Differences between revisions 20 and 316 (spanning 296 versions)
Revision 20 as of 2019-03-28 08:59:16
Size: 1621
Comment:
Revision 316 as of 2022-02-07 13:29:04
Size: 2415
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
  * Meeting time: 14:00-15:00 JST/KST on every Thursday
  * Meeting room: Zoom3 (https://zoom.us/j/5045179604)
  * Meeting time: 13:00-13:30 JST/KST on every Monday
  * Meeting room: Zoom

<<TableOfContents(
3)>>
Line 6: Line 8:
=== 20190328 (Thu.) === == Agenda & Minutes ==
Line 8: Line 10:
=== 20220207 (Mon.) ===
  * Agenda
    * 120Hz glitches
    * Report from [[https://wiki.ligo.org/DetChar/JanFeb2022DetCharF2F|LIGO Detchar F2F Meeting]]
    * DQ flags for O4
    * progress of DQR
  * Minutes
    * 120Hz glitches
      * No updates
    * DQ flags for O4
      * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13851|slide]]
      * (Yuzurihara) read BLRMS data and made the several plots with 1% and 99% percentile.
      * When KAGRA will be locked as a?
       * hopefully after july, there will be lock trial for two monthes(?)
      * When you set the 1% criteria, always you throw away the 1% data?
       * We might need to consider the better procedure to care that point.
    * progress of DQR
      * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=19671|klog#19671]]
Line 9: Line 29:
=== 20190322 (Fri.) ===
  * --(Zoom3)-- -> Zoom2 (https://zoom.us/j/6676627462)
-----
=== 20220131 (Mon.) ===
Line 12: Line 32:
    * f2f talk
      * 1 slot (Status talk -> T. Yamamoto)
      * DAC satellite [?]
    * Task list in next week
      * Sharing the current situation of SummaryPage
      * Preparing k1det0/1
      * Managing SDF for VIS
      * Installing LIGO's tools and KGWG's tools
    * Task list of engineering run
      * Providing glitch information: (t, f, SNR)
      * Providing line information: (f, df, Amplitude, noise source)
      * Preparing the information server
    * hveto and glitch identification (Pil-Jong & Kokeyama)
      * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9984|PMC important channel list]]
      * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9258|Glitch analysis presented in JPS]]
    * 120Hz glitches
    * Report from DQR hackathon
    * DQ flags for O4
    * Master thesis (Morisue-san)
Line 28: Line 37:
-----
=== 20220117 (Mon.) ===
  * Agenda
    * 120Hz glitches
    * ITMX glitches
    * DQR progress
    * DQ flags for O4
  * Minutes
    * 120Hz glitches
      * No updates
      * Next step is coincidence search with signals around ETMY including local control sensors.
    * ITMX glitches
      * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=19212|klog#19212]]
      * K1:VIS-ITMX_F3_LVDTINF_GAS_{IN1,OUT} have glitches.
      * It seems to occur around AA chassis. (AA and cable replacement didn't help to improve situation).
      * We will try to find glitches on other channels on the same ADC board.
      * This channel should be added to Omicron search on SummaryPages.
    * DQR progress
      * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13721|JGW-G2213721]]
    * DQ flags for O4
      * No updates
    * O3GK paper
      * Threshold used for computing a glitch rate was changed as SNR=6.5.
      * It's a same criterion with LIGO, and Virgo.
      * Both GEO and KAGRA's results are now computed and draft was also updated.
Line 29: Line 63:
=== 20190314 ===
  * Skipped due to the JPS meeting

=== 20190307 ===
  * Agenda
    * Task list of engineering run on May
    * Tools and results from KGWG
    * Summary Page isseus
    * f2f talk

=== 20190228 ===
  * Meeting room
    * Zoom3 (https://zoom.us/j/5045179604)
  * Agenda
    * Magnetic coupling proposal with LV (Jishnu)
    * Enhancement of SummaryPage
    * Data sharing between Kamioka, Kashiwa, and KISTI
    * Young-Min's trip
  * Slide
    * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9903|yamat]]
-----
=== Past meeting ===
  * [[KAGRA/Subgroups/DET/Meeting/2021|2021]]
  * [[KAGRA/Subgroups/DET/Meeting/2020|2020]]
  * [[KAGRA/Subgroups/DET/Meeting/2019|2019]]

Meetings

  • Meeting time: 13:00-13:30 JST/KST on every Monday
  • Meeting room: Zoom


Agenda & Minutes

20220207 (Mon.)

  • Agenda
  • Minutes
    • 120Hz glitches
      • No updates
    • DQ flags for O4
      • slide

      • (Yuzurihara) read BLRMS data and made the several plots with 1% and 99% percentile.
      • When KAGRA will be locked as a?
        • hopefully after july, there will be lock trial for two monthes(?)
      • When you set the 1% criteria, always you throw away the 1% data?
        • We might need to consider the better procedure to care that point.
    • progress of DQR


20220131 (Mon.)

  • Agenda
    • 120Hz glitches
    • Report from DQR hackathon
    • DQ flags for O4
    • Master thesis (Morisue-san)


20220117 (Mon.)

  • Agenda
    • 120Hz glitches
    • ITMX glitches
    • DQR progress
    • DQ flags for O4
  • Minutes
    • 120Hz glitches
      • No updates
      • Next step is coincidence search with signals around ETMY including local control sensors.
    • ITMX glitches
      • klog#19212

      • K1:VIS-ITMX_F3_LVDTINF_GAS_{IN1,OUT} have glitches.
      • It seems to occur around AA chassis. (AA and cable replacement didn't help to improve situation).
      • We will try to find glitches on other channels on the same ADC board.
      • This channel should be added to Omicron search on SummaryPages.

    • DQR progress
    • DQ flags for O4
      • No updates
    • O3GK paper
      • Threshold used for computing a glitch rate was changed as SNR=6.5.
      • It's a same criterion with LIGO, and Virgo.
      • Both GEO and KAGRA's results are now computed and draft was also updated.


Past meeting

KAGRA/Subgroups/DET/Meeting (last edited 2024-10-30 17:20:31 by HirotakaYuzurihara)