfront
- Amaldi & GR: 2025/07/14-18 @Scottish Exhibition Centre, Glasgow, UK web 
- ICRC 2025: 2025/07/15-24 @Geneva (Switzerland) web 
 
- LVK meeting: 2025/03/24-27 @Albert Park, Melbourne, Australia 
- KAGRA site report 01/28 - OMC DCPD B was broken. The protection system needs to be updated. Still, OMC DCPD A is alive. klog 
 
- The KAGRA's author list 2024 will be finalized today. The final vote by KSC members will be done tomorrow.
- Preparation of task list for KAGRA authorship 2025 is underway.
- The working chair of low-latency WG was taken over from S.Morisaki to Alvin.
- Next meeting: 2025/02/12
 
- O4 schedule: 
- Progress reports - Upgrade DetChar computers (YamaT) 
- DQR update (Yuzurihara)
- lock loss study in the commissioning (YamaT, Yuzurihara) web 
- Update contents of summary page (Oshino)
- Related to segment files (Uchikata, Narikawa)
- pyCBC trigger list for O4a data (Narikawa and Uchikata)
- provide the CAT1 veto-definer file for IPC glitch (Uchikata)
 
 
- Announcement 
- Minutes
20250129 (Wed.)
- Agenda - Announcement - O4 schedule: - O4c: O4c will now end 7 October 2025. 
- Run plan(1/25 updated) operation (1/23) - Maintenance/commissioning break from 1 April 2025 at 15:00 UTC to 4 June 2025 at 15:00 UTC
- O4 will end on 7 October 2025 at 15:00 UTC
 
 
- Scheduled conference - LVK meeting: 2025/03/24-27 @Albert Park, Melbourne, Australia - Early bird registration will close at 2025/01/16.
 
- Open Data Workshop 2025/05/12-14
- GWADW 2025: 2025/05/18~5/23 @the Hilton Cocoa Beach (Florida) Oceanfront
- Amaldi & GR: 2025/07/14-18 @Scottish Exhibition Centre, Glasgow, UK web 
- ICRC 2025: 2025/07/15-24 @Geneva (Switzerland) web 
 
- LVK meeting: 2025/03/24-27 @Albert Park, Melbourne, Australia 
- KAGRA site report 01/14 
- Evaluation of effort for KAGRA authorship 2024 is underway.
- Several visitors at the KAGRA site during January
- Next meeting: 2025/02/05
 
- O4 schedule: 
- Progress reports - Upgrade DetChar computers (YamaT) 
- DQR update (Yuzurihara)
- lock loss study in the commissioning (YamaT, Yuzurihara) web 
- Update contents of summary page (Oshino)
- Related to segment files (Uchikata, Narikawa)
- pyCBC trigger list for O4a data (Narikawa and Uchikata)
- provide the CAT1 veto-definer file for IPC glitch (Uchikata)
 
 
- Announcement 
- Minutes - Commissioning
- Summary page - Modified the configuration files of DET tools klog 
 
- Omegascan
- Scattered light noise
- Pastavi - adjusting the number of images, backup of NoiseBudget data, and trend data in plotting multiple channels klog 
 
- line monitoring (Samurai) - (yamat) It's better to change the definition of the locked data from K1:GRD-IFO_STATE_N >= 100 to K1:GRD-LSC_LOCK_STATE_N >= 9900. 
 
- veto definer file (Uchikata) - The histogram was updated.
- They compared the results by removing T<256s or T<512s. Some short segments are not related to the occurrence of the IPC glitch. 
 
 
20250122 (Wed.)
- Agenda - Announcement - O4b schedule: - O4b: O4b will now end 9 June 2025. 
 
- Scheduled conference - LVK meeting: 2024/03/24-27 @Albert Park, Melbourne, Australia - Early bird registration will close at 2025/01/16.
 
- Open Data Workshop 2024/05/12-14
- GWADW 2025: 2024/05/18~5/23 @the Hilton Cocoa Beach (Florida) Oceanfront
- Amaldi & GR: 2024/07/14-18 @Scottish Exhibition Centre, Glasgow, UK web 
- ICRC 2025: 2024/07/15-24 @Geneva (Switzerland) web 
 
- LVK meeting: 2024/03/24-27 @Albert Park, Melbourne, Australia 
- KAGRA site report 01/14 
- Evaluation of effort for KAGRA authorship 2024 is underway.
- Several visitors at the KAGRA site during January
- Next meeting: 2025/01/29
 
- O4b schedule: 
- Progress reports - Upgrade DetChar computers (YamaT) 
- DQR update (Yuzurihara)
- lock loss study in the commissioning (YamaT, Yuzurihara) web 
- Update contents of summary page (Oshino)
- Related to segment files (Uchikata, Narikawa)
- pyCBC trigger list for O4a data (Narikawa and Uchikata)
- provide the CAT1 veto-definer file for IPC glitch (Uchikata)
 
 
- Announcement 
- Minutes - Commissioning - lockloss investigation: 2024/12/31 klog 
- lockloss investigation: 2024/12/21~12/30 klog 
- Noise budget plot for the DARM sensitivity in November 2024 klog 
- New DARM sensitivity (2025/01/19) klog 
- Add a duration of staying in the last state to the lockloss list klog web - Lock duration was added to the lockloss summary page. It’s better to use a rough estimate.
- Is it possible to show the truncated value as an integer? --> yes 
 
 
- Summary page - Modified the configuration files of DET tools klog 
- Changed the plotting range of range plots klog 
- The Summary page shows two kinds of inspiral range values, which are values computed by YamaT-san's script and gwsumm. There are some differences due to different configurations. In the future, it's better to clarify the cause of the difference between the two values
 
- Segment file
- Scattered light noise - Scattered light noise reoprt: ASD of OPTLV channels and 2024.12.13 data klog 
 
- Noise subtraction of beam jitter noise around 120 Hz
 
- Commissioning 
20250115 (Wed.)
- Agenda - Announcement - O4b schedule: - O4b: O4b will now end 9 June 2025. 
 
- Scheduled conference - LVK meeting: 2024/03/24-27 @Albert Park, Melbourne, Australia - Early bird registration will close at 2025/01/16.
 
- Open Data Workshop 2024/05/12-14
- GWADW 2025: 2024/05/18~5/23 @the Hilton Cocoa Beach (Florida) Oceanfront
- Amaldi & GR: 2024/07/14-18 @Scottish Exhibition Centre, Glasgow, UK web 
- ICRC 2025: 2024/07/15-24 @Geneva (Switzerland) web 
 
- LVK meeting: 2024/03/24-27 @Albert Park, Melbourne, Australia 
- KAGRA site report 12/11 
- Evaluation of effort for KAGRA authorship 2024 is underway.
- Several visitors at the KAGRA site during January
- Power outage around the KAGRA site --> no impact for KAGRA 
- Mail server issue, from January 10th, 21:09 to January 11th, 22:56 JST
- Next meeting: 2025/01/22
 
- O4b schedule: 
- Progress reports - Upgrade DetChar computers (YamaT) 
- DQR update (Yuzurihara)
- lock loss study in the commissioning (YamaT, Yuzurihara) web 
- Update contents of summary page (Oshino)
- Related to segment files (Uchikata, Narikawa)
- pyCBC trigger list for O4a data (Narikawa and Uchikata)
- provide the CAT1 veto-definer file for IPC glitch (Uchikata)
 
 
- Announcement 
- Minutes - Commissioning support
- Line Monitor - Automation of the daily monitor for identifying and fitting the line noise klog 
 
- Segment file - The segment name of the IPC glitch was changed from K1-DAQ-IPC_ERROR to K1-DAQ_IPC_ERROR. klog 
- Due to IPC glitch, the locked segment will be devided into short segments. They evaluated the fraction of the short segments. The actual threshold is necessary to be determined in future. slide 
- The current favor is 256 s. When we applied this threshold, we will exclude 1% data from the science mode. We need to collect the requirements of each pipeline.
 
 - Noise subtraction pipelines (Chia-Jui Chou) - deepclean (Chia-Jui Chou) - run at kamioka
 
- seqARIMA (David Hui, Sangin Kim) - run at kashiwa
 
- ICA (Kume, Itoh, Yokoyama)
- The common goal is to subtract the noise.
- it's important to test the long term stability.
 
- deepclean (Chia-Jui Chou) 
 
20250108 (Wed.)
- Agenda - Announcement - O4b schedule: - O4b: O4b will now end 9 June 2025. 
 
- Scheduled conference - LVK meeting: 2024/03/24-27 @Albert Park, Melbourne, Australia - Early bird registration will close at 2025/01/16.
 
- Open Data Workshop 2024/05/12-14
- GWADW 2025: 2024/05/18~5/23 @the Hilton Cocoa Beach (Florida) Oceanfront
- Amaldi & GR: 2024/07/14-18 @Scottish Exhibition Centre, Glasgow, UK web 
- ICRC 2025: 2024/07/15-24 @Geneva (Switzerland) web 
 
- LVK meeting: 2024/03/24-27 @Albert Park, Melbourne, Australia 
- KAGRA site report 12/11 - For the summary during holidays, see Miyoki-san's mail.
 
- Evaluation of effort for KAGRA authorship 2024 is underway.
- Several visiters at KAGRA site during January
- Next meeting: 2025/01/15
 
- O4b schedule: 
- Progress reports - Upgrade DetChar computers (YamaT) 
- DQR update (Yuzurihara)
- lock loss study in the commissioning (YamaT, Yuzurihara) web 
- Update contents of summary page (Oshino)
- Related to segment files (Uchikata, Narikawa)
- pyCBC trigger list for O4a data (Narikawa and Uchikata)
- provide the CAT1 veto-definer file for IPC glitch (Uchikata)
 
 
- Announcement 
- Minutes - Commissioning support
- Segment file - The segment of K1-GRD_PEM_EARTHQUAKE is already available on DQSEGDB. For other new segments will be available at DQSEGDB. (git issue) 
- Name convention issue came up. Plan: K1-DAQ-IPC_ERROR --> K1-DAQ_IPC_ERROR. Before releasing this segment, we have a chance to change the name. 
- We need to update other scripts if we change the segment name. Developers or maintainers, please check your code.
 
- It's better to keep the code in the GitHub repository up-to-date. Remember to push the code after you modified it or confirmed it's stable. 
- The line monitor is working well during the holidays. web 
 