2020.07.03
2018.11.14
2018.11.1
2018.10.25
2018.10.16
2018.8.24
2018.8.21
2018.8.17
Design
HighPowerBD_20200706_new.pdf
Assembly
Test in PSL room
Capper flange installation
Installation
Initial PRM (mis)alignment to the dump
DGS
High power test
Thermal conductivity
Circuit problem
Heat problem
Data fitting (cooling)
Data fitting (heating)
To protected page
LIGO design water cool dump
https://dcc.ligo.org/LIGO-T0900486/public
KAGRA/Subgroups/IOO/DUMP (last edited 2020-07-29 15:36:50 by naohisa.sato)