== 電池交換履歴 == | == History of the battery change == |
Line 3: | Line 3: |
|| Date || Name || Replaced by || Note || || 2018/7/31 || MCFbooth || 山本 || 完了 || || 2018/7/31 || PRM || 山本 || 完了 || || 2018/6/21 || CENTER || 苔山 || 完了 || || 2018/6/15 || PR2 || 山本 || 実際にはBS rackにあった。PRMもPR3 rackにあった。<<BR>>チャンネル名変更は大変なので正しいrackに移すべき?|| || 2018/6/15 || IYV2 || 山本 || 新設 || || 2018/06/08 || EYC1F || 早河 || 完了 || || 2018/6/7 || IXV1 || 山本 || 新設 || || 2018/6/7 || IXV2 || 山本 || 新設 || || 2018/6/7 || IYV1 || 山本 || 新設 || || 2018/6/6 || ICV1 || 山本 || 新設 || || 2018/5/15 || MCRACK || 早河 || 完了 || || 2018/4/26 || PRMbooth || 苔山 || PRM前室に放置されていた || || 2018/4/26 || EYA || 早河 || 完了 || || 2018/4/27 || EXA2F || 佐藤 || 完了 || |
Note * 11/28/2018 * EYC sensor is back in the cryo-machine room (why?) * [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/digitalsystem/2018/11/ondotori-maintainance.html|maintenance log on DGS blog]] * Yokozawa added 40 battries at Oct.2019 || Date || Name || Replaced by || Note || || 2019/11/18 || SRM booth || yokozawa || done || || 2019/11/18 || IXV2 rack || yokozawa || done || || 2019/11/18 || PR3 rack || yokozawa || done || || 2019/10/29 || BS rack || yokozawa || done || || 2019/10/29 || EX1 rack || yokozawa || done || || 2019/10/29 || EY0 rack || yokozawa || done || || 2019/10/8 || PR3 booth || yokozawa || done || || 2019/10/8 || BS booth || yokozawa || done || || 2019/10/8 || ASC0 || yokozawa || done || || 2019/10/8 || PR2 || yokozawa || done || || 2019/10/8 || SR3 || yokozawa || done || || 2019/10/8 || SR2 || yokozawa || done || || 2019/9/13 || SR2 booth || yamat || done || || 2019/9/13 || SR3 booth || yamat || done || || 2019/9/13 || SRM rack || yamat || done || || 2019/9/13 || ICV rack || yamat || done || || 2019/9/1 || EX1 || yamat || done || || 2019/9/1 || IOO || yamat || done || || 2019/9/1 || MCRACK || yamat || done || || 2019/8/17 || IXA || yokozawa || done || || 2019/7/26 || EYV booth || yamat || done || || 2019/7/24 || mcfbooth || yokozawa || done || || 2019/7/16 || OUTDR || yokozawa || done || || 2019/6/25 || PRM || yokozawa || done || || 2019/6/18 || DR || yamat || done || || 2019/6/17 || BSAIR || yokozawa || done || || 2019/6/17 || TENT1 || yokozawa || done || || 2019/6/17 || EY2 || yokozawa || done || || 2019/6/17 || EYVbooth || yokozawa || done || || 2019/5/3 || EYV1 || yokozawa || done || || 2019/4/17 || BOOTH_PR2 || Yokozawa || Actually, PR2Rack power was down. Replaced new one to PR2booth and replaced PR2booth one to PR2rack... || || 2019/4/10 || RACK_PX1 || Miyo || done || || 2019/4/7 || FIELD_CENTER || Kokeyama || done || || 2019/3/26 || BOOTH_PRM || yamat || done || || 2019/2/21 || BOOTH_IXA || yamat || done || || 2019/2/6 || MOZUMI || yokozawa || done || || 2019/2/5 || RACK_ALS0 || yokozawa || done || || 2018/12/19 || BOOTH_PSL || Kokeyama || done || || 2018/12/13 || PR3 || Mark || done || || 2018/11/28 || Mozumi Base station || kokeyama || the AC found unplugged || || 2018/11/28 || BSbooth || Mark || done || || 2018/11/28 || SR2booth || Mark || done || || 2018/11/28 || SR3booth || Mark || done || || 2018/11/28 || IYC || kokeyama || done || || 2018/11/27 || PR2booth || Fabian || done || || 2018/10/19 || EYC2F || kokeyama || done || || 2018/10/02 || EXA || kokeyama || something wrong || || 2018/10/02 || ioo (rack) || kokeyama || done || || 2018/08/25 || mcrack || yokozawa || done || || 2018/08/17 || exa || yamat || done || || 2018/08/17 || iya || kokeyama || done || || 2018/08/01 || PSL || yokozawa || done || || 2018/7/31 || MCFbooth || yamat || done || || 2018/7/31 || PRM || yamat || done || || 2018/6/21 || CENTER || kokeyama || done || || 2018/6/15 || PR2 || yamat || PR2 was at BS rack. Also PRM was at PR3 rack. <<BR>>--(Should we move to the right racks as changing the channel names are complicated?)--<<BR>>fixed || || 2018/6/15 || IYV2 || yamat || new one || || 2018/06/08 || EYC1F || haya || done || || 2018/6/7 || IXV1 || yamat || new one || || 2018/6/7 || IXV2 || yamat || new one || || 2018/6/7 || IYV1 || yamat || new one || || 2018/6/6 || ICV1 || yamat || new one || || 2018/5/15 || MCRACK || haya || done || || 2018/4/26 || PRMbooth || kokeyama || left at the PRM front room || || 2018/4/26 || EYA || haya || done || || 2018/4/27 || EXA2F || Sato || done || |
History of the battery change
Note
- 11/28/2018
- EYC sensor is back in the cryo-machine room (why?)
- Yokozawa added 40 battries at Oct.2019
Date |
Name |
Replaced by |
Note |
2019/11/18 |
SRM booth |
yokozawa |
done |
2019/11/18 |
IXV2 rack |
yokozawa |
done |
2019/11/18 |
PR3 rack |
yokozawa |
done |
2019/10/29 |
BS rack |
yokozawa |
done |
2019/10/29 |
EX1 rack |
yokozawa |
done |
2019/10/29 |
EY0 rack |
yokozawa |
done |
2019/10/8 |
PR3 booth |
yokozawa |
done |
2019/10/8 |
BS booth |
yokozawa |
done |
2019/10/8 |
ASC0 |
yokozawa |
done |
2019/10/8 |
PR2 |
yokozawa |
done |
2019/10/8 |
SR3 |
yokozawa |
done |
2019/10/8 |
SR2 |
yokozawa |
done |
2019/9/13 |
SR2 booth |
yamat |
done |
2019/9/13 |
SR3 booth |
yamat |
done |
2019/9/13 |
SRM rack |
yamat |
done |
2019/9/13 |
ICV rack |
yamat |
done |
2019/9/1 |
EX1 |
yamat |
done |
2019/9/1 |
IOO |
yamat |
done |
2019/9/1 |
MCRACK |
yamat |
done |
2019/8/17 |
IXA |
yokozawa |
done |
2019/7/26 |
EYV booth |
yamat |
done |
2019/7/24 |
mcfbooth |
yokozawa |
done |
2019/7/16 |
OUTDR |
yokozawa |
done |
2019/6/25 |
PRM |
yokozawa |
done |
2019/6/18 |
DR |
yamat |
done |
2019/6/17 |
BSAIR |
yokozawa |
done |
2019/6/17 |
TENT1 |
yokozawa |
done |
2019/6/17 |
EY2 |
yokozawa |
done |
2019/6/17 |
EYVbooth |
yokozawa |
done |
2019/5/3 |
EYV1 |
yokozawa |
done |
2019/4/17 |
BOOTH_PR2 |
Yokozawa |
Actually, PR2Rack power was down. Replaced new one to PR2booth and replaced PR2booth one to PR2rack... |
2019/4/10 |
RACK_PX1 |
Miyo |
done |
2019/4/7 |
FIELD_CENTER |
Kokeyama |
done |
2019/3/26 |
BOOTH_PRM |
yamat |
done |
2019/2/21 |
BOOTH_IXA |
yamat |
done |
2019/2/6 |
MOZUMI |
yokozawa |
done |
2019/2/5 |
RACK_ALS0 |
yokozawa |
done |
2018/12/19 |
BOOTH_PSL |
Kokeyama |
done |
2018/12/13 |
PR3 |
Mark |
done |
2018/11/28 |
Mozumi Base station |
kokeyama |
the AC found unplugged |
2018/11/28 |
BSbooth |
Mark |
done |
2018/11/28 |
SR2booth |
Mark |
done |
2018/11/28 |
SR3booth |
Mark |
done |
2018/11/28 |
IYC |
kokeyama |
done |
2018/11/27 |
PR2booth |
Fabian |
done |
2018/10/19 |
EYC2F |
kokeyama |
done |
2018/10/02 |
EXA |
kokeyama |
something wrong |
2018/10/02 |
ioo (rack) |
kokeyama |
done |
2018/08/25 |
mcrack |
yokozawa |
done |
2018/08/17 |
exa |
yamat |
done |
2018/08/17 |
iya |
kokeyama |
done |
2018/08/01 |
PSL |
yokozawa |
done |
2018/7/31 |
MCFbooth |
yamat |
done |
2018/7/31 |
PRM |
yamat |
done |
2018/6/21 |
CENTER |
kokeyama |
done |
2018/6/15 |
PR2 |
yamat |
PR2 was at BS rack. Also PRM was at PR3 rack. |
2018/6/15 |
IYV2 |
yamat |
new one |
2018/06/08 |
EYC1F |
haya |
done |
2018/6/7 |
IXV1 |
yamat |
new one |
2018/6/7 |
IXV2 |
yamat |
new one |
2018/6/7 |
IYV1 |
yamat |
new one |
2018/6/6 |
ICV1 |
yamat |
new one |
2018/5/15 |
MCRACK |
haya |
done |
2018/4/26 |
PRMbooth |
kokeyama |
left at the PRM front room |
2018/4/26 |
EYA |
haya |
done |
2018/4/27 |
EXA2F |
Sato |
done |