Differences between revisions 14 and 15
Revision 14 as of 2016-07-19 11:21:03
Size: 1395
Comment:
Revision 15 as of 2016-07-19 11:21:21
Size: 1400
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
== Note of the Meeting with Zsuzsa (Jul 15, 2016 at Columbia University)==
== Note of the Meeting with Zsuzsa (Jul 15, 2016 at Columbia University) ==

KAGRA Timing System


Note of the Meeting with Zsuzsa (Jul 15, 2016 at Columbia University)

Suggestions (random order)

  • You may not want more IRIG-B boards because there is Dsub output on the back of IRIG-B board with which we can convert to BNC to use more outputs.
  • It's better to connect two GPS antennas to Master board so that one can be used when the other signal is lost.
  • In the master board, VCXO is not available in the market anymore. However Szusza has spares.
  • In the comparator board, there is one chip which gets very hot. Make sure to cool it down.
  • Check if the leap second is correctly compensated in the oldest IRIG-B (one arrived on 5/7/2012, installed in the front room). iKAGRA timing might have been off 1 sec!

Reference

LIGO Documents

KAGRA/Subgroups/DGS/Projects/Timing (last edited 2021-08-11 18:12:00 by shoichi.oshino)