Differences between revisions 4 and 5
Revision 4 as of 2018-09-11 18:37:10
Size: 1642
Comment:
Revision 5 as of 2018-09-11 18:37:26
Size: 1640
Comment:
Deletions are marked like this. Additions are marked like this.
Line 53: Line 53:
=== 坑内復旧 === == 坑内復旧 ==

停電作業手順

坑内停止

X/Y-end

  1. 回路類の停止を確認 [1F]
  2. DC18Vの停止 [1F]
  3. 計算機の停止 [1F]
  4. IO chassisの停止 [1F]
  5. DC12Vの停止 [1F]
  6. Workstationの停止 [1F]
  7. KVMの停止 [1F]
  8. 回路類の停止を確認 [2F 防振室]
  9. DC18Vの停止 [2F 前室]
  10. 計算機の停止 [2F 前室]
  11. IO chassisの停止 [2F 防振室]
  12. DC12Vの停止 [2F 前室]
  13. Workstationの停止 [2F 防振室]
  14. KVMの停止 [2F 前室]

X-arm

  1. 回路類の停止を確認
  2. DC18Vの停止
  3. 計算機の停止
  4. IO chassisの停止
  5. KVMの停止
  6. UPSの停止

Center 2F

  1. 回路類の停止を確認 [防振室]
  2. DC18Vの停止 [(今は)防振室]
  3. 計算機の停止 [前室]
  4. IO chassisの停止 [防振室]
  5. DC12Vの停止 [前室]
  6. Workstationの停止 [(今は)前室]

Center 1F

  1. 回路類の停止を確認 [中央実験室]
  2. DC18Vの停止 [中央実験室]
  3. DC18V/24Vの停止 [計算機室]
  4. Workstationの停止 [BS, IOO area]
  5. RTFEの停止 [計算機室]
  6. IO chassisの停止 [中央実験室]
  7. DC12Vの停止 [PR2, SR3 rack]
  8. k1nds[01], k1fw[01], k1tw[01], k1dc0の停止 [計算機室]
  9. DC12Vの停止 [計算機室]
  10. hyades-[01]の停止 [計算機室]
  11. 20TiBディスクの停止 [計算機室]
  12. k1scriptの停止 [計算機室]
  13. k1bootの停止 [計算機室]
  14. UPSの停止 [計算機室]


坑内復旧

  • o 下から順番に起動する

KAGRA/Subgroups/DGS/Projects/PowerOutage (last edited 2020-10-16 17:39:45 by OsamuMiyakawa)