History of the battery change

Note

Date

Name

Replaced by

Note

2020/09/29

IYC cooler

yokozawa

done

2020/09/29

BS cooler

yokozawa

done

2020/09/29

SR cooler

yokozawa

done

2020/09/01

EXV2

yokozawa

done

2020/09/01

EXV3

yokozawa

done

2020/09/01

EX0

yokozawa

done

2020/09/01

TMS

yokozawa

done

2020/08/26

IOO

yokozawa

done

2020/08/26

IOO1

yokozawa

done

2020/08/26

ALS0

yokozawa

done

2020/08/26

ALS1

yokozawa

done

2020/08/26

PRM

yokozawa

done

2020/08/26

PR2

yokozawa

done

2020/08/26

PR3

yokozawa

done

2020/08/26

BS

yokozawa

done

2020/08/26

ASC0

yokozawa

done

2020/08/26

LSC0

yokozawa

done

2020/08/26

SR2

yokozawa

done

2020/08/26

SR3

yokozawa

done

2020/08/26

SRM

yokozawa

done

2020/08/26

OMC0

yokozawa

done

2020/08/26

ICV1

yokozawa

done

2020/08/26

IXV1

yokozawa

done

2020/07/13

SRM booth

yokozawa

done

2020/07/13

SR3 booth

yokozawa

done

2020/07/13

SR2 booth

yokozawa

done

2020/07/13

BS booth

yokozawa

done

2020/07/13

PR3 booth

yokozawa

done

2020/07/13

MCF booth

yokozawa

done

2020/07/13

PS2

yokozawa

done

2020/07/13

PSL booth

yokozawa

done

2020/02/19

IYVbooth

oshino

done

2020/02/19

IXV1rack

oshino

done

2020/02/19

PR2booth

oshino

done

2020/02/19

OUT_DR

oshino

done

2020/02/18

EYA

yokozawa

done

2020/02/06

PRMbooth

yokozawa

done

2020/01/28

center

yokozawa

done

2020/01/21

EXAIR

yokozawa

done

2020/01/21

EXC1F

yokozawa

done

2020/01/21

EYC1F

yokozawa

done

2020/01/07

IMC0 rack

yamat

done

2019/12/25

ALS0 rack

yokozawa

done

2019/12/02

IYA booth

yamat

Found outside of the clean booth
Put on the tool box in the clean booth

2019/12/02

LSC rack

yamat

done

2019/11/25

BSAIR

yokozawa

done

2019/11/25

IOO1 rack

yokozawa

done

2019/11/18

SRM booth

yokozawa

done

2019/11/18

IXV2 rack

yokozawa

done

2019/11/18

PR3 rack

yokozawa

done

2019/10/29

BS rack

yokozawa

done

2019/10/29

EX1 rack

yokozawa

done

2019/10/29

EY0 rack

yokozawa

done

2019/10/8

PR3 booth

yokozawa

done

2019/10/8

BS booth

yokozawa

done

2019/10/8

ASC0

yokozawa

done

2019/10/8

PR2

yokozawa

done

2019/10/8

SR3

yokozawa

done

2019/10/8

SR2

yokozawa

done

2019/9/13

SR2 booth

yamat

done

2019/9/13

SR3 booth

yamat

done

2019/9/13

SRM rack

yamat

done

2019/9/13

ICV rack

yamat

done

2019/9/1

EX1

yamat

done

2019/9/1

IOO

yamat

done

2019/9/1

MCRACK

yamat

done

2019/8/17

IXA

yokozawa

done

2019/7/26

EYV booth

yamat

done

2019/7/24

mcfbooth

yokozawa

done

2019/7/16

OUTDR

yokozawa

done

2019/6/25

PRM

yokozawa

done

2019/6/18

DR

yamat

done

2019/6/17

BSAIR

yokozawa

done

2019/6/17

TENT1

yokozawa

done

2019/6/17

EY2

yokozawa

done

2019/6/17

EYVbooth

yokozawa

done

2019/5/3

EYV1

yokozawa

done

2019/4/17

BOOTH_PR2

Yokozawa

Actually, PR2Rack power was down. Replaced new one to PR2booth and replaced PR2booth one to PR2rack...

2019/4/10

RACK_PX1

Miyo

done

2019/4/7

FIELD_CENTER

Kokeyama

done

2019/3/26

BOOTH_PRM

yamat

done

2019/2/21

BOOTH_IXA

yamat

done

2019/2/6

MOZUMI

yokozawa

done

2019/2/5

RACK_ALS0

yokozawa

done

2018/12/19

BOOTH_PSL

Kokeyama

done

2018/12/13

PR3

Mark

done

2018/11/28

Mozumi Base station

kokeyama

the AC found unplugged

2018/11/28

BSbooth

Mark

done

2018/11/28

SR2booth

Mark

done

2018/11/28

SR3booth

Mark

done

2018/11/28

IYC

kokeyama

done

2018/11/27

PR2booth

Fabian

done

2018/10/19

EYC2F

kokeyama

done

2018/10/02

EXA

kokeyama

something wrong

2018/10/02

ioo (rack)

kokeyama

done

2018/08/25

mcrack

yokozawa

done

2018/08/17

exa

yamat

done

2018/08/17

iya

kokeyama

done

2018/08/01

PSL

yokozawa

done

2018/7/31

MCFbooth

yamat

done

2018/7/31

PRM

yamat

done

2018/6/21

CENTER

kokeyama

done

2018/6/15

PR2

yamat

PR2 was at BS rack. Also PRM was at PR3 rack.
Should we move to the right racks as changing the channel names are complicated?
fixed

2018/6/15

IYV2

yamat

new one

2018/06/08

EYC1F

haya

done

2018/6/7

IXV1

yamat

new one

2018/6/7

IXV2

yamat

new one

2018/6/7

IYV1

yamat

new one

2018/6/6

ICV1

yamat

new one

2018/5/15

MCRACK

haya

done

2018/4/26

PRMbooth

kokeyama

left at the PRM front room

2018/4/26

EYA

haya

done

2018/4/27

EXA2F

Sato

done

KAGRA/Subgroups/DGS/Projects/Rem/History (last edited 2020-09-30 00:06:28 by TakaakiYokozawa)