Differences between revisions 39 and 40
Revision 39 as of 2019-05-23 10:07:32
Size: 3800
Comment:
Revision 40 as of 2019-05-30 12:24:08
Size: 4074
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
=== 20190530 (Thu.) ===
  * Agenda
    * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/DET/Task/O3|Task list for O3 run and Engineering Run on 8th Jun]]
    * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/DET/DataQuality|Data Quality Flags]]

Meetings


20190530 (Thu.)

20190523 (Thu.)

  • Agenda
    • Task list for Engineering Run on 8th Jun.
    • Trigger based plotting tool ckozakai

20190516 (Thu.)

  • Agenda
    • Comment of JRPC meeting and PAB review.
  • Minutes

20190509 (Thu.)

  • Skipped due to the PAB review.

20190502 (Thu.)

  • Skipped due to the Japanese holiday.

20190425 (Thu.)

  • Agenda
    • SDF preparation
    • DQ flags for data analysis
  • Minutes

20190418

  • Skipped due to the F2F meeting

20190411 (Thu.)

20190404 (Thu.)

  • Agenda
    • IMC run (3/29-3/31, 4/3-4/4)
    • Progress of Kamioka works
      • hveto
        • There are some bugs on the latest version of hveto.
        • Old version of hveto was installed in k1sumX and will be installed in k1det0.
      • Fscan
        • Automation of the Scan is already succeeded.
        • We found a bug in our cache generation system and start to fix this bug.

20190328 (Thu.)

  • Agenda
    • Progress of Kamioka works
      • Fscan run on test computer by manually.
      • For automating and integrating to SummaryPage, we need to generate Segment file in automatically.

      • We need to consider how to pick up line information and list up it from FScan results.
      • Automation of hveto on KISTI is succeeded with PMC error signal and PEM channels.
      • We start to install hveto on hveto@k1sumX.

20190322 (Fri.)

  • Zoom3 -> Zoom2 (https://zoom.us/j/6676627462)

  • Agenda
    • f2f talk
      • 1 slot (Status talk -> T. Yamamoto)

      • DAC satellite [?]
    • Task list in next week
      • Sharing the current situation of SummaryPage

      • Preparing k1det0/1
      • Managing SDF for VIS
      • Installing LIGO's tools and KGWG's tools
    • Task list of engineering run
      • Providing glitch information: (t, f, SNR)
      • Providing line information: (f, df, Amplitude, noise source)
      • Preparing the information server
    • hveto and glitch identification (Pil-Jong & Kokeyama)

20190314

  • Skipped due to the JPS meeting

20190307

  • Agenda
    • Task list of engineering run on May
    • Tools and results from KGWG
    • Summary Page isseus
    • f2f talk

20190228

KAGRA/Subgroups/DET/Meeting (last edited 2024-04-10 11:10:29 by HirotakaYuzurihara)