Differences between revisions 8 and 13 (spanning 5 versions)
Revision 8 as of 2012-05-25 10:46:42
Size: 642
Comment:
Revision 13 as of 2016-07-19 11:20:30
Size: 1351
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
## page was renamed from LCGT/subgroup/ifo/digital/Timing
Line 3: Line 4:
== LIGO Documents == ----

== Meeting note with Zsuzsa ==

=== Suggestions (random order) ===
 * You may not want more IRIG-B boards because there is Dsub output on the back of IRIG-B board with which we can convert to BNC to use more outputs.
 * It's better to connect two GPS antennas to Master board so that one can be used when the other signal is lost.
 * In the master board, VCXO is not available in the market anymore. However Szusza has spares.
 * In the comparator board, there is one chip which gets very hot. Make sure to cool it down.
 * Check if the leap second is correctly compensated in the oldest IRIG-B (one arrived on 5/7/2012, installed in the front room). iKAGRA timing might have been off 1 sec!



== Reference ==
==== LIGO Documents ====
Line 9: Line 24:

== GPS antenna and receiver ==
 * Link to [[LCGT/subgroup/mine|Facility Support]]

KAGRA Timing System


Meeting note with Zsuzsa

Suggestions (random order)

  • You may not want more IRIG-B boards because there is Dsub output on the back of IRIG-B board with which we can convert to BNC to use more outputs.
  • It's better to connect two GPS antennas to Master board so that one can be used when the other signal is lost.
  • In the master board, VCXO is not available in the market anymore. However Szusza has spares.
  • In the comparator board, there is one chip which gets very hot. Make sure to cool it down.
  • Check if the leap second is correctly compensated in the oldest IRIG-B (one arrived on 5/7/2012, installed in the front room). iKAGRA timing might have been off 1 sec!