Line 2: Line 2:
  * Meeting time: 13:00-13:30 JST/KST on every Monday
  * Meeting room: Zoom
  * Meeting time: 11:00-11:30 JST/KST on every Wednesday
  * Meeting room: Zoom3
Line 10: Line 10:
Line 12: Line 11:
=== 20221116 (Wed.) === === 20240207 (Wed.) ===
Line 15: Line 14:
    * next f2f meeting : Nov. 30(Wed) ~ Dec. 1 (Thu) [[https://dac.icrr.u-tokyo.ac.jp/KAGRA/KSC/f2f/2022December|wiki]]
     * hybrid style, Kashiwa campus in person and remote on zoom
    * LVK meeting : 13 to 16 March 2023 @ Northwestern University, IL, USA
    * JPS meeting : 22 to 25 March 2023 @ Online style
     * registration : Nov. 15 ~ Dec. 1
   * KAGRA commissioning reports (Yokozawa) [[KAGRA/Subgroups/DET/Meeting/221108|Commissioning221108]]
   * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012] (YamaT)
   * DQR update (Yuzurihara)
   * Update contents of summary page (Oshino)
    * Modified GRD_LOCKED segment configuration [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22846|klog#22846]]
    * SummaryPage trouble: process was stopped from 11/10 1:00 UTC [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22869|klog#22869]]
   * Combine DET computer resources into one DET cluster at Kamioka site
   * Noise hunting by machine learning and Hveto (Kyujin/Kihyun)
   * Update of `veto definition` / environment on m31 (Uchikata, Narikawa)
   * Management of detchar tools / script on github [[https://github.com/gw-detchar/tools|git repo]]
 * Minutes

-----
=== 20221109 (Wed.) ===
 * Agenda
   * Announcement
    * next f2f meeting : Nov. 30(Wed) ~ Dec. 1 (Thu) [[https://dac.icrr.u-tokyo.ac.jp/KAGRA/KSC/f2f/2022December|wiki]]
     * hybrid style, Kashiwa campus in person and remote on zoom
     * registration deadline for attendance and poster/oral presentation : Nov. 11 (Fri)
    * LVK meeting : 13 to 16 March 2023 @ Northwestern University, IL, USA
    * JPS meeting : 22 to 25 March 2023 @ Online style
     * registration : Nov. 15 ~ Dec. 1
   * KAGRA commissioning reports (Yokozawa) [[KAGRA/Subgroups/DET/Meeting/221108|Commissioning221108]]
      * KAGRA international workshop (KIW11)@Taiwan: 2023/04/16-17 [[https://indico.phys.sinica.edu.tw/event/92/|web]]
    * Gravitaional wave open data workshop (GWODW7)@Taiwan: 2023/04/18-20 [[https://indico.phys.sinica.edu.tw/event/92/page/220-gravitational-wave-open-data-workshop|web]]
    * O4a/preO4b(not call it as postO4a)/ER16/O4b schedule:
     * '''ER16''': It will nominally start on '''13 Mar 2024''', and last for 2 weeks. (Note that ER16 will begin in the middle of the next LVK meeting at LSU, 11-14 March.)
     * '''O4b''': We plan to commence O4b at 1600 UTC (2500 JST) on '''27 Mar 2024'''.
     * Ref.[[https://wiki.ligo.org/Operations/Agenda231214#Agenda|internal short announcements (reminders)]], [[https://observing.docs.ligo.org/plan/|public announcements]]
    * White paper and task list for 2024 [[https://git.ligo.org/operations/operations-white-paper-2023|git repo]]
    * LVK meeting on March 11-14 at Louisiana State University [[https://www.lsu.edu/physics/lvkmeeting/|web]]
     * Early Registration is open until February 1
     * There is no fee for online participants
    * Update of member list for DetChar mailing list
    * KAGRA site report (Yuzurihara)
   * Commissioning support + tasks related to O4a
    * O4a for KAGRA : 2023/05/25 0:00 JST (=2023/05/24 15:00UTC) ~ 2023/06/21 8:00 JST
    * Event validation (YamaT)
    * Tool to evaluate Gaussianity (Yamamura)
    * Scattered light noise (Yamamura)
    * Pastavi update (Yuzurihara)
    * Noise hunting by machine learning and Hveto (Kyujin, Kihyun, Syifa)
    * Classification of glitch noise (Shikano, Oshino)
    * IPC glitch
    * line noise study (Samurai)
Line 47: Line 40:
   * Noise hunting by machine learning and Hveto (Kyujin/Kihyun)
   * Update of `veto definition` / environment on m31 (Uchikata, Narikawa)
 * Minutes
   * KAGRA commissioning reports (Yokozawa) [[KAGRA/Subgroups/DET/Meeting/221108|Commissioning221108]]
    * noise budget tool is available [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22627|klog#22627]]
   * DQR update (Yuzurihara)
    * The code review will start [[https://git.ligo.org/detchar/data-quality-report/-/wikis/O4-DQR-review-page|wiki]]
    * Firstly, the infra tools will be reviewed. Invitation to join from KAGRA detchar members
   * Update contents of summary page (Oshino)
    * SummaryPage trouble: process was stopped from 11/1 22:00 UTC [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22771|klog#22771]]
    * SummaryPage trouble: process was stopped from 11/2 23:00 UTC [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22785|klog#22785]]
    * SummaryPage trouble: process was stopped from 11/6 5:00 UTC [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22815|klog#22815]]
   * Noise hunting by machine learning and Hveto (Kyujin/Kihyun)
    * plan to present poster at [[https://www.gwpaw2022.org|GWPAW 2022]], 5-9 December 2022.
    * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14221|poster]] was posted to CPC
    * (yuzurihara) in the hveto, do you use cache file listing the trigger files by Omicron?
    * Kihyun shared the code to run hveto.
   * Update of `veto definition` / environment on m31 (Uchikata, Narikawa)
    * Uchikata-san and Narikawa-san are staying KAGRA site to work on these tasks. They will have a brief report.
    * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14508|slide]]
   * Related to segment files (Uchikata, Narikawa)
   * provide the dedicated summary page for O4a of KAGRA (Uchikata and Narikawa) [[https://ldas-jobs.ligo.caltech.edu/~detchar/summary/O4a/|O4a (LV)]]
 * Minutes
Line 69: Line 46:
=== 20221102 (Wed.) ===
 * We cancel the meeting

-----
=== 20221026 (Wed.) ===
=== 20240131 (Wed.) ===
Line 76: Line 49:
    * next f2f meeting : Nov. 30(Wed) ~ Dec. 1 (Thu) [[https://dac.icrr.u-tokyo.ac.jp/KAGRA/KSC/f2f/2022December|wiki]]
     * hybrid style, Kashiwa campus in person and remote on zoom
     * registration deadline : Nov. 11 (Fri)
    * next LVK meeting : 13 to 16 March 2023 @ Northwestern University, IL, USA
    * next week meeting will be canceled.
   * KAGRA commissioning reports
      * KAGRA international workshop (KIW11)@Taiwan: 2023/04/16-17 [[https://indico.phys.sinica.edu.tw/event/92/|web]]
    * Gravitaional wave open data workshop (GWODW7)@Taiwan: 2023/04/18-20 [[https://indico.phys.sinica.edu.tw/event/92/page/220-gravitational-wave-open-data-workshop|web]]
    * O4a/preO4b(not call it as postO4a)/ER16/O4b schedule:
     * '''ER16''': It will nominally start on '''13 Mar 2024''', and last for 2 weeks. (Note that ER16 will begin in the middle of the next LVK meeting at LSU, 11-14 March.)
     * '''O4b''': We plan to commence O4b at 1600 UTC (2500 JST) on '''27 Mar 2024'''.
     * Ref.[[https://wiki.ligo.org/Operations/Agenda231214#Agenda|internal short announcements (reminders)]], [[https://observing.docs.ligo.org/plan/|public announcements]]
    * White paper and task list for 2024 [[https://git.ligo.org/operations/operations-white-paper-2023|git repo]]
    * LVK meeting on March 11-14 at Louisiana State University [[https://www.lsu.edu/physics/lvkmeeting/|web]]
     * Early Registration is open until February 1
     * There is no fee for online participants
    * Update of member list for DetChar mailing list
    * LVK MoA survey summary [[https://dcc.ligo.org/G2400189|LIGO DCC]]
    * KAGRA site report (Yuzurihara)
   * Commissioning support + tasks related to O4a
    * O4a for KAGRA : 2023/05/25 0:00 JST (=2023/05/24 15:00UTC) ~ 2023/06/21 8:00 JST
    * Event validation (YamaT)
    * Tool to evaluate Gaussianity (Yamamura)
    * Scattered light noise (Yamamura)
    * Pastavi update (Yuzurihara)
    * Noise hunting by machine learning and Hveto (Kyujin, Kihyun, Syifa)
    * Classification of glitch noise (Shikano, Oshino)
    * IPC glitch
    * line noise study (Samurai)
Line 86: Line 76:
   * Noise hunting by machine learning and Hveto (Kyujin/Kihyun)
   * Update of `veto definition` / environment on m31 (Uchikata, Narikawa)
 * Minutes
   * KAGRA commissioning reports
    * noise budget tool is available [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22627|klog#22627]]
   * DQR update (Yuzurihara)
    * Issues in running DQR [[https://git.ligo.org/o4-dqr/o4-dqr-configuration/-/issues|issue]]
    * DQR submission started before the NDS server registered the frame data. this issue also happened for LIGO. RETRY option in condor might solve the problem.
    * DQR summary page is available on CIT.
    * new release on [[https://git.ligo.org/o4-dqr/o4-dqr-configuration|TaskManager]]. will be tested on KAGRA site
   * Related to segment files (Uchikata, Narikawa)
   * provide the dedicated summary page for O4a of KAGRA (Uchikata and Narikawa) [[https://ldas-jobs.ligo.caltech.edu/~detchar/summary/O4a/|O4a (LV)]]
 * Minutes
   * Noise hunting by machine learning and Hveto (Kyujin, Kihyun, Syifa)
    * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=28392|O4a hveto results]]
   * line noise study (Samurai)
    * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=15613|slide]]
    * Is it possible to set the initial parameter in advance, such as prominence and height?
    * In future, it is better to extend the fft length to be longer for fine frequency resolution.
Line 97: Line 86:
    * switch frametype of strain channel to `science` [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22636|klog#22636]]
    * Summary page helps lockloss investigation [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22651|klog#22651]]
    * SummaryPage VIS process was stopped from 10/24 15:00 UTC. [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22669|klog#22669]]
   * Noise hunting by machine learning and Hveto (Kyujin/Kihyun)
    * plan to present poster at [[https://www.gwpaw2022.org|GWPAW 2022]]
   * Update of `veto definition` / environment on m31 (Uchikata, Narikawa)
    * plan to stay KAGRA site in November
    * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=28397|Update configuration file on SummaryPage]]
   * Related to segment files (Uchikata, Narikawa)
    * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=28399|Glitch rate for O4a]]
   * provide the dedicated summary page for O4a of KAGRA (Uchikata and Narikawa) [[https://ldas-jobs.ligo.caltech.edu/~detchar/summary/O4a/|O4a (LV)]]
    * The attempt to generate summary page is on system-B. For reading data, NDS2 server is helpful.
Line 106: Line 93:
=== 20221019 (Wed.) === === 20240124 (Wed.) ===
Line 109: Line 96:
    * next f2f meeting : Nov. 30(Wed) ~ Dec. 1 (Thu) [[https://dac.icrr.u-tokyo.ac.jp/KAGRA/KSC/f2f/2022December|wiki]]
     * hybrid style, Kashiwa campus in person and remote on zoom
     * registration deadline : Nov. 11 (Fri)
    * next LVK meeting : 13 to 16 March 2023 @ Northwestern University, IL, USA
    * Proposal to lower the public alert threshold [[https://dac.icrr.u-tokyo.ac.jp/KAGRA/DAWG/DAC/Telecons/20221017#Proposal%20to%20lower%20the%20public%20alert%20threshold|KAGRA DAC]] [[https://dcc.ligo.org/LIGO-G2201755|slide]]
   * KAGRA commissioning reports (Yokozawa) [[KAGRA/Subgroups/DET/Meeting/221019|Commissioning221019]]
      * KAGRA international workshop (KIW11)@Taiwan: 2023/04/16-17
    * Gravitaional wave open data workshop (GWODW7)@Taiwan: 2023/04/18-20 [[https://gwosc.org/workshops/|web]]
    * LIGO-Virgo-KAGRA detchar joint meeting
     * tileslot: onthly, 23:00 JST (14:00 UTC) or 6:00 JST (21 UTC)
     * Last meeting on Nov. 15 23:00 JST (14:00 UTC) [[https://wiki.ligo.org/DetChar/Telecon20231115|wiki]]
    * O4a/preO4b(not call it as postO4a)/ER16/O4b schedule:
     * '''O4a''': It will end at 1600 UTC on '''16 Jan 2024'''. LLO will end O4a observing early, at 1400 UTC.
     * '''ER16''': It will nominally start on '''13 Mar 2024''', and last for 2 weeks. (Note that ER16 will begin in the middle of the next LVK meeting at LSU, 11-14 March.)
     * '''O4b''': We plan to commence O4b at 1600 UTC (2500 JST) on '''27 Mar 2024'''.
     * Ref.[[https://wiki.ligo.org/Operations/Agenda231214#Agenda|internal short announcements (reminders)]], [[https://observing.docs.ligo.org/plan/|public announcements]]
    * Information of O4a [[https://dac.icrr.u-tokyo.ac.jp/KAGRA/Observations/O4a|wiki]] page
    * White paper and task list for 2024 [[https://git.ligo.org/operations/operations-white-paper-2023|git repo]]
    * LVK meeting on March 11-14 at Louisiana State University
    * Update of member list for DetChar mailing list
    * KAGRA site report (Yuzurihara)
   * Commissioning support + tasks related to O4a
    * O4a for KAGRA : 2023/05/25 0:00 JST (=2023/05/24 15:00UTC) ~ 2023/06/21 8:00 JST
    * Event validation (YamaT)
    * Tool to evaluate Gaussianity (Yamamura)
    * Scattered light noise (Yamamura)
    * Pastavi update (Yuzurihara)
    * Noise hunting by machine learning and Hveto (Kyujin, Kihyun, Syifa)
    * Classification of glitch noise (Shikano, Oshino)
    * IPC glitch
    * line noise study (Samurai)
     * Peak identifications [[https://gwdet.icrr.u-tokyo.ac.jp/~controls/misc/html/knownlines_o4a.html|web]]
Line 117: Line 124:
   * Update contents of summary page? (Oshino)    * Update contents of summary page (Oshino)
    * run Omicron at Kamioka site and refresh the Omicron plots on summary page during O4a period
Line 119: Line 127:
   * Noise hunting by machine learning and Hveto (Kyujin/Kihyun)
   * Update of `veto definition` / environment on m31 (Uchikata, Narikawa)
 * Minutes
   * DQR update (Yuzurihara)
    * last week, no DQR call
   * Update contents of summary page? (Oshino)
    * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22477|klog#22477]]
    * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22478|klog#22478]]
    * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22536|klog#22536]]
    * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22537|klog#22537]]
    * (yuzurihara) Range Spectrum on summary page for KAGRA [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14479|slide]]
   * Combine DET computer resources into one DET cluster at Kamioka site
    * No update
   * Noise hunting by machine learning and Hveto (Kyujin/Kihyun)
    * plan to present poster at [[https://www.gwpaw2022.org|GWPAW 2022]]
   * Update of `veto definition` / environment on m31 (Uchikata, Narikawa)
    * plan to stay KAGRA site in November
   * Script to generate segment files (Uchikata, Narikawa)
   * Related to segment files (Uchikata, Narikawa)
   * provide the dedicated summary page for O4a of KAGRA? [[https://ldas-jobs.ligo.caltech.edu/~detchar/summary/O3a/|O3a (LV)]]
 * Minutes
    * Noise hunting by machine learning and Hveto (Kyujin, Kihyun, Syifa)
     * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=28392|O4a hveto results]]
    * Update contents of summary page (Oshino)
     * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=28390|Modified configuration file on SummaryPage]]
Line 138: Line 137:
=== 20221012 (Wed.) === === 20240117 (Wed.) ===
Line 141: Line 140:
    * next f2f meeting : Nov. 30(Wed) ~ Dec. 1 (Thu) [[https://dac.icrr.u-tokyo.ac.jp/KAGRA/KSC/f2f/2022December|wiki]]
     * hybrid style, Kashiwa campus in person and remote on zoom
     * registration deadline : Nov. 11 (Fri)
    * next LVK meeting : 13 to 16 March 2023 @ Northwestern University, IL, USA
   * KAGRA commissioning reports (Yokozawa) [[KAGRA/Subgroups/DET/Meeting/221012|Commissioning221012]]
      * KAGRA international workshop (KIW11)@Taiwan: 2023/04/16-17
    * Gravitaional wave open data workshop (GWODW7)@Taiwan: 2023/04/18-20 [[https://gwosc.org/workshops/|web]]
    * LIGO-Virgo-KAGRA detchar joint meeting
     * tileslot: onthly, 23:00 JST (14:00 UTC) or 6:00 JST (21 UTC)
     * Last meeting on Nov. 15 23:00 JST (14:00 UTC) [[https://wiki.ligo.org/DetChar/Telecon20231115|wiki]]
    * O4a/preO4b(not call it as postO4a)/ER16/O4b schedule:
     * '''O4a''': It will end at 1600 UTC on '''16 Jan 2024'''. LLO will end O4a observing early, at 1400 UTC.
     * '''ER16''': It will nominally start on '''13 Mar 2024''', and last for 2 weeks. (Note that ER16 will begin in the middle of the next LVK meeting at LSU, 11-14 March.)
     * '''O4b''': We plan to commence O4b at 1600 UTC (2500 JST) on '''27 Mar 2024'''.
     * Ref.[[https://wiki.ligo.org/Operations/Agenda231214#Agenda|internal short announcements (reminders)]], [[https://observing.docs.ligo.org/plan/|public announcements]]
    * Information of O4a [[https://dac.icrr.u-tokyo.ac.jp/KAGRA/Observations/O4a|wiki]] page
    * White paper and task list for 2024 [[https://git.ligo.org/operations/operations-white-paper-2023|git repo]]
    * LVK meeting on March 11-14 at Louisiana State University
    * KAGRA site report (Yuzurihara)
   * Commissioning support + tasks related to O4a
    * O4a for KAGRA : 2023/05/25 0:00 JST (=2023/05/24 15:00UTC) ~ 2023/06/21 8:00 JST
    * Event validation (YamaT)
    * Tool to evaluate Gaussianity (Yamamura)
    * Scattered light noise (Yamamura)
    * Pastavi update (Yuzurihara)
    * Noise hunting by machine learning and Hveto (Kyujin, Kihyun, Syifa)
    * Classification of glitch noise (Shikano, Oshino)
    * IPC glitch
    * line noise study (Samurai)
     * Peak identifications [[https://gwdet.icrr.u-tokyo.ac.jp/~controls/misc/html/knownlines_o4a.html|web]]
Line 148: Line 167:
   * Update contents of summary page? (Oshino)    * Update contents of summary page (Oshino)
    * run Omicron at Kamioka site and refresh the Omicron plots on summary page during O4a period
Line 150: Line 170:
   * Noise hunting by machine learning and Hveto (Kyujin/Kihyun)
   * Update of `veto definition` / environment on m31 (Uchikata, Narikawa)
 * Minutes
   * Script to generate segment files (Uchikata, Narikawa)
   * Related to segment files (Uchikata, Narikawa)
   * provide the dedicated summary page for O4a of KAGRA? [[https://ldas-jobs.ligo.caltech.edu/~detchar/summary/O3a/|O3a (LV)]]
 * Minutes
   * Tool to evaluate Gaussianity (Yamamura)
    * Gauch recently looks not running. There is no html page linked from summary page. We will check the details later.
Line 154: Line 177:
    * New time slot for DQR meeting : Wednesday 24:00 JST. Today's meeting will be canceled.
    * Aogaku univ. members stayed KAGRA site during Sep. 25 ~ Oct. 1. They developed the script to investigate the stationarity of PEM sensors. [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22222|klog#22222]]
    * They checked accelerometer and microphone data and found that one of accelerometer sensor shows strange behavior. Now it was fixed. [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22374|klog#22374]]
   * Noise hunting by machine learning and Hveto (Kyujin/Kihyun)
    * Started to make the spectrograms (omega-scan?) for applying machine learning
    * There is issue on computer, so use KISTI cluster
    * Started to analyze LIGO data. When KAGRA data is ready, we will start to apply to KAGRA data
   * Update of `veto definition` / environment on m31 (Uchikata, Narikawa)
    * Omega-scan at m31 is working. But, there is no option to use `gw_data_find` in omega-scan.
    * By editing the source code (such as gwpy), it might be archivable

-----
=== 20220926 (Mon.) ===
 * Agenda
   * Announcement
    * poll to select new time slot of detchar meeting. deadline is Sep. 30 12:00JST.
    * Pastavi server is unavailable due to the upgrade of KAGRA main storage server
   * KAGRA commissioning reports (Yokozawa) [[KAGRA/Subgroups/DET/Meeting/220926|Commissioning220926]]
   * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012] (YamaT)
   * DQR update (Yuzurihara)
    * no report on KAGRA's activity
   * Update contents of summary page? (Oshino)
    * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=22167|klog#22167]]
   * Combine DET computer resources into one DET cluster at Kamioka site
   * Noise hunting by machine learning and Hveto (Kyujin/Kihyun)
   * Update of `veto definition` / environment on m31 (Uchikata, Narikawa)
 * Minutes
   * Update of `veto definition` / environment on m31 (Uchikata, Narikawa)
    * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14429|slide]]
    * comment : try to set FFLPATH variable / try to use `gw_data_find`. [[https://dac.icrr.u-tokyo.ac.jp/KAGRA/DAWG/DMG/Manuals/gw_data_find|instruction]] / try to use ffl files instead of cache file



-----
=== 20220829 (Mon.) ===
 * Agenda
   * Announcement
    * LVK meeting
    * Next week, the meeting will be canceled due to LVK meeting.
   * KAGRA commissioning reports (Yokozawa) [[KAGRA/Subgroups/DET/Meeting/220005|Commissioning220005]]
   * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012] (YamaT)
   * DQR update (Yuzurihara)
    * no report on KAGRA's activity
    * We are collecting the comments on the proposal [[https://dcc.ligo.org/LIGO-T2200265|document]]
   * Update contents of summary page? (Oshino)
    * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=21996|klog#21996]]
   * Combine DET computer resources into one DET cluster at Kamioka site
   * Noise hunting by machine learning and Hveto (Kyujin/Kihyun)
   * Update of `veto definition` / environment on m31 (Uchikata, Narikawa)

-----
=== 20220829 (Mon.) ===
 * Agenda
   * Announcement
    * Task list for 2022
    * LVK meeting
    * Next week, YamaT-san will chai the meeting
    * Date for detchar meeting from September or October? Monday 13:00 JST or other time?
   * KAGRA commissioning reports (Yokozawa) [[KAGRA/Subgroups/DET/Meeting/220829|Commissioning220829]]
   * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012] (YamaT)
   * DQR update (Yuzurihara)
   * Update contents of summary page? (Oshino)
   * Combine DET computer resources into one DET cluster at Kamioka site
   * Noise hunting by machine learning and Hveto (Kyujin/Kihyun)
   * Update of `veto definition` / environment on m31 (Uchikata, Narikawa)
 * Minutes
   * DQR update (Yuzurihara)
    * we are collecting your comments on the proposal [[https://dcc.ligo.org/G2201168|slide]]
    * In the current proposal, the shift is 12 hour shift and it continue one week. The effort is 7/250*100 = 2.8% (in the case of 250 days for working day).
   * Update contents of summary page? (Oshino)
    * YamaT-san updated the guardian for VIS. This update should be included in summary page. [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14395|slide]]

-----
=== 20220822 (Mon.) ===
 * Agenda
   * Announcement
    * Task list for 2022
   * KAGRA commissioning reports (Yokozawa) [[KAGRA/Subgroups/DET/Meeting/220822|Commissioning220822]]
   * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012] (YamaT)
   * DQR update (Yuzurihara)
   * Update contents of summary page? (Oshino)
   * Combine DET computer resources into one DET cluster at Kamioka site
   * Noise hunting by machine learning and Hveto (Kyujin/Kihyun)
   * Update of `veto definition` / environment on m31 (Uchikata, Narikawa)
 * Minutes
   * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012] (YamaT)
    * No update. Oshino-san will investigate the conda environment for summary page
   * DQR update (Yuzurihara)
    * `Offline Event Validation in O4` was presented in the last OPS call [[https://dcc.ligo.org/G2201168|slide]]
    * They proposed the basic strategy for Offline Event Validation in O4.
    * If you have an opinion for how much KAGRA will contribute for the volunteer, please let us know.
   * Update contents of summary page? (Oshino)
    * definition for locked state was changed. Stability of summary page job has improved.
   * Combine DET computer resources into one DET cluster at Kamioka site
    * DET computer was moved to SK building
   * Noise hunting by machine learning and Hveto (Kyujin/Kihyun)
    * paper writing is on-going
   * Update of `veto definition` / environment on m31 (Uchikata, Narikawa)
    * no update

-----
=== 20220808 (Mon.) ===
 * Agenda
   * Announcement
    * Task list for 2022
    * Next detchar meeting will be canceled due to summer holiday
   * KAGRA commissioning reports (Yokozawa) [[KAGRA/Subgroups/DET/Meeting/220808|Commissioning220808]]
   * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012] (YamaT)
   * DQR update (Yuzurihara)
    * no update
   * Pastavi update (Yuzurihara)
    * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=21695|klog#21695]]
   * Update contents of summary page? (Oshino)
    * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=21680|klog#21680]]
    * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=21629|klog#21629]]
    * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=21617|klog#21617]]
   * Combine DET computer resources into one DET cluster at Kamioka site
   * Noise hunting by machine learning and Hveto (Kyujin/Kihyun)
   * Update of `veto definition` / environment on m31 (Uchikata, Narikawa)


-----
=== 20220801 (Mon.) ===
 * We cancel the meeting due to f2f meeting.

-----
=== 20220725 (Mon.) ===
 * Agenda
   * Announcement
    * next KAGRA face-to-face meeting will be held on August 1~3 (hybrid style) [[https://dac.icrr.u-tokyo.ac.jp/KAGRA/KSC/f2f/2022August|web]]
    * DetChar chief submitted the task list for 2022. DetChar member will need the register each task.
   * KAGRA commissioning reports (Yokozawa) [[KAGRA/Subgroups/DET/Meeting/220725|Commissioning220725]]
   * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012] (YamaT)
   * DQR update (Yuzurihara)
    * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14197|slide]]
    * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=21561|klog#21561]]
   * Update contents of summary page? (Oshino)
    * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=21559|klog#21559]]
   * Combine DET computer resources into one DET cluster at Kamioka site
   * Noise hunting by machine learning and Hveto (Kyujin/Kihyun)
   * Update of `veto definition` / environment on m31 (Uchikata, Narikawa)

-----
=== 20220711 (Mon.) ===
 * Agenda
   * Announcement
    * next KAGRA face-to-face meeting will be held on August 1~3 (hybrid style) [[https://dac.icrr.u-tokyo.ac.jp/KAGRA/KSC/f2f/2022August|web]]
    * Registration deadline is July 15 (Fri) 18:00 JST
    * DetChar chief submitted the task list for 2022. DetChar member will need the register each task.
    * We plan to cancel next DetChar meeting 7/18 due to Japanese holiday.
   * KAGRA commissioning reports (Yokozawa) [[KAGRA/Subgroups/DET/Meeting/220711|Commissioning220711]]
   * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012] (YamaT)
   * DQR update (Yuzurihara)
   * Update contents of summary page? (Oshino)
   * Combine DET computer resources into one DET cluster at Kamioka site
   * Noise hunting by machine learning and Hveto (Kyujin)
   * Overview of `veto definition` (Uchikata, Narikawa)
 * Minutes
   * KAGRA commissioning reports (Yokozawa) [[KAGRA/Subgroups/DET/Meeting/220711|Commissioning220711]]
    * no update
   * DQR update (Yuzurihara)
    * [[ https://klog.icrr.u-tokyo.ac.jp/osl/?r=21373|klog#21373]]
    * I tested the retry option to treat the issue that condor job failed. But, this option doesn't work, probably because we are using DAG.
    * But, we plan to move the place to run DQR to the upper stream. This might not be necessary.
   * Update contents of summary page? (Oshino)
    * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=21376|klog#21376]] [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=21429|klog#21429]]
    * Last week, summary process stopped twice due to unknown reason. We need to monitor carefully.
   * Noise hunting by machine learning and Hveto (Kyujin)
    * One or two week later, the report by applying Hveto to O3GK data will appear.
   * Overview of `veto definition` (Uchikata, Narikawa)
    * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14174|slide]]
    * They worked on testing DetChar tools and veto definer on m31.
    * Uchikata-san and Narikawa-san will be the contact person to connect detchar and data analysis group.

-----
=== 20220704 (Mon.) ===
 * Agenda
   * Announcement
    * next KAGRA face-to-face meeting will be held on August 1~3 (hybrid style) [[https://dac.icrr.u-tokyo.ac.jp/KAGRA/KSC/f2f/2022August|web]]
   * KAGRA commissioning reports (Yokozawa) [[KAGRA/Subgroups/DET/Meeting/220704|Commissioning220704]]
   * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012] (YamaT)
   * DQR update (Yuzurihara)
   * Update contents of summary page? (Oshino)
   * Combine DET computer resources into one DET cluster at Kamioka site
   * Proposal of noise hunting tool by machine learning (Kyujin)
   * Task list for 2022 from Jan 2022 to Dec 2022)
 * Minutes
   * DQR update (Yuzurihara)
    * no report. Recently no DQR call
   * Update contents of summary page? (Oshino)
    * Added the page for newly installed accelerometer [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=21347|klog#21347]]
    * Recently process for summary page is unstable [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=21348|klog#21348]] [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=21345|klog#21345]] [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=21286|klog#21286]]
   * Proposal of noise hunting tool by machine learning (Kyujin)
     * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14147|slide]]
   * Task list for 2022 from Jan 2022 to Dec 2022)
    * Yuzurihara submitted the task list. Next, subgroup member will require the register each task.

-----
=== 20220627 (Mon.) ===
 * Agenda
   * Announcement
    * LIGO DetChar F2F is July 18-19 with noise sprint July 20-22. In person + remote style [[https://wiki.ligo.org/DetChar/Jul2022DetCharF2F|wiki]]
    * next KAGRA face-to-face meeting will be held on August 1~3 (hybrid style) [[https://dac.icrr.u-tokyo.ac.jp/KAGRA/KSC/f2f/2022August|web]].
    * Proposal of KAGRA DetChar f2f meeting.
     * Kashiwa? Kamioka?
     * Off-site members will join?
   * KAGRA commissioning reports (Yokozawa) [[KAGRA/Subgroups/DET/Meeting/220627|Commissioning220627]]
   * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012] (YamaT)
   * DQR update (Yuzurihara)
   * Update contents of summary page? (Oshino)
   * Combine DET computer resources into one DET cluster at Kamioka site
   * Task list for 2022 from Jan 2022 to Dec 2022)
 * Minutes
   * DQR update (Yuzurihara)
    * no update
   * Update contents of summary page? (Oshino)
   * Combine DET computer resources into one DET cluster at Kamioka site
    * no update
   * Task list for 2022 from Jan 2022 to Dec 2022)
    * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14147&version=1|slide]]

-----
=== 20220620 (Mon.) ===
 * Agenda
   * Announcement
    * LIGO DetChar F2F is July 18-19 with noise sprint July 20-22. In person + remote style [[https://wiki.ligo.org/DetChar/Jul2022DetCharF2F|wiki]]
    * Joint LVK DetChar report to the OPsDiv Meeting on 2022/06/16 [[https://dcc.ligo.org/G2200999|slide]] [[https://wiki.ligo.org/Operations/Agenda220616|minutes]]
    * LIGO, VIRGO AND KAGRA OBSERVING RUN PLANS [[https://observing.docs.ligo.org/plan/|web]] (15 June 2022 update)
    * next KAGRA face-to-face meeting will be held on August 1~3 (in-person style@U-Tokyo, Hongo campas + online style). The registration will start soon.
   * KAGRA commissioning reports (Yokozawa) [[KAGRA/Subgroups/DET/Meeting/220620|Commissioning220620]]
   * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012] (YamaT)
   * DQR update (Yuzurihara)
   * Update contents of summary page? (Oshino)
   * Combine DET computer resources into one DET cluster at Kamioka site
 * Minutes
   * face-to-face meeting for KAGRA detchar@Kamioka
    * (Yuzurihara) if you have a comment/opinion, please let me know.
   * DQR update (Yuzurihara)
     * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=21190|klog#21190]]
     * sometimes DQR jobs failed, because the MDC trigger time is earlier than the time the latest frame file was generated.
     * One of solutions is to run DQR at upper stream on DGS network called DMT network.
   * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012] (YamaT)
     * no report
   * Update contents of summary page? (Oshino)
   * Combine DET computer resources into one DET cluster at Kamioka site
     * no update
-----
=== 20220613 (Mon.) ===
 * Agenda
   * Announcement
    * LIGO DetChar F2F is July 18-19 with noise sprint July 20-22. In person + remote style [[https://wiki.ligo.org/DetChar/Jul2022DetCharF2F|wiki]]
    * New paper about DQ for pyCBC [[https://arxiv.org/abs/2204.03091|arXiv]]
   * KAGRA commissioning reports (Yokozawa)
   * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012] (YamaT)
   * DQR update (Yuzurihara)
   * Update contents of summary page? (Oshino)
   * Combine DET computer resources into one DET cluster at Kamioka site
 * Minutes
   * KAGRA commissioning reports
    * Explained by Yokozawa-san. see [[KAGRA/Subgroups/DET/Meeting/220613|KAGRA detector status220613]]
   * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012] (YamaT)
   * DQR update (Yuzurihara)
    * Task to compute inspiral range is running on k1det1 [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20986|klog#20986]]
   * Update contents of summary page? (Oshino)
    * Updated DetChar and VIS tab [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=21060|klog#21060]]

-----
=== 20220606 (Mon.) ===
 * Canceled due to conflict with KIW9

-----
=== 20220530 (Mon.) ===
 * Agenda
   * Announcement
    * The 9th KAGRA International Workshop (KIW) [[https://indico.itp.ac.cn/event/123/|web]] (registration by May 31, 2022)
    * JPS meeting : registration by June 2 [[https://www.jps.or.jp/activities/meetings/autumn/autumn_index.php|web]]
     * Question : Someone should present the status of DetChar and activity toward O4?
    * LIGO DetChar F2F is July 18-19 with noise sprint July 20-22. In person + remote style [[https://wiki.ligo.org/DetChar/Jul2022DetCharF2F|wiki]]
    * Final KAGRA report at OpsDiv call was done at May. 26, 2022 [[https://dcc.ligo.org/LIGO-G2200869|slide for May 26]]
   * KAGRA commissioning reports
   * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012] (YamaT)
   * DQR update (Yuzurihara)
   * Update contents of summary page? (Oshino)
   * Combine DET computer resources into one DET cluster at Kamioka site
 * Minutes
   * KAGRA commissioning reports
    * Pumping down of EY started at 2022 May 24 9:45~ [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20851|klog#20851]]
    * Pumping down of IY started at 2022 May 25 9:35~ [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20874|klog#20874]]
   * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012] (YamaT)
    * hveto worked with omicron triggers generated by a new version of Omicron
      * There seems to be no compatibility between omicron version we use and one in igwn-py39.
      * There may be also no compatibility between SummaryPages we use and omicron in igwn-py39.
      * If so, we need to move igwn-py39 for all tools (SummaryPages, omicron, hveto etc.)
      * SummaryPages in igwn-py39 had worked well in gps mode (reported a few weeks ago).
      * TY want to gather the volunteer to test SummaryPages in daily mode.
    * gwpy can use 'NDSSERVER' environmental variable
      * We don't need to do the code hack for nds2.py in gwpy.
    * (Yuzu) In DAC call, I heard that operation test of `gw_data_find` is on-going on m31 by Compu&Soft members. It may be available in a few week.
   * DQR update (Yuzurihara)
    * I prepared the code of one task to compute inspiral range at the time of GW alert.
    * I send the merge request [[https://git.ligo.org/detchar/dqrtasks|git repo]] and will take the review.
   * Update contents of summary page? (Oshino)
    * Update SummaryPages web server by YamaT [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20926|klog#20926]]

-----
=== 20220523 (Mon.) ===
 * Agenda
   * Announcement
    * New accounts for accessing LIGO resources (registration by May 22)
    * The 9th KAGRA International Workshop (KIW) [[https://indico.itp.ac.cn/event/123/|web]] (registration by May 31, 2022)
    * Final KAGRA report at OpsDiv call is planned at May. 26, 2022 [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14010|slide for Mar 31]][[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13890|slide for Feb 17]]
    * JPS meeting : registration by June 2 [[https://www.jps.or.jp/activities/meetings/autumn/autumn_index.php|web]]
   * KAGRA commissioning reports
   * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012] (YamaT)
    * call for volunteers from remote site, to test hveto and FScan. Please let us (Yuzuriahra or YamaT) know.
   * DQR update (Yuzurihara)
   * Update contents of summary page? (Oshino)
   * Combine DET computer resources into one DET cluster at Kamioka site
 * Minutes
   * KAGRA commissioning reports
    * In-air health check for suspensions (ITMY, ETMY) was by Ushiba and other members.
    * On last Friday, we had the acceptance check to close the chamber for Yarm. It passed.
    * ADC glitch problem on many suspensions by YamaT [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20815|klog#20815]]
   * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012] (YamaT)
     * hveto itself worked without no additional code hack.
     * Compatible error in trigger file format was occurred
       * {{{The 'peak' columns have incompatible types: ['object', 'float64', 'float64']}}}
       * In TY's remember, Kozakai-san faced and solved same problem...(?)
     * TY want to re-arrange cluttered O3-segments including test ones.
     * (Yuzu) This error is related to [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=19846|klog#19846]] ?
   * DQR update (Yuzurihara)
    * no update
   * Update contents of summary page? (Oshino)
    * Updated VIS page. see [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20814|klog#20814]]
   * Analysis of transient signals of IMMT1 (Aogaku members)
    * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20793|klog#20793]]
 
-----
=== 20220516 (Mon.) ===
 * Agenda
   * Announcement
    * Vigo DetChar paper [[https://arxiv.org/abs/2205.01555|arXiv]]
    * The 9th KAGRA International Workshop (KIW) [[https://indico.itp.ac.cn/event/123/|web]] (registration by May 31, 2022)
    * GWADW2022 [[https://indico.icrr.u-tokyo.ac.jp/event/255/|web]] (registration closed)
    * The GRAvitational - wave Science&technology Symposia (GRASS 2022) [[https://agenda.infn.it/event/30681/|web]] (registration closed)
    * (Final) KAGRA report at OpsDiv call is planned at May. 26, 2022 [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14010|slide for Mar 31]][[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13890|slide for Feb 17]]
   * KAGRA commissioning reports
   * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012]
    * call for volunteers from remote site, to test hveto and FScan. Please let us (Yuzuriahra or YamaT) know.
   * DQR update (Yuzurihara)
   * Update contents of summary page? (Oshino)
   * Combine DET computer resources into one DET cluster at Kamioka site
   * Report of new tool development? (Darkhan)
   * Glitch subtraction survey for O4
    * see mail from Davis Derek (2022 May 3)
    * deadline : May 16
    * The glitch subtraction activities are managed under DET.
    * [[https://wiki.ligo.org/DetChar/O4GlitchSubtractionTools|current summary]]

 * Minuts
   * Announcement
    * If you talk about DetChar activity, please let chairs know
   * KAGRA commissioning reports
    * In-air health check for suspensions (ITMY, ETMY) is on-going by Ushiba [[ https://klog.icrr.u-tokyo.ac.jp/osl/?r=20724|klog#20724]] [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20729|klog#20729]]
    * Turned "ON" two radiation shield coolers for EXC. But, on Sunday, it turned off due to mistake [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20712|klog#20712]] [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20736|klog#20736]]
   * DQR update (Yuzurihara)
    * Operation test for DQR application is on-going on DetChar dedicated machine
    * From last Wednesday, the alert from MDC stopped (I'm not sure this is scheduled or not...)
     * That is because 1st period of MDC finished
    * The code review will start gradually
    * You can see the summary report of MDC alert on [[https://gracedb-playground.ligo.org/reports/|GraceDB]]
   * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012]
    * FScan cannot find IGWN.
      * YamaT plan to use it which is a part of lalpulsar packages.
    * Trigger files are required for hveto test.
      * YamaT plan to do the consistency check with O3 triggers and the configuration file.
      * Trigger files are on the DET file server and they must be mounted from the test server.
      * Oshino-san will share a past configuration file.
   * Update contents of summary page? (Oshino)
    * summary page is working well
   * Combine DET computer resources into one DET cluster at Kamioka site
    * no update
   * Report of new tool development? (Darkhan)
    * debugging code

-----
=== 20220509 (Mon.) ===
 * Agenda
   * Announcement
   * KAGRA commissioning reports
    *
   * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012]
    * call for volunteers from remote site, to test hveto and FScan. Please let us (Yuzuriahra or YamaT) know.
   * DQR update (Yuzurihara)
   * Update contents of summary page? (Oshino)
   * Combine DET computer resources into one DET cluster at Kamioka site
   * Report of new tool development? (Darkhan)
   * Glitch subtraction survey for O4
    * see mail from Davis Derek (2022 May 3)
    * deadline : May 16
    * The glitch subtraction activities are managed under DET. I would like to ask regular report in DET meeting.

 * Minuts
   * Announcement
   * KAGRA commissioning reports
    * ADC noise measurement [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20658|klog#20658]]
    * In-air health check for Yarm suspensions (ITMY and ETMY) is on-going.
     * If no problem, review will be done next week and pumping down will start on week of May 23
   * DQR update (Yuzurihara)
    * no update
   * Report of new tool development? (Darkhan)
    * add channel list?

-----
=== 20220502 (Mon.) ===
 * Agenda
   * Announcement
   * KAGRA commissioning reports
    * PRM cause the glitch in IMMT1 OPLEV signal and POP forword QPD signal [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20539|klog#20539]]
    * In-air health check for suspensions (ITMY, ETMY) is on-going by Ushiba [[ https://klog.icrr.u-tokyo.ac.jp/osl/?r=20631|klog#20631]] [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20632|klog#20632]]
   * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012]
    * call for volunteers from remote site, to test hveto and FScan. Please let us (Yuzuriahra or YamaT) know.
   * DQR update (Yuzurihara)
   * Update contents of summary page? (Oshino)
   * Combine DET computer resources into one DET cluster at Kamioka site
   * Report of new tool development? (Darkhan)
   * Data Quality flag for O4a
    * We are asking the concrete requirement for DAC members (CBC, burst, Stochastic)
    * This is related to discuss the ER period and time
   * Analysis of TCam photos of ITMY and ETMY with the metal scale by Tcam
 * Minutes
   * Announcement
    * GWADW2022 [[https://indico.icrr.u-tokyo.ac.jp/event/255/|web]]
    * The 9th KAGRA International Workshop (KIW) [[https://indico.itp.ac.cn/event/123/|web]]
    * The GRAvitational - wave Science&technology Symposia (GRASS 2022) [[https://agenda.infn.it/event/30681/|web]]
   * DQR update (Yuzurihara)
    * no update.
   * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012]
    * no update
   * Update contents of summary page? (Oshino)
    * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20634|klog#20634]]
   * Analysis of TCam photos of ITMY and ETMY with the metal scale by Tcam [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20574|klog#20574]]
    * analysis is on-going by Aogaku students. Report will appear soon.

-----
=== 20220425 (Mon.) ===
 * canceld
-----
=== 20220418 (Mon.) ===
 * Agenda
   * Announcement
    * monthly maintenance for JGWDoc + JGW wiki + klog on April 18 13:00-16:00 JST.
   * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012]
    * call for volunteers from remote site, to test hveto and FScan. Please let us (Yuzuriahra or YamaT) know.
   * DQR update (Yuzurihara)
   * Update contents of summary page? (Oshino)
   * Combine DET computer resources into one DET cluster at Kamioka site
   * Report of new tool development? (Darkhan)
 * Minutes
   * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012]
     * No updates in last week.
     * Some volunteers for testing of hveto, fscan are sitll wanted.
     * We should start to test also iDQ from now on for future observing runs (O5, O6...)
   * DQR update (Yuzurihara)
    * operation test for tools is on-going without error and trouble
   * Update contents of summary page? (Oshino)
    * no update
   * Combine DET computer resources into one DET cluster at Kamioka site
    * no update
   * Report of new tool development? (Darkhan)
    * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14032|slide]]
   * 120Hz glitches investigation during O3GK
    * [[https://github.com/gw-detchar/tools/tree/master/Hveto/etc|configuration file]]
-----
=== 20220411 (Mon.) ===
 * Agenda
   * Announcement
    * Workshop 2022/04/15 [[https://indico.in2p3.fr/event/26414/program|web page]]
     * DetChar talk is planed by Yokozawa. When he circulates slide, put comments on slide.
   * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012]
    * call for volunteers from remote site, to test hveto and FScan. Please let us (Yuzuriahra or YamaT) know.
   * Exchange of opinions between DET members(YamaT, Sawada(OPS), Yuzurihara) and DMG members(Kanda, Oohara)
   * DQR update (Yuzurihara)
   * Update contents of summary page? (Oshino)
   * Combine DET computer resources into one DET cluster at Kamioka site
    * (Oshino) explain idea, goal, and timeline
   * Report of new tool development? (Darkhan)
   * Follow-up report of remote contribution from Aoyama Gakuin univ.
 * Minutes
   * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012]
     * no volunteer yet (Test of hveto and FScan).
       * Coding kagradata.py for the new version of Bruco is ongoing.
       * We need to decide KAGRA common rule about NDS2 and DATAFIND for fixing codes.
     * NAPT test was started for the purpose of saving number of IP address in DGS network.
       * DET gateway (copy of k1gate is enough for the test) will be connected to DGS network.
         * Other nodes will be under DET gateway.
       * It may be better to construct the gateway as Deb10. (Copy of k1gate is Rocky8)
         * TY have no experience of constructing NAPT on Debian.
       * NDS(k1nds[012]), NFS(k1nfs0) services must be available from under DET gateway.
       * How should we do k1det2 which is used for Bruco running from CDS workstation.
   * Exchange of opinions between DET members(YamaT, Sawada(OPS), Yuzurihara) and DMG members(Kanda, Oohara)
    * related to conda environment and DQR tasks
    * in Kashiwa server and Kamioka computers, we should have common rule fo NDS2 and DATAFIND, which YamaT already mentioned.
   * DQR update (Yuzurihara)
    * the application to connect between igwn-alert and Task Manager was developped by Joe
    * DQRAlert [[https://git.ligo.org/o4-dqr/dqralert|git repo]]
    * I tried to run this tool in Kamioka computer and it is working well.
    * need to prepare the document of how to use this tool on wiki page.
    * [[https://git.ligo.org/o4-dqr/dqralert/-/blob/trunk/docs/source/overview.rst|DQR workflow]]
   * Update contents of summary page?
    * no update
   * Combine DET computer resources into one DET cluster at Kamioka site
    * goal : prepare job management server and can submit job to k1det[012]
    * timeline : before O4
    * there might be conflict between this cluster and NAPT test. Oshino and YamaT will discuss.
   * Follow-up report of remote contribution from Aoyama Gakuin univ.
    * (Yokozawa, Oshino, Yuzurihara) we started the discussion of task list and how to contribute from remote site.
-----
=== 20220404 (Mon.) ===
  * Agenda
    * Announcement
     * DQR design document, put comments on [[https://git.ligo.org/detchar/o4-data-quality-report-design-document/-/issues?label_name%5B%5D=Second+circulation|git issue]]
     * Workshop 2022/04/15
      * [[https://indico.in2p3.fr/event/26414/program|Workshop on the development of innovative tools for new collaborations within gravitational wave detection experiments]]
     * KAGRA's authorship submission. For details, see [kagra 05009]. Deadline April 8 17:00 JST
    * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012]
    * DQR update
    * Update of summary page
    * Trouble of Omicron trigger generation
    * 120Hz glitches investigation during O3GK
  * Minutes
    * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012]
      * Installation of IGWN was done on k1detfs.
        * Too slow HDD response? (~150KB/s via NFS)
      * Works well
        * SummaryPages as GPS-select mode
          * ini-file grammar is slightly changed from the old version.
        * Omicron
          * No special hack
        * Omega-scan
          * needs temporal code hack
        * Bruco
          * needs preparation for reading kagra data (kagradata.py)
          * No {{{--include}}} option in original one.
      * Not yet
        * SummaryPages as Daily mode (This will be done by Kamioka people)
        * hveto
        * FScan
          * Not included in IGWN environment?
      * Problem
        * No global NDS2, DataFind servers or equivalent way.
          * SSH port forwarding is not enough because port number is different depending on person.
          * So I cannot do the code hack on IGWN software in the system region.
        * KAGRA env may not be able to be included in IGWN until O4.
          * If so, we shouldn't use IGWN in officially for O4.
     * (Lupin) igwn-py38? or py39?
     * YamaT asked status of FScan
     * In future, we need to prepare similar environment on Kashiwa cluster. The environment is not completely same as Kamioka computers.
     * We need volunteers from remote site, to test hveto and FScan. Please let us (Yuzuriahra or YamaT) know.
    * DQR update (Yuzurihara)
     * Operation test for new version of Task Manager is on-going on k1det1.
     * I found that code of stationary task uses `datafind` to read gwf data, which we don't have.
     * I need to consider how to read data for DQR tasks.
      * (Darkhan) Is there any way to get the latest list of channels?
      * (Yuzurihara) If you can specify the name of frame data, there is a function on gwpy.
    * Update of summary page (Oshino)
     * no update
    * Trouble of Omicron trigger generation (Oshino)
     * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20328|klog#20328]]
     * replaced the local SSD on k1sum1. The Omicron triggers are stored in different disk.
    * 120Hz glitches investigation during O3GK
     * no update
     * Kihyun can't join for a while. This project will be postponed.
    * Report of new tool development (Darkhan)
     * showed demonstration
     * this tool can take a ratio between channels and will be able to apply time-domain filter (band pass/highpass/lowpass) in future.
-----
=== 20220328 (Mon.) ===
  * Agenda
    * Announcement
     * DQR design document, put comments on [[https://git.ligo.org/detchar/o4-data-quality-report-design-document/-/issues?label_name%5B%5D=Second+circulation|git issue]]
     * Workshop 2022/04/15 [[https://indico.in2p3.fr/event/26414/program|Workshop on the development of innovative tools for new collaborations within gravitational wave detection experiments]]
    * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012]
    * Activity report by students from Aoyama Gakuin univ.
     * glitch investigation related to IMMT1 oplev (Aoyama Gakuin univ.)
     * Tcam image analysis to identify mirror location and center (Aoyama Gakuin univ.)
    * DQR update
    * Update of summary page
    * 120Hz glitches investigation during O3GK

 * Minutes
  * Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012]
   * YamaT constructed the test environment in local computer
   * Although YamaT is copying the environment to DetChar computers, it is very slow. (speed ~ 250KB/s)
   * After copying, YamaT will work on modification of codes to fit KAGRA data, such as nds2.py
   * For testing the tools (Omicron, Hveto...), we need volunteers, especially remote site!
  * Activity report by students from Aoyama Gakuin univ.
   * five students and two staff members from Aoyama Gakuin univ. stayed Kamioka site during last three weeks.
   * They helped commissioning work both in tunnel [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20124|klog#20124]] [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20155|klog#20155]] and in control room.
   * several code developments to understand glitch cause have been done. [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20026|klog#20026]] [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20027|klog#20027]]
   * code development to identify mirror center of ITMX have been done by using image analysis. [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=14003|slide(Japanese)]] [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20036|klog#20036]] [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20198|klog20198]] [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20203|klog#20203]]
  * DQR update
   * Joe updated Task Manager. Yuzurihara will install new version and test it.
  * Update of summary page
   * no update
  * 120Hz glitches investigation during O3GK
   * no update

-----
=== 20220307 (Mon.) ===
  * Agenda
    * announcement
     * LVK meeting March 2022 [[https://wiki.ligo.org/LSC/Meeting/LVKMeetingMarch2022|wiki]] [[https://cgca.uwm.edu/events/2021lvk|web]]
      * registration is available
    * 120Hz glitches investigation during O3GK
    * unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012]
    * DQ flags for O4
    * DQR update
    * glitch investigation related to IMMT1 oplev
 * Minutes
    * 120Hz glitches investigation during O3GK
     * no update
    * unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012]
     * YamaT is working on this project at test-server.
     * Test of new conda environment will start from next week (after JPS meeting)
    * DQ flags for O4
     * no update
    * DQR update
     * Joe is developing the code to connect between igwn-alert and TaskManager. It will be available soon.
     * Schedule for review
      * Review of Task Manager will be done before review of each task.
      * High priority task needs to complete before Aug. 2022
      * Low priority task needs to complete before Nov. 2022
    * glitch investigation related to IMMT1 oplev
     * From March 8, students from Aoyama Gakuin univ. stayed at Kamioka
     * They worked on the investigation of glitch. [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20026|klog#20026]][[https://klog.icrr.u-tokyo.ac.jp/osl/?r=20027|klog#20027]]
     * They checked IMMT1 QPD signals and PRM suspension signals at the time of glitch.
    * NDS2 tool development (Darkhan)
     * no major update.
    * GPS accuracy monitor (Oshino)
     * is available on [[https://gwdet.icrr.u-tokyo.ac.jp/~controls/summary/day/20220313/detchar/gps/|summary page]]
     * Current difference is acceptable and reasonable.
    * No meeting on March 21 due to Japanese holiday. Next meeting is planed on March 28.

-----
=== 20220307 (Mon.) ===
  * Agenda
    * announcement
     * RRT plan during O4 [[https://dcc.ligo.org/G2200220|slide]]
     * LVK meeting March 2022 [[https://wiki.ligo.org/LSC/Meeting/LVKMeetingMarch2022|wiki]] [[https://cgca.uwm.edu/events/2021lvk|web]]
      * registration is available
    * 120Hz glitches investigation during O3GK
    * unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012] (YamaT)
    * DQ flags for O4
    * DQR update
  * Minutes (Yuzurihara)
   * 120Hz glitches investigation during O3GK
    * no update
   * unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012] (YamaT)
    * There are many computers/workstations in Kamioka site or Kamioka control room.
    * Workstations (k1ctr*) use common conda environment by mounting the file server.
    * In DetChar computers k1{sum,det}[01], conda environment should be unified all DetChar resources, similar to workstations.
    * To prevent the trouble that DetChar experts might break the environment, the conda environments will be set as read-only permission.
    * Installation will be done by Kamioka members. After that, we need volunteers to test the DetChar tools on new conda environment.
    * what is the time line?
     * Installation will finished before the end of March. From April, the test will start. Volunteers are helpful.
   * DQ flags for O4
    * In last PEM meeting, Yuzurihara presented the current status and received the helpful comments. [slide](https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13970)
    * We will change our plan to construct the data quality flag and will compute the BLRMS of gwpy to set the threshold.
    * The review is necessary before O4. (probably very close to O4, because we need ER)
   * DQR update
    * no update
   * Commissioning of GreenX
    * In the last weekend, the commissioner tried continuous GreenX. During that trials, they found many short term lock loss (~10 ms). 10 ms is too short to follow the suspension motion, so it is likely that there are some causes of the lock loss except for the suspension motion.
    * The commissioner needs helps DetChar members to identify the cause or give a hint of the cause.
    * For details, see [[https://klog.icrr.u-tokyo.ac.jp/osl/index.php?r=19963|klog#19963]] [[https://klog.icrr.u-tokyo.ac.jp/osl/index.php?r=19983|klog#19983]]
    * main channel K1:TMS-X_GR_PDA1_OUT_DQ
    * time : 2022 Mar 06 23:37:50 UTC = 2022 Mar 07 8:37:50 JST = GPS time 1330645088


-----
=== 20220228 (Mon.) ===
  * Agenda
    * 120Hz glitches
    * DQ flags for O4
    * progress of DQR
    * lock loss study of GreenX

  * Minutes (Yuzurihara)
    * accouncement
     * LVK meeting March 2022 [[https://wiki.ligo.org/LSC/Meeting/LVKMeetingMarch2022|wiki]] [[https://cgca.uwm.edu/events/2021lvk|web]]
      * registration is available
      * Wed, 17 March 2021:
       * Plenary Session #1 (09:00-10:30 US/CDT) (=3/16 23:00 JST)
       * Paper Presentation Session #1
       * Plenary Session #2 (16:00-17:30 US/CDT) (=3/17 6:00 JST)
      * Thu, 18 March 2021:
       * Plenary Session #3 (09:00-10:30 US/CDT) (=3/17 23:00 JST)
       * Paper Presentation Session #2
       * Plenary Session #4 (16:00-17:30 US/CDT) (=3/18 6:00 JST)
     * Pastavi server will be unavailable tonight
       * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=19913|klog#19913]]
    * 120Hz glitches
     * no update
    * DQ flags for O4
     * no update
    * progress of DQR
     * igwn-alert is running more than 9days and receiving the MDC alert
     * next step is to connect the MDC alert with the launch TaskManager.
     * remained task is to develop InspiralRange [[https://git.ligo.org/detchar/dqrtasks/-/issues/8|issue]]
    * lock loss study of GreenX
     * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=19906|klog#19906]]
     * From the Hveto result, the channel (K1:IMC-SERVO_MIXER_DAQ_OUT_DQ) was the most coincident channel with the lock loss of GreenX.
    * unify the detchar computing environment (YamaT)
     * scattered codes and applications (Omicron, summary page, ) over Kamioka computers are troubling.
     * we plan to unify the environment by using igwn conda
     * detail will be reported in next meeting
     * (Darkhan) conda environment on k1ctr*. someone accidentally update someone's conda environment. administrator should prepare the conda environment?
     * (YamaT) k1ctr* share the environment. this activity is not related to k1ctr* but k1sum[01], k1det[012]. we should separate the user environment and the environment for the DET tools
     * (Darkhan) should avoid accidental mistake.

-----
=== 20220221 (Mon.) ===
  * Agenda
    * 120Hz glitches
    * DQ flags for O4
    * progress of DQR

  * Minutes
    * 120Hz glitches
      * No updates
    * DQ flags for O4
      * No updates
    * progress of DQR
      * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=19847|klog#19847]]
    * Proposal new tool to see past data by NDS (Darkhan)

-----
=== 20220207 (Mon.) ===
  * Agenda
    * 120Hz glitches
    * Report from [[https://wiki.ligo.org/DetChar/JanFeb2022DetCharF2F|LIGO Detchar F2F Meeting]]
    * DQ flags for O4
    * progress of DQR
  * Minutes
    * 120Hz glitches
      * No updates
    * DQ flags for O4
      * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13851|slide]]
      * (Yuzurihara) read BLRMS data and made the several plots with 1% and 99% percentile.
      * When KAGRA will be locked as observation mode?
       * hopefully after july, there will be lock trial for two monthes(?)
      * When you set the 1% criteria, always you throw away the 1% data?
       * We might need to consider the better procedure to care that point.
    * progress of DQR
      * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=19671|klog#19671]]

-----
=== 20220131 (Mon.) ===
  * Agenda
    * 120Hz glitches
    * Report from DQR hackathon
    * DQ flags for O4
    * Master thesis (Morisue-san)

-----
=== 20220117 (Mon.) ===
  * Agenda
    * 120Hz glitches
    * ITMX glitches
    * DQR progress
    * DQ flags for O4
  * Minutes
    * 120Hz glitches
      * No updates
      * Next step is coincidence search with signals around ETMY including local control sensors.
    * ITMX glitches
      * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=19212|klog#19212]]
      * K1:VIS-ITMX_F3_LVDTINF_GAS_{IN1,OUT} have glitches.
      * It seems to occur around AA chassis. (AA and cable replacement didn't help to improve situation).
      * We will try to find glitches on other channels on the same ADC board.
      * This channel should be added to Omicron search on SummaryPages.
    * DQR progress
      * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13721|JGW-G2213721]]
    * DQ flags for O4
      * No updates
    * O3GK paper
      * Threshold used for computing a glitch rate was changed as SNR=6.5.
      * It's a same criterion with LIGO, and Virgo.
      * Both GEO and KAGRA's results are now computed and draft was also updated.
    * I asked the remote help to Derek. I'm submitteing the application for the ICRR computer account.
   * IPC glitch
    * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=28025|Summary of recent segment for IPC glitch (2023/11~12)]]
   * Noise hunting by machine learning and Hveto (Kyujin, Kihyun, Syifa)
    * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=28194|2023-05-24 ~ 06-07 O4a hveto results]]
    * The analysis for the remained date will be
   * Update contents of summary page (Oshino)
    * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=28057|Modified configuration files of SummaryPage]]
    * [[https://klog.icrr.u-tokyo.ac.jp/osl/?r=28247|Modified configuration file on SummaryPage]]
Line 947: Line 189:
  * [[KAGRA/Subgroups/DET/Meeting/2023|2023]]
  * [[KAGRA/Subgroups/DET/Meeting/2022|2022]]

Meetings

  • Meeting time: 11:00-11:30 JST/KST on every Wednesday
  • Meeting room: Zoom3


Agenda & Minutes


20240207 (Wed.)

  • Agenda
    • Announcement
      • KAGRA international workshop (KIW11)@Taiwan: 2023/04/16-17 web

      • Gravitaional wave open data workshop (GWODW7)@Taiwan: 2023/04/18-20 web

      • O4a/preO4b(not call it as postO4a)/ER16/O4b schedule:
      • White paper and task list for 2024 git repo

      • LVK meeting on March 11-14 at Louisiana State University web

        • Early Registration is open until February 1
        • There is no fee for online participants
      • Update of member list for DetChar mailing list

      • KAGRA site report (Yuzurihara)
    • Commissioning support + tasks related to O4a
      • O4a for KAGRA : 2023/05/25 0:00 JST (=2023/05/24 15:00UTC) ~ 2023/06/21 8:00 JST
      • Event validation (YamaT)
      • Tool to evaluate Gaussianity (Yamamura)
      • Scattered light noise (Yamamura)
      • Pastavi update (Yuzurihara)
      • Noise hunting by machine learning and Hveto (Kyujin, Kihyun, Syifa)
      • Classification of glitch noise (Shikano, Oshino)
      • IPC glitch
      • line noise study (Samurai)
    • Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012] (YamaT)
    • DQR update (Yuzurihara)
    • Update contents of summary page (Oshino)
    • Combine DET computer resources into one DET cluster at Kamioka site
    • Related to segment files (Uchikata, Narikawa)
    • provide the dedicated summary page for O4a of KAGRA (Uchikata and Narikawa) O4a (LV)

  • Minutes


20240131 (Wed.)

  • Agenda
    • Announcement
      • KAGRA international workshop (KIW11)@Taiwan: 2023/04/16-17 web

      • Gravitaional wave open data workshop (GWODW7)@Taiwan: 2023/04/18-20 web

      • O4a/preO4b(not call it as postO4a)/ER16/O4b schedule:
      • White paper and task list for 2024 git repo

      • LVK meeting on March 11-14 at Louisiana State University web

        • Early Registration is open until February 1
        • There is no fee for online participants
      • Update of member list for DetChar mailing list

      • LVK MoA survey summary LIGO DCC

      • KAGRA site report (Yuzurihara)
    • Commissioning support + tasks related to O4a
      • O4a for KAGRA : 2023/05/25 0:00 JST (=2023/05/24 15:00UTC) ~ 2023/06/21 8:00 JST
      • Event validation (YamaT)
      • Tool to evaluate Gaussianity (Yamamura)
      • Scattered light noise (Yamamura)
      • Pastavi update (Yuzurihara)
      • Noise hunting by machine learning and Hveto (Kyujin, Kihyun, Syifa)
      • Classification of glitch noise (Shikano, Oshino)
      • IPC glitch
      • line noise study (Samurai)
    • Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012] (YamaT)
    • DQR update (Yuzurihara)
    • Update contents of summary page (Oshino)
    • Combine DET computer resources into one DET cluster at Kamioka site
    • Related to segment files (Uchikata, Narikawa)
    • provide the dedicated summary page for O4a of KAGRA (Uchikata and Narikawa) O4a (LV)

  • Minutes
    • Noise hunting by machine learning and Hveto (Kyujin, Kihyun, Syifa)
    • line noise study (Samurai)
      • slide

      • Is it possible to set the initial parameter in advance, such as prominence and height?
      • In future, it is better to extend the fft length to be longer for fine frequency resolution.
    • Update contents of summary page (Oshino)
    • Related to segment files (Uchikata, Narikawa)
    • provide the dedicated summary page for O4a of KAGRA (Uchikata and Narikawa) O4a (LV)

      • The attempt to generate summary page is on system-B. For reading data, NDS2 server is helpful.


20240124 (Wed.)

  • Agenda
    • Announcement
      • KAGRA international workshop (KIW11)@Taiwan: 2023/04/16-17
      • Gravitaional wave open data workshop (GWODW7)@Taiwan: 2023/04/18-20 web

      • LIGO-Virgo-KAGRA detchar joint meeting
        • tileslot: onthly, 23:00 JST (14:00 UTC) or 6:00 JST (21 UTC)
        • Last meeting on Nov. 15 23:00 JST (14:00 UTC) wiki

      • O4a/preO4b(not call it as postO4a)/ER16/O4b schedule:
        • O4a: It will end at 1600 UTC on 16 Jan 2024. LLO will end O4a observing early, at 1400 UTC.

        • ER16: It will nominally start on 13 Mar 2024, and last for 2 weeks. (Note that ER16 will begin in the middle of the next LVK meeting at LSU, 11-14 March.)

        • O4b: We plan to commence O4b at 1600 UTC (2500 JST) on 27 Mar 2024.

        • Ref.internal short announcements (reminders), public announcements

      • Information of O4a wiki page

      • White paper and task list for 2024 git repo

      • LVK meeting on March 11-14 at Louisiana State University
      • Update of member list for DetChar mailing list

      • KAGRA site report (Yuzurihara)
    • Commissioning support + tasks related to O4a
      • O4a for KAGRA : 2023/05/25 0:00 JST (=2023/05/24 15:00UTC) ~ 2023/06/21 8:00 JST
      • Event validation (YamaT)
      • Tool to evaluate Gaussianity (Yamamura)
      • Scattered light noise (Yamamura)
      • Pastavi update (Yuzurihara)
      • Noise hunting by machine learning and Hveto (Kyujin, Kihyun, Syifa)
      • Classification of glitch noise (Shikano, Oshino)
      • IPC glitch
      • line noise study (Samurai)
        • Peak identifications web

    • Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012] (YamaT)
    • DQR update (Yuzurihara)
    • Update contents of summary page (Oshino)
      • run Omicron at Kamioka site and refresh the Omicron plots on summary page during O4a period
    • Combine DET computer resources into one DET cluster at Kamioka site
    • Script to generate segment files (Uchikata, Narikawa)
    • Related to segment files (Uchikata, Narikawa)
    • provide the dedicated summary page for O4a of KAGRA? O3a (LV)

  • Minutes


20240117 (Wed.)

  • Agenda
    • Announcement
      • KAGRA international workshop (KIW11)@Taiwan: 2023/04/16-17
      • Gravitaional wave open data workshop (GWODW7)@Taiwan: 2023/04/18-20 web

      • LIGO-Virgo-KAGRA detchar joint meeting
        • tileslot: onthly, 23:00 JST (14:00 UTC) or 6:00 JST (21 UTC)
        • Last meeting on Nov. 15 23:00 JST (14:00 UTC) wiki

      • O4a/preO4b(not call it as postO4a)/ER16/O4b schedule:
        • O4a: It will end at 1600 UTC on 16 Jan 2024. LLO will end O4a observing early, at 1400 UTC.

        • ER16: It will nominally start on 13 Mar 2024, and last for 2 weeks. (Note that ER16 will begin in the middle of the next LVK meeting at LSU, 11-14 March.)

        • O4b: We plan to commence O4b at 1600 UTC (2500 JST) on 27 Mar 2024.

        • Ref.internal short announcements (reminders), public announcements

      • Information of O4a wiki page

      • White paper and task list for 2024 git repo

      • LVK meeting on March 11-14 at Louisiana State University
      • KAGRA site report (Yuzurihara)
    • Commissioning support + tasks related to O4a
      • O4a for KAGRA : 2023/05/25 0:00 JST (=2023/05/24 15:00UTC) ~ 2023/06/21 8:00 JST
      • Event validation (YamaT)
      • Tool to evaluate Gaussianity (Yamamura)
      • Scattered light noise (Yamamura)
      • Pastavi update (Yuzurihara)
      • Noise hunting by machine learning and Hveto (Kyujin, Kihyun, Syifa)
      • Classification of glitch noise (Shikano, Oshino)
      • IPC glitch
      • line noise study (Samurai)
        • Peak identifications web

    • Unify conda environment in Kamioka detchar computers, k1sum[01] and k1det[012] (YamaT)
    • DQR update (Yuzurihara)
    • Update contents of summary page (Oshino)
      • run Omicron at Kamioka site and refresh the Omicron plots on summary page during O4a period
    • Combine DET computer resources into one DET cluster at Kamioka site
    • Script to generate segment files (Uchikata, Narikawa)
    • Related to segment files (Uchikata, Narikawa)
    • provide the dedicated summary page for O4a of KAGRA? O3a (LV)

  • Minutes


Past meeting

KAGRA/Subgroups/DET/Meeting (last edited 2024-11-01 12:16:19 by HirotakaYuzurihara)