Differences between revisions 34 and 61 (spanning 27 versions)
Revision 34 as of 2019-04-25 02:45:29
Size: 3173
Comment:
Revision 61 as of 2019-08-27 17:16:54
Size: 6333
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:

=== 20190827 (Thu.) ===
  * SummaryPageMeeting20190827

=== 20190801 (Thu.) ===
  * Agenda:
    * Each pipeline status (Omicron, Fscan, Glitch plot…)
    * Purpose/Goal of the next engineering run


=== 20190725 (Thu.) ===
  * Agenda
    * Engineering run results from data analysis
    * DetChar tool automation plan
    * update of PEM map [[https://github.com/gw-pem/kagra-pem/issues/159|detail]]

=== 20190723 (Tue.) ===
  * SummaryPageMeeting20190723



=== 20190711 (Thu.) ===
  * Agenda
    * F2F talk(s)

=== 20190704 (Thu.) ===
  * Agenda
    * Kashiwa cluster ([[attachment:DET_Kashiwa_Memo.txt|attachment]])
    * Engineering run on Jul. 13th. ([[KAGRA/Subgroups/DET/RUN|link]])
    * Data Category flags for BURST. ([[KAGRA/Subgroups/DET/DataQuality|link]], [[https://github.com/gw-detchar/DQConvert|generation script]])
    * YuzuSummary ([[https://www.icrr.u-tokyo.ac.jp/~yuzu/bKAGRA_summary/html/GlitchPlot/20190702/1246085661.0_K1:IMC-CAV_TRANS_OUT_DQ.html|sample]])

=== 20190613 (Thu.) ===
  * Agenda
    * Database issue
      * See [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/DET/Meeting/LVK0612|LVK Joint meeting]]
    * Progresses of Engineering Run analysis
      * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/DET/RUN|RUN Summary]]
      * What else
  * Announcement
    * TY requested DMG group to create the detchar account on the Kashiwa server.
    * Data transfer cannot be done due to much amount of data size. So we are now trying to reduce data size.
    * TY plan to discuss with Kanda-san on next Tue. and Wed. how to transfer the DetChar information.
    * Mervyn from Fukuoka Univ. plans to come to Kamioka from 25th to 28th Jun.
=== LVK 20190611/0612 (Tue/Wed) ===
  [[KAGRA/Subgroups/DET/Meeting/LVK0612|Agenda]]

=== 20190606 (Thu.) ===
  * Agenda
    * Urgent task for ER with X-arm cavity
      * Omicron update (Yamamoto) ... Done.
      * DQ Vector update (Yamamoto).
      * Glitch visualization (Kozakai)
      * SummaryPage update (Yokozawa)
      * Segment file update (Oshino)
      * Fscan update (Oshino, Yamamoto)

=== 20190530 (Thu.) ===
  * Agenda
    * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/DET/Task/O3|Task list for O3 run and Engineering Run on 8th Jun]]
    * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/DET/DataQuality|Data Quality Flags]]
    * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10289|Glitch plot]]

=== 20190523 (Thu.) ===
  * Agenda
    * Task list for Engineering Run on 8th Jun.
    * Trigger based plotting tool [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10253|ckozakai]]

=== 20190516 (Thu.) ===
  * Agenda
    * Comment of JRPC meeting and PAB review.
    *
  * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=xxxx|Minutes]]

=== 20190509 (Thu.) ===
  * Skipped due to the PAB review.

=== 20190502 (Thu.) ===
  * Skipped due to the Japanese holiday.
Line 10: Line 90:
    *   * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10147|Minutes]]

Meetings


20190827 (Thu.)

20190801 (Thu.)

  • Agenda:
    • Each pipeline status (Omicron, Fscan, Glitch plot…)
    • Purpose/Goal of the next engineering run

20190725 (Thu.)

  • Agenda
    • Engineering run results from data analysis
    • DetChar tool automation plan

    • update of PEM map detail

20190723 (Tue.)

20190711 (Thu.)

  • Agenda
    • F2F talk(s)

20190704 (Thu.)

20190613 (Thu.)

  • Agenda
  • Announcement
    • TY requested DMG group to create the detchar account on the Kashiwa server.
    • Data transfer cannot be done due to much amount of data size. So we are now trying to reduce data size.
    • TY plan to discuss with Kanda-san on next Tue. and Wed. how to transfer the DetChar information.

    • Mervyn from Fukuoka Univ. plans to come to Kamioka from 25th to 28th Jun.

LVK 20190611/0612 (Tue/Wed)

20190606 (Thu.)

  • Agenda
    • Urgent task for ER with X-arm cavity
      • Omicron update (Yamamoto) ... Done.
      • DQ Vector update (Yamamoto).
      • Glitch visualization (Kozakai)
      • SummaryPage update (Yokozawa)

      • Segment file update (Oshino)
      • Fscan update (Oshino, Yamamoto)

20190530 (Thu.)

20190523 (Thu.)

  • Agenda
    • Task list for Engineering Run on 8th Jun.
    • Trigger based plotting tool ckozakai

20190516 (Thu.)

  • Agenda
    • Comment of JRPC meeting and PAB review.
  • Minutes

20190509 (Thu.)

  • Skipped due to the PAB review.

20190502 (Thu.)

  • Skipped due to the Japanese holiday.

20190425 (Thu.)

  • Agenda
    • SDF preparation
    • DQ flags for data analysis
  • Minutes

20190418

  • Skipped due to the F2F meeting

20190411 (Thu.)

20190404 (Thu.)

  • Agenda
    • IMC run (3/29-3/31, 4/3-4/4)
    • Progress of Kamioka works
      • hveto
        • There are some bugs on the latest version of hveto.
        • Old version of hveto was installed in k1sumX and will be installed in k1det0.
      • Fscan
        • Automation of the Scan is already succeeded.
        • We found a bug in our cache generation system and start to fix this bug.

20190328 (Thu.)

  • Agenda
    • Progress of Kamioka works
      • Fscan run on test computer by manually.
      • For automating and integrating to SummaryPage, we need to generate Segment file in automatically.

      • We need to consider how to pick up line information and list up it from FScan results.
      • Automation of hveto on KISTI is succeeded with PMC error signal and PEM channels.
      • We start to install hveto on hveto@k1sumX.

20190322 (Fri.)

  • Zoom3 -> Zoom2 (https://zoom.us/j/6676627462)

  • Agenda
    • f2f talk
      • 1 slot (Status talk -> T. Yamamoto)

      • DAC satellite [?]
    • Task list in next week
      • Sharing the current situation of SummaryPage

      • Preparing k1det0/1
      • Managing SDF for VIS
      • Installing LIGO's tools and KGWG's tools
    • Task list of engineering run
      • Providing glitch information: (t, f, SNR)
      • Providing line information: (f, df, Amplitude, noise source)
      • Preparing the information server
    • hveto and glitch identification (Pil-Jong & Kokeyama)

20190314

  • Skipped due to the JPS meeting

20190307

  • Agenda
    • Task list of engineering run on May
    • Tools and results from KGWG
    • Summary Page isseus
    • f2f talk

20190228

KAGRA/Subgroups/DET/Meeting (last edited 2024-10-30 17:20:31 by HirotakaYuzurihara)