Differences between revisions 317 and 401 (spanning 84 versions)
Revision 317 as of 2022-02-20 22:33:21
Size: 2522
Comment:
Revision 401 as of 2022-03-28 16:07:25
Size: 11894
Comment:
Deletions are marked like this. Additions are marked like this.
Line 10: Line 10:
-----
=== 20220328 (Mon.) ===
  * Agenda
    * Announcement
     * DQR design document, put comments on [[https://git.ligo.org/detchar/o4-data-quality-report-design-document/-/issues?label_name%5B%5D=Second+circulation|git issue]]
     * Workshop 2022/04/15 [[https://indico.in2p3.fr/event/26414/program|Workshop on the development of innovative tools for new collaborations within gravitational wave detection experiments]]
    * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012]
    * Activity report by students from Aoyama Gakuin univ.
     * glitch investigation related to IMMT1 oplev (Aoyama Gakuin univ.)
     * Tcam image analysis to identify mirror location and center (Aoyama Gakuin univ.)
    * DQR update
    * Update of summary page
    * 120Hz glitches investigation during O3GK

 * Minutes
  * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012]
   * YamaT constructed the test environment in local computer
   * Although YamaT is copying the environment to DetChar computers, it is very slow. (speed ~ 250KB/s)
   * After copying, YamaT will work on modification of codes to fit KAGRA data, such as nds2.py
   * For testing the tools (Omicron, Hveto...), we need volunteers, especially remote site!
  * Activity report by students from Aoyama Gakuin univ.
   * five students and two staff members from Aoyama Gakuin univ. stayed Kamioka site during last three weeks.
   * They helped commissioning work both in tunnel [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20124|klog#20124]] [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20155|klog#20155]] and in control room.
   * several code developments to understand glitch cause have been done. [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20026|klog#20026]] [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20027|klog#20027]]
   * code development to identify mirror center of ITMX have been done by using image analysis. [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14003|slide(Japanese)]] [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20036|klog#20036]] [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20198|klog20198]] [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20203|klog#20203]]
  * DQR update
   * Joe updated Task Manager. Yuzurihara will install new version and test it.
  * Update of summary page
   * no update
  * 120Hz glitches investigation during O3GK
   * no update

-----
=== 20220307 (Mon.) ===
  * Agenda
    * announcement
     * LVK meeting March 2022 [[https://wiki.ligo.org/LSC/Meeting/LVKMeetingMarch2022|wiki]] [[https://cgca.uwm.edu/events/2021lvk|web]]
      * registration is available
    * 120Hz glitches investigation during O3GK
    * unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012]
    * DQ flags for O4
    * DQR update
    * glitch investigation related to IMMT1 oplev
 * Minutes
    * 120Hz glitches investigation during O3GK
     * no update
    * unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012]
     * YamaT is working on this project at test-server.
     * Test of new conda environment will start from next week (after JPS meeting)
    * DQ flags for O4
     * no update
    * DQR update
     * Joe is developing the code to connect between igwn-alert and TaskManager. It will be available soon.
     * Schedule for review
      * Review of Task Manager will be done before review of each task.
      * High priority task needs to complete before Aug. 2022
      * Low priority task needs to complete before Nov. 2022
    * glitch investigation related to IMMT1 oplev
     * From March 8, students from Aoyama Gakuin univ. stayed at Kamioka
     * They worked on the investigation of glitch. [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20026|klog#20026]][[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20027|klog#20027]]
     * They checked IMMT1 QPD signals and PRM suspension signals at the time of glitch.
    * NDS2 tool development (Darkhan)
     * no major update.
    * GPS accuracy monitor (Oshino)
     * is available on [[https://gwdet.icrr.u-tokyo.ac.jp/~controls/summary/day/20220313/detchar/gps/|summary page]]
     * Current difference is acceptable and reasonable.
    * No meeting on March 21 due to Japanese holiday. Next meeting is planed on March 28.

-----
=== 20220307 (Mon.) ===
  * Agenda
    * announcement
     * RRT plan during O4 [[https://dcc.ligo.org/G2200220|slide]]
     * LVK meeting March 2022 [[https://wiki.ligo.org/LSC/Meeting/LVKMeetingMarch2022|wiki]] [[https://cgca.uwm.edu/events/2021lvk|web]]
      * registration is available
    * 120Hz glitches investigation during O3GK
    * unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012] (YamaT)
    * DQ flags for O4
    * DQR update
  * Minutes (Yuzurihara)
   * 120Hz glitches investigation during O3GK
    * no update
   * unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012] (YamaT)
    * There are many computers/workstations in Kamioka site or Kamioka control room.
    * Workstations (k1ctr*) use common conda environment by mounting the file server.
    * In DetChar computers k1{sum,det}[01], conda environment should be unified all DetChar resources, similar to workstations.
    * To prevent the trouble that DetChar experts might break the environment, the conda environments will be set as read-only permission.
    * Installation will be done by Kamioka members. After that, we need volunteers to test the DetChar tools on new conda environment.
    * what is the time line?
     * Installation will finished before the end of March. From April, the test will start. Volunteers are helpful.
   * DQ flags for O4
    * In last PEM meeting, Yuzurihara presented the current status and received the helpful comments. [slide](https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13970)
    * We will change our plan to construct the data quality flag and will compute the BLRMS of gwpy to set the threshold.
    * The review is necessary before O4. (probably very close to O4, because we need ER)
   * DQR update
    * no update
   * Commissioning of GreenX
    * In the last weekend, the commissioner tried continuous GreenX. During that trials, they found many short term lock loss (~10 ms). 10 ms is too short to follow the suspension motion, so it is likely that there are some causes of the lock loss except for the suspension motion.
    * The commissioner needs helps DetChar members to identify the cause or give a hint of the cause.
    * For details, see [[https://klog.icrr.u-tokyo.ac.jp/osl/index.php?r=19963|klog#19963]] [[https://klog.icrr.u-tokyo.ac.jp/osl/index.php?r=19983|klog#19983]]
    * main channel K1:TMS-X_GR_PDA1_OUT_DQ
    * time : 2022 Mar 06 23:37:50 UTC = 2022 Mar 07 8:37:50 JST = GPS time 1330645088


-----
=== 20220228 (Mon.) ===
  * Agenda
    * 120Hz glitches
    * DQ flags for O4
    * progress of DQR
    * lock loss study of GreenX

  * Minutes (Yuzurihara)
    * accouncement
     * LVK meeting March 2022 [[https://wiki.ligo.org/LSC/Meeting/LVKMeetingMarch2022|wiki]] [[https://cgca.uwm.edu/events/2021lvk|web]]
      * registration is available
      * Wed, 17 March 2021:
       * Plenary Session #1 (09:00-10:30 US/CDT) (=3/16 23:00 JST)
       * Paper Presentation Session #1
       * Plenary Session #2 (16:00-17:30 US/CDT) (=3/17 6:00 JST)
      * Thu, 18 March 2021:
       * Plenary Session #3 (09:00-10:30 US/CDT) (=3/17 23:00 JST)
       * Paper Presentation Session #2
       * Plenary Session #4 (16:00-17:30 US/CDT) (=3/18 6:00 JST)
     * Pastavi server will be unavailable tonight
       * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=19913|klog#19913]]
    * 120Hz glitches
     * no update
    * DQ flags for O4
     * no update
    * progress of DQR
     * igwn-alert is running more than 9days and receiving the MDC alert
     * next step is to connect the MDC alert with the launch TaskManager.
     * remained task is to develop InspiralRange [[https://git.ligo.org/detchar/dqrtasks/-/issues/8|issue]]
    * lock loss study of GreenX
     * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=19906|klog#19906]]
     * From the Hveto result, the channel (K1:IMC-SERVO_MIXER_DAQ_OUT_DQ) was the most coincident channel with the lock loss of GreenX.
    * unify the detchar computing environment (YamaT)
     * scattered codes and applications (Omicron, summary page, ) over Kamioka computers are troubling.
     * we plan to unify the environment by using igwn conda
     * detail will be reported in next meeting
     * (Darkhan) conda environment on k1ctr*. someone accidentally update someone's conda environment. administrator should prepare the conda environment?
     * (YamaT) k1ctr* share the environment. this activity is not related to k1ctr* but k1sum[01], k1det[012]. we should separate the user environment and the environment for the DET tools
     * (Darkhan) should avoid accidental mistake.

-----
Line 11: Line 157:
* Agenda
  * 120Hz glitches
  * DQ flags for O4
  * progress of DQR
  * Agenda
    * 120Hz glitches
    * DQ flags for O4
    * progress of DQR

  * Minutes
    * 120Hz glitches
      * No updates
    * DQ flags for O4
      * No updates
    * progress of DQR
      * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=19847|klog#19847]]
    * Proposal new tool to see past data by NDS (Darkhan)
Line 29: Line 184:
      * When KAGRA will be locked as a?       * When KAGRA will be locked as observation mode?

Meetings

  • Meeting time: 13:00-13:30 JST/KST on every Monday
  • Meeting room: Zoom


Agenda & Minutes


20220328 (Mon.)

  • Minutes
    • Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012]
      • YamaT constructed the test environment in local computer
      • Although YamaT is copying the environment to DetChar computers, it is very slow. (speed ~ 250KB/s)

      • After copying, YamaT will work on modification of codes to fit KAGRA data, such as nds2.py
      • For testing the tools (Omicron, Hveto...), we need volunteers, especially remote site!
    • Activity report by students from Aoyama Gakuin univ.
      • five students and two staff members from Aoyama Gakuin univ. stayed Kamioka site during last three weeks.
      • They helped commissioning work both in tunnel klog#20124 klog#20155 and in control room.

      • several code developments to understand glitch cause have been done. klog#20026 klog#20027

      • code development to identify mirror center of ITMX have been done by using image analysis. slide(Japanese) klog#20036 klog20198 klog#20203

    • DQR update
      • Joe updated Task Manager. Yuzurihara will install new version and test it.
    • Update of summary page
      • no update
    • 120Hz glitches investigation during O3GK
      • no update


20220307 (Mon.)

  • Agenda
    • announcement
      • LVK meeting March 2022 wiki web

        • registration is available
    • 120Hz glitches investigation during O3GK
    • unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012]
    • DQ flags for O4
    • DQR update
    • glitch investigation related to IMMT1 oplev
  • Minutes
    • 120Hz glitches investigation during O3GK
      • no update
    • unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012]
      • YamaT is working on this project at test-server.
      • Test of new conda environment will start from next week (after JPS meeting)
    • DQ flags for O4
      • no update
    • DQR update
      • Joe is developing the code to connect between igwn-alert and TaskManager. It will be available soon.

      • Schedule for review
        • Review of Task Manager will be done before review of each task.
        • High priority task needs to complete before Aug. 2022
        • Low priority task needs to complete before Nov. 2022
    • glitch investigation related to IMMT1 oplev
      • From March 8, students from Aoyama Gakuin univ. stayed at Kamioka
      • They worked on the investigation of glitch. klog#20026klog#20027

      • They checked IMMT1 QPD signals and PRM suspension signals at the time of glitch.
    • NDS2 tool development (Darkhan)
      • no major update.
    • GPS accuracy monitor (Oshino)
      • is available on summary page

      • Current difference is acceptable and reasonable.
    • No meeting on March 21 due to Japanese holiday. Next meeting is planed on March 28.


20220307 (Mon.)

  • Agenda
    • announcement
      • RRT plan during O4 slide

      • LVK meeting March 2022 wiki web

        • registration is available
    • 120Hz glitches investigation during O3GK
    • unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012] (YamaT)
    • DQ flags for O4
    • DQR update
  • Minutes (Yuzurihara)
    • 120Hz glitches investigation during O3GK
      • no update
    • unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012] (YamaT)
      • There are many computers/workstations in Kamioka site or Kamioka control room.
      • Workstations (k1ctr*) use common conda environment by mounting the file server.
      • In DetChar computers k1{sum,det}[01], conda environment should be unified all DetChar resources, similar to workstations.

      • To prevent the trouble that DetChar experts might break the environment, the conda environments will be set as read-only permission.

      • Installation will be done by Kamioka members. After that, we need volunteers to test the DetChar tools on new conda environment.

      • what is the time line?
        • Installation will finished before the end of March. From April, the test will start. Volunteers are helpful.
    • DQ flags for O4
    • DQR update
      • no update
    • Commissioning of GreenX
      • In the last weekend, the commissioner tried continuous GreenX. During that trials, they found many short term lock loss (~10 ms). 10 ms is too short to follow the suspension motion, so it is likely that there are some causes of the lock loss except for the suspension motion.
      • The commissioner needs helps DetChar members to identify the cause or give a hint of the cause.

      • For details, see klog#19963 klog#19983

      • main channel K1:TMS-X_GR_PDA1_OUT_DQ
      • time : 2022 Mar 06 23:37:50 UTC = 2022 Mar 07 8:37:50 JST = GPS time 1330645088


20220228 (Mon.)

  • Agenda
    • 120Hz glitches
    • DQ flags for O4
    • progress of DQR
    • lock loss study of GreenX
  • Minutes (Yuzurihara)
    • accouncement
      • LVK meeting March 2022 wiki web

        • registration is available
        • Wed, 17 March 2021:
          • Plenary Session #1 (09:00-10:30 US/CDT) (=3/16 23:00 JST)
          • Paper Presentation Session #1
          • Plenary Session #2 (16:00-17:30 US/CDT) (=3/17 6:00 JST)
        • Thu, 18 March 2021:
          • Plenary Session #3 (09:00-10:30 US/CDT) (=3/17 23:00 JST)
          • Paper Presentation Session #2
          • Plenary Session #4 (16:00-17:30 US/CDT) (=3/18 6:00 JST)
      • Pastavi server will be unavailable tonight
    • 120Hz glitches
      • no update
    • DQ flags for O4
      • no update
    • progress of DQR
      • igwn-alert is running more than 9days and receiving the MDC alert
      • next step is to connect the MDC alert with the launch TaskManager.

      • remained task is to develop InspiralRange issue

    • lock loss study of GreenX
      • klog#19906

      • From the Hveto result, the channel (K1:IMC-SERVO_MIXER_DAQ_OUT_DQ) was the most coincident channel with the lock loss of GreenX.
    • unify the detchar computing environment (YamaT)
      • scattered codes and applications (Omicron, summary page, ) over Kamioka computers are troubling.
      • we plan to unify the environment by using igwn conda
      • detail will be reported in next meeting
      • (Darkhan) conda environment on k1ctr*. someone accidentally update someone's conda environment. administrator should prepare the conda environment?
      • (YamaT) k1ctr* share the environment. this activity is not related to k1ctr* but k1sum[01], k1det[012]. we should separate the user environment and the environment for the DET tools
      • (Darkhan) should avoid accidental mistake.


20220221 (Mon.)

  • Agenda
    • 120Hz glitches
    • DQ flags for O4
    • progress of DQR
  • Minutes
    • 120Hz glitches
      • No updates
    • DQ flags for O4
      • No updates
    • progress of DQR
    • Proposal new tool to see past data by NDS (Darkhan)


20220207 (Mon.)

  • Agenda
  • Minutes
    • 120Hz glitches
      • No updates
    • DQ flags for O4
      • slide

      • (Yuzurihara) read BLRMS data and made the several plots with 1% and 99% percentile.
      • When KAGRA will be locked as observation mode?
        • hopefully after july, there will be lock trial for two monthes(?)
      • When you set the 1% criteria, always you throw away the 1% data?
        • We might need to consider the better procedure to care that point.
    • progress of DQR


20220131 (Mon.)

  • Agenda
    • 120Hz glitches
    • Report from DQR hackathon
    • DQ flags for O4
    • Master thesis (Morisue-san)


20220117 (Mon.)

  • Agenda
    • 120Hz glitches
    • ITMX glitches
    • DQR progress
    • DQ flags for O4
  • Minutes
    • 120Hz glitches
      • No updates
      • Next step is coincidence search with signals around ETMY including local control sensors.
    • ITMX glitches
      • klog#19212

      • K1:VIS-ITMX_F3_LVDTINF_GAS_{IN1,OUT} have glitches.
      • It seems to occur around AA chassis. (AA and cable replacement didn't help to improve situation).
      • We will try to find glitches on other channels on the same ADC board.
      • This channel should be added to Omicron search on SummaryPages.

    • DQR progress
    • DQ flags for O4
      • No updates
    • O3GK paper
      • Threshold used for computing a glitch rate was changed as SNR=6.5.
      • It's a same criterion with LIGO, and Virgo.
      • Both GEO and KAGRA's results are now computed and draft was also updated.