1664
Comment:
|
2905
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* Meeting time: 14:00-15:00 JST/KST on every Thursday * Meeting room: Zoom3 (https://zoom.us/j/5045179604) |
* Meeting time: 13:00-13:30 JST/KST on every Monday * Meeting room: Zoom <<TableOfContents(3)>> |
Line 6: | Line 8: |
=== 20190328 (Thu.) === | == Agenda & Minutes == === 20220228 (Mon.) === |
Line 8: | Line 12: |
* Progress of Kamioka works | * 120Hz glitches * DQ flags for O4 * progress of DQR |
Line 10: | Line 16: |
=== 20190322 (Fri.) === * --(Zoom3)-- -> Zoom2 (https://zoom.us/j/6676627462) |
=== 20220221 (Mon.) === |
Line 13: | Line 18: |
* f2f talk * 1 slot (Status talk -> T. Yamamoto) * DAC satellite [?] * Task list in next week * Sharing the current situation of SummaryPage * Preparing k1det0/1 * Managing SDF for VIS * Installing LIGO's tools and KGWG's tools * Task list of engineering run * Providing glitch information: (t, f, SNR) * Providing line information: (f, df, Amplitude, noise source) * Preparing the information server * hveto and glitch identification (Pil-Jong & Kokeyama) * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9984|PMC important channel list]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9258|Glitch analysis presented in JPS]] |
* 120Hz glitches * DQ flags for O4 * progress of DQR |
Line 29: | Line 22: |
* Minutes * 120Hz glitches * No updates * DQ flags for O4 * No updates * progress of DQR * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=19847|klog#19847]] * Proposal new tool to see past data by NDS (Darkhan) |
|
Line 30: | Line 31: |
=== 20190314 === * Skipped due to the JPS meeting |
----- === 20220207 (Mon.) === * Agenda * 120Hz glitches * Report from [[https://wiki.ligo.org/DetChar/JanFeb2022DetCharF2F|LIGO Detchar F2F Meeting]] * DQ flags for O4 * progress of DQR * Minutes * 120Hz glitches * No updates * DQ flags for O4 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13851|slide]] * (Yuzurihara) read BLRMS data and made the several plots with 1% and 99% percentile. * When KAGRA will be locked as observation mode? * hopefully after july, there will be lock trial for two monthes(?) * When you set the 1% criteria, always you throw away the 1% data? * We might need to consider the better procedure to care that point. * progress of DQR * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=19671|klog#19671]] |
Line 33: | Line 51: |
=== 20190307 === | ----- === 20220131 (Mon.) === |
Line 35: | Line 54: |
* Task list of engineering run on May * Tools and results from KGWG * Summary Page isseus * f2f talk |
* 120Hz glitches * Report from DQR hackathon * DQ flags for O4 * Master thesis (Morisue-san) |
Line 40: | Line 59: |
=== 20190228 === * Meeting room * Zoom3 (https://zoom.us/j/5045179604) |
----- === 20220117 (Mon.) === |
Line 44: | Line 62: |
* Magnetic coupling proposal with LV (Jishnu) * Enhancement of SummaryPage * Data sharing between Kamioka, Kashiwa, and KISTI * Young-Min's trip * Slide * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9903|yamat]] |
* 120Hz glitches * ITMX glitches * DQR progress * DQ flags for O4 * Minutes * 120Hz glitches * No updates * Next step is coincidence search with signals around ETMY including local control sensors. * ITMX glitches * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=19212|klog#19212]] * K1:VIS-ITMX_F3_LVDTINF_GAS_{IN1,OUT} have glitches. * It seems to occur around AA chassis. (AA and cable replacement didn't help to improve situation). * We will try to find glitches on other channels on the same ADC board. * This channel should be added to Omicron search on SummaryPages. * DQR progress * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13721|JGW-G2213721]] * DQ flags for O4 * No updates * O3GK paper * Threshold used for computing a glitch rate was changed as SNR=6.5. * It's a same criterion with LIGO, and Virgo. * Both GEO and KAGRA's results are now computed and draft was also updated. ----- === Past meeting === * [[KAGRA/Subgroups/DET/Meeting/2021|2021]] * [[KAGRA/Subgroups/DET/Meeting/2020|2020]] * [[KAGRA/Subgroups/DET/Meeting/2019|2019]] |
Meetings
- Meeting time: 13:00-13:30 JST/KST on every Monday
- Meeting room: Zoom
Contents
Agenda & Minutes
20220228 (Mon.)
- Agenda
- 120Hz glitches
- DQ flags for O4
- progress of DQR
20220221 (Mon.)
- Agenda
- 120Hz glitches
- DQ flags for O4
- progress of DQR
- Minutes
- 120Hz glitches
- No updates
- DQ flags for O4
- No updates
- progress of DQR
- Proposal new tool to see past data by NDS (Darkhan)
- 120Hz glitches
20220207 (Mon.)
- Agenda
- 120Hz glitches
Report from LIGO Detchar F2F Meeting
- DQ flags for O4
- progress of DQR
- Minutes
- 120Hz glitches
- No updates
- DQ flags for O4
- (Yuzurihara) read BLRMS data and made the several plots with 1% and 99% percentile.
- When KAGRA will be locked as observation mode?
- hopefully after july, there will be lock trial for two monthes(?)
- When you set the 1% criteria, always you throw away the 1% data?
- We might need to consider the better procedure to care that point.
- progress of DQR
- 120Hz glitches
20220131 (Mon.)
- Agenda
- 120Hz glitches
- Report from DQR hackathon
- DQ flags for O4
- Master thesis (Morisue-san)
20220117 (Mon.)
- Agenda
- 120Hz glitches
- ITMX glitches
- DQR progress
- DQ flags for O4
- Minutes
- 120Hz glitches
- No updates
- Next step is coincidence search with signals around ETMY including local control sensors.
- ITMX glitches
- K1:VIS-ITMX_F3_LVDTINF_GAS_{IN1,OUT} have glitches.
- It seems to occur around AA chassis. (AA and cable replacement didn't help to improve situation).
- We will try to find glitches on other channels on the same ADC board.
This channel should be added to Omicron search on SummaryPages.
- DQR progress
- DQ flags for O4
- No updates
- O3GK paper
- Threshold used for computing a glitch rate was changed as SNR=6.5.
- It's a same criterion with LIGO, and Virgo.
- Both GEO and KAGRA's results are now computed and draft was also updated.
- 120Hz glitches