Differences between revisions 9 and 13 (spanning 4 versions)
Revision 9 as of 2012-06-05 12:44:37
Size: 667
Comment:
Revision 13 as of 2016-07-19 11:20:30
Size: 1351
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
## page was renamed from LCGT/subgroup/ifo/digital/Timing
Line 2: Line 3:

----

== Meeting note with Zsuzsa ==

=== Suggestions (random order) ===
 * You may not want more IRIG-B boards because there is Dsub output on the back of IRIG-B board with which we can convert to BNC to use more outputs.
 * It's better to connect two GPS antennas to Master board so that one can be used when the other signal is lost.
 * In the master board, VCXO is not available in the market anymore. However Szusza has spares.
 * In the comparator board, there is one chip which gets very hot. Make sure to cool it down.
 * Check if the leap second is correctly compensated in the oldest IRIG-B (one arrived on 5/7/2012, installed in the front room). iKAGRA timing might have been off 1 sec!

Line 10: Line 24:

==== GPS antenna and receiver ====
 * Link to [[LCGT/subgroup/mine|Facility Support]]

KAGRA Timing System


Meeting note with Zsuzsa

Suggestions (random order)

  • You may not want more IRIG-B boards because there is Dsub output on the back of IRIG-B board with which we can convert to BNC to use more outputs.
  • It's better to connect two GPS antennas to Master board so that one can be used when the other signal is lost.
  • In the master board, VCXO is not available in the market anymore. However Szusza has spares.
  • In the comparator board, there is one chip which gets very hot. Make sure to cool it down.
  • Check if the leap second is correctly compensated in the oldest IRIG-B (one arrived on 5/7/2012, installed in the front room). iKAGRA timing might have been off 1 sec!