Differences between revisions 25 and 31 (spanning 6 versions)
Revision 25 as of 2019-04-04 00:56:17
Size: 2266
Comment:
Revision 31 as of 2019-04-11 13:54:13
Size: 2922
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
=== 20190411 (Thu.) ===
  * Agenda
    * SDF flags preparation [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9228|slide]]
    * Fscan on SummaryPage
    * DetChar computers
    * Tool development
Line 10: Line 17:
      * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10029|ckozakai]]
Line 11: Line 19:
      * hveto
        * There are some bugs on the latest version of hveto.
        * Old version of hveto was installed in k1sumX and will be installed in k1det0.
      * Fscan
        * Automation of the Scan is already succeeded.
        * We found a bug in our cache generation system and start to fix this bug.

Meetings


20190411 (Thu.)

20190404 (Thu.)

  • Agenda
    • IMC run (3/29-3/31, 4/3-4/4)
    • Progress of Kamioka works
      • hveto
        • There are some bugs on the latest version of hveto.
        • Old version of hveto was installed in k1sumX and will be installed in k1det0.
      • Fscan
        • Automation of the Scan is already succeeded.
        • We found a bug in our cache generation system and start to fix this bug.

20190328 (Thu.)

  • Agenda
    • Progress of Kamioka works
      • Fscan run on test computer by manually.
      • For automating and integrating to SummaryPage, we need to generate Segment file in automatically.

      • We need to consider how to pick up line information and list up it from FScan results.
      • Automation of hveto on KISTI is succeeded with PMC error signal and PEM channels.
      • We start to install hveto on hveto@k1sumX.

20190322 (Fri.)

  • Zoom3 -> Zoom2 (https://zoom.us/j/6676627462)

  • Agenda
    • f2f talk
      • 1 slot (Status talk -> T. Yamamoto)

      • DAC satellite [?]
    • Task list in next week
      • Sharing the current situation of SummaryPage

      • Preparing k1det0/1
      • Managing SDF for VIS
      • Installing LIGO's tools and KGWG's tools
    • Task list of engineering run
      • Providing glitch information: (t, f, SNR)
      • Providing line information: (f, df, Amplitude, noise source)
      • Preparing the information server
    • hveto and glitch identification (Pil-Jong & Kokeyama)

20190314

  • Skipped due to the JPS meeting

20190307

  • Agenda
    • Task list of engineering run on May
    • Tools and results from KGWG
    • Summary Page isseus
    • f2f talk

20190228